IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SVN_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

Slovenia, 2008 - 2019
Get Microdata
Reference ID
SVN_2009-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
13269
Downloads
667
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Slovenia_2009_2013_2019.dta

Describe Main New/Significantly Improved Process This Establishment Introduced (_2019_h6x)

Data file: Slovenia_2009_2013_2019.dta

Overview

Valid: 955
Invalid: -
Type: Continuous
Start: 2295
End: 2538
Width: 244
Range: -
Format: character

Questions and instructions

Literal question
Please describe in detail the main new or improved process that this establishment introduced during the last three years. The main innovative process is the innovative process that had the largest impact on the operations of the establishment during the last three years.
Interviewer instructions
DESCRIPTION SHOULD BE AS DETAILED AS POSSIBLE
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.