IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SVN_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

Slovenia, 2008 - 2019
Get Microdata
Reference ID
SVN_2009-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
13224
Downloads
667
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Slovenia_2009_2013_2019.dta

Over Last 3 Years, Adopt Other Pollution Control Measures (_2019_BMGc23j)

Data file: Slovenia_2009_2013_2019.dta

Overview

Valid: 401
Invalid: 554
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 3148
End: 3149
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 39
Literal question
Over the last three years, did this establishment adopt any of the following measures?
- Other pollution control measures
Categories
Value Category Cases
-9 Don't know (spontaneous) 7
1.7%
-7 Does not apply (spontaneous) 12
3%
1 Yes 49
12.2%
2 No 333
83%
Sysmiss 554
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
READ OUT IF OVER THE PHONE

ASK IF THE ANSWER TO AT LEAST TWO OPTIONS IS “YES”, OTHERWISE GO TO BMGC.25
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.