IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SVN_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

Slovenia, 2008 - 2019
Get Microdata
Reference ID
SVN_2009-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
13256
Downloads
667
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Slovenia_2009_2013_2019.dta

Average Duration of Power Outages: Hours (_2019_c8a)

Data file: Slovenia_2009_2013_2019.dta

Overview

Valid: 69
Invalid: 886
Minimum: -9
Maximum: 10
Type: Discrete
Decimal: 0
Start: 1822
End: 1823
Width: 2
Range: -9 - 10
Format: Numeric

Questions and instructions

Literal question
How long did these power outages last on average?
- Hours
Categories
Value Category Cases
-9 Don't know (spontaneous) 3
4.3%
0 23
33.3%
1 14
20.3%
2 13
18.8%
3 5
7.2%
4 3
4.3%
5 3
4.3%
8 4
5.8%
10 1
1.4%
Sysmiss 886
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.