IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SVN_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

Slovenia, 2008 - 2019
Get Microdata
Reference ID
SVN_2009-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
13083
Downloads
667
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Slovenia_2009_2013_2019.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Slovenia_2009_2013_2019.dta

Overview

Valid: 262
Invalid: 693
Minimum: -9
Maximum: 730
Type: Discrete
Decimal: 0
Start: 858
End: 860
Width: 3
Range: -9 - 730
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 19
7.3%
-8 3
1.1%
-6 Still in process 43
16.4%
-5 Application denied 7
2.7%
1 One day or less 3
1.1%
2 2
0.8%
3 1
0.4%
6 1
0.4%
7 4
1.5%
14 9
3.4%
15 3
1.1%
20 3
1.1%
21 2
0.8%
25 1
0.4%
30 21
8%
40 2
0.8%
45 5
1.9%
50 2
0.8%
58 1
0.4%
60 33
12.6%
90 30
11.5%
100 1
0.4%
120 5
1.9%
150 3
1.1%
160 1
0.4%
178 1
0.4%
180 24
9.2%
240 1
0.4%
270 1
0.4%
300 4
1.5%
360 1
0.4%
364 1
0.4%
365 8
3.1%
370 1
0.4%
400 1
0.4%
500 3
1.1%
600 1
0.4%
700 4
1.5%
720 3
1.1%
730 3
1.1%
Sysmiss 693
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.