IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SVK_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Slovak Republic, 2018 - 2020
Get Microdata
Reference ID
SVK_2019_ES_v01_M
Producer(s)
The World Bank Group, The European Bank for Reconstruction and Development, The European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8049
Downloads
130
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • slovakia_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: slovakia_2019_full_data.dta

Overview

Valid: 42
Invalid: 387
Minimum: -9
Maximum: 600
Type: Discrete
Decimal: 0
Start: 1244
End: 1246
Width: 3
Range: -9 - 600
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 3
7.1%
-6 Still in process 4
9.5%
-5 Application denied 1
2.4%
1 One day or less 1
2.4%
3 1
2.4%
14 2
4.8%
15 1
2.4%
20 2
4.8%
28 1
2.4%
30 9
21.4%
60 6
14.3%
75 1
2.4%
90 3
7.1%
100 1
2.4%
120 2
4.8%
180 2
4.8%
365 1
2.4%
600 1
2.4%
Sysmiss 387
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.