IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SVN_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

Slovenia, 2008 - 2019
Get Microdata
Reference ID
SVN_2009-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
13023
Downloads
667
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Slovenia_2009_2013_2019.dta

Cost For Establishment To Re-Purchase All of Its Machinery (n7a)

Data file: Slovenia_2009_2013_2019.dta

Overview

Valid: 364
Invalid: 591
Minimum: -9
Maximum: 900000000
Type: Discrete
Decimal: 0
Start: 1136
End: 1144
Width: 9
Range: -9 - 900000000
Format: Numeric

Questions and instructions

Literal question
Hypothetically, if this establishment were to purchase all the machinery, vehicles, and equipment it uses now, in their current condition and regardless of whether the establishment owns them or not, how much would they cost, independently of whether they are owned, rented or leased?
Categories
Value Category Cases
-9 Don't know (spontaneous) 79
100%
Sysmiss 591
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.