IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SVN_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

Slovenia, 2008 - 2019
Get Microdata
Reference ID
SVN_2009-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
13425
Downloads
667
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Slovenia_2009_2013_2019.dta

Change in total costs if electricity no longer an obstacle (_2013_ECAc31a1)

Data file: Slovenia_2009_2013_2019.dta

Overview

Valid: 71
Invalid: 884
Minimum: -9
Maximum: 3
Type: Discrete
Decimal: 0
Start: 3386
End: 3387
Width: 2
Range: -9 - 3
Format: Numeric

Questions and instructions

Literal question
Would this establishment’s total annual costs increase, remain the same or decrease over
the next fiscal year if electricity is no longer an obstacle?
Categories
Value Category Cases
-9 Don't know 2
2.8%
-8 Refused 0
0%
1 Increase 10
14.1%
2 Remain the same 25
35.2%
3 Decrease 34
47.9%
Sysmiss 884
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Question post text
If 2, -9, GO TO QUESTION C.30b
If 3, GO TO QUESTION C.31a3
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.