IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ARM_2019_MS_V01_M / variable [F3]
central

Micro-Enterprise Survey 2019

Armenia, 2019 - 2020
Get Microdata
Reference ID
ARM_2019_MS_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
6509
Downloads
157
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • armenia_micro_2019_full_data

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: armenia_micro_2019_full_data

Overview

Valid: 4
Invalid: 116
Type: Discrete
Decimal: 0
Start: 138
End: 139
Width: 2
Range: -9 - 10
Format: Numeric

Questions and instructions

Literal question
C.4 In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 2
50%
5 1
25%
10 1
25%
Sysmiss 116
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.