IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LBN_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Lebanon, 2019 - 2020
Get Microdata
Reference ID
LBN_2019_ES_v01_M
Producer(s)
The World Bank Group, The European Bank for Reconstruction and Development, The European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7111
Downloads
117
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lebanon_2019_full_data.dta

Over Last 3 Years, Was Max. Payback Time vs. Non-Energy Efficiency Measures (BMGc29)

Data file: lebanon_2019_full_data.dta

Overview

Valid: 17
Invalid: 515
Minimum: -9
Maximum: 3
Type: Discrete
Decimal: 0
Start: 1970
End: 1971
Width: 2
Range: -9 - 3
Format: Numeric

Questions and instructions

Literal question
Over the last three years, was this maximum payback time longer than, equal to, or shorter than the average one applied to non-energy efficiency related measures?
Categories
Value Category Cases
-9 Don't Know (Spontaneous) 4
23.5%
1 Longer 5
29.4%
2 Equal 3
17.6%
3 Shorter 5
29.4%
Sysmiss 515
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.