IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ZMB_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Zambia, 2019 - 2020
Get Microdata
Reference ID
ZMB_2019_ES_v01_M
Producer(s)
The World Bank (WB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
6183
Downloads
168
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • zambia_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: zambia_2019_full_data.dta

Overview

Valid: 33
Invalid: 568
Minimum: -9
Maximum: 90
Type: Discrete
Decimal: 0
Start: 320
End: 321
Width: 2
Range: -9 - 90
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
3%
-6 Still in process 2
6.1%
-5 Application denied 0
0%
1 One day or less 1
3%
5 3
9.1%
7 6
18.2%
10 1
3%
13 1
3%
14 4
12.1%
30 9
27.3%
40 1
3%
60 3
9.1%
90 1
3%
Sysmiss 568
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.