IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SOM_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Somalia, 2019 - 2020
Get Microdata
Reference ID
SOM_2019_ES_v01_M
Producer(s)
World Bank Group
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7048
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bosaso_and_mogadishu_2019_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: bosaso_and_mogadishu_2019_full_data

Overview

Valid: 66
Invalid: 184
Standard deviation: 3.963
Type: Discrete
Decimal: 0
Start: 184
End: 185
Width: 2
Range: -9 - 30
Format: Numeric

Questions and instructions

Literal question
C.13 In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 33
50%
2 9
13.6%
3 6
9.1%
4 4
6.1%
5 5
7.6%
6 3
4.5%
7 4
6.1%
9 1
1.5%
30 1
1.5%
Sysmiss 184
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.