IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SVN_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

Slovenia, 2008 - 2019
Get Microdata
Reference ID
SVN_2009-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
12939
Downloads
667
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Slovenia_2009_2013_2019.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Slovenia_2009_2013_2019.dta

Overview

Valid: 71
Invalid: 884
Minimum: -9
Maximum: 995
Type: Discrete
Decimal: 0
Start: 557
End: 559
Width: 3
Range: -9 - 995
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 11
15.5%
-6 Still in process 9
12.7%
-5 Application denied 0
0%
1 One day or less 2
2.8%
2 1
1.4%
3 3
4.2%
4 1
1.4%
5 2
2.8%
7 1
1.4%
9 1
1.4%
10 3
4.2%
14 8
11.3%
15 1
1.4%
20 3
4.2%
21 3
4.2%
30 14
19.7%
60 2
2.8%
90 2
2.8%
100 1
1.4%
365 1
1.4%
995 2
2.8%
Sysmiss 884
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.