IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LBN_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Lebanon, 2019 - 2020
Get Microdata
Reference ID
LBN_2019_ES_v01_M
Producer(s)
The World Bank Group, The European Bank for Reconstruction and Development, The European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
6836
Downloads
114
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lebanon_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: lebanon_2019_full_data.dta

Overview

Valid: 7
Invalid: 525
Minimum: 1
Maximum: 240
Type: Discrete
Decimal: 0
Start: 216
End: 218
Width: 3
Range: 1 - 240
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 3
42.9%
20 1
14.3%
30 2
28.6%
240 1
14.3%
Sysmiss 525
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.