IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LBN_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Lebanon, 2019 - 2020
Get Microdata
Reference ID
LBN_2019_ES_v01_M
Producer(s)
The World Bank Group, The European Bank for Reconstruction and Development, The European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
6892
Downloads
114
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lebanon_2019_full_data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: lebanon_2019_full_data.dta

Overview

Valid: 27
Invalid: 505
Minimum: -6
Maximum: 730
Type: Discrete
Decimal: 0
Start: 186
End: 188
Width: 3
Range: -6 - 730
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 1
3.7%
-5 Application denied 9
33.3%
1 One day or less 0
0%
7 1
3.7%
10 2
7.4%
15 2
7.4%
20 1
3.7%
25 1
3.7%
90 2
7.4%
220 1
3.7%
240 1
3.7%
300 2
7.4%
365 1
3.7%
400 1
3.7%
630 1
3.7%
730 1
3.7%
Sysmiss 505
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.