IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ZMB_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Zambia, 2019 - 2020
Get Microdata
Reference ID
ZMB_2019_ES_v01_M
Producer(s)
The World Bank (WB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
6161
Downloads
168
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • zambia_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: zambia_2019_full_data.dta

Overview

Valid: 115
Invalid: 486
Minimum: -9
Maximum: 425
Type: Discrete
Decimal: 0
Start: 1894
End: 1896
Width: 3
Range: -9 - 425
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 7
6.1%
-6 Still in process 21
18.3%
-5 Application denied 1
0.9%
1 One day or less 3
2.6%
2 2
1.7%
3 2
1.7%
5 3
2.6%
6 2
1.7%
7 6
5.2%
10 2
1.7%
14 12
10.4%
20 1
0.9%
24 1
0.9%
25 1
0.9%
30 29
25.2%
31 1
0.9%
35 1
0.9%
60 3
2.6%
65 1
0.9%
68 2
1.7%
90 10
8.7%
92 1
0.9%
98 1
0.9%
250 1
0.9%
425 1
0.9%
Sysmiss 486
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.