IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NIC_2019_PROSASRIE-EL_V01_M / variable [F7]
central

Sustainable Water Supply and Sanitation Project Impact Evaluation 2019, Endline Survey

Nicaragua, 2019
Get Microdata
Reference ID
NIC_2019_PROSASRIE-EL_v01_M
Producer(s)
The World Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
10964
Downloads
155
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • 00469_nicaragua_base_caps_anonymized.dta
  • 00469_nicaragua_base_hogares_infra_anonymized.dta
  • 00469_nicaragua_base_umas_anonymized.dta

C5. ¿Cuánto tiempo les tomó solucionarlo? (h_c5)

Data file: 00469_nicaragua_base_hogares_infra_anonymized.dta

Overview

Valid: 3145
Invalid: 1382
Minimum: -2
Maximum: 99
Mean: 2.08076311605723
Standard deviation: 3.89499116307999
Type: Discrete
Decimal: 0
Start: 489
End: 490
Width: 2
Range: -2 - 99
Format: Numeric

Questions and instructions

Question pretext
Si C4 no es ”4 o 99”
Literal question
C5. ¿Cuánto tiempo les tomó solucionarlo?
Categories
Value Category Cases
-2 Ns/nc 39
1.2%
0 138
4.4%
1 1964
62.4%
2 452
14.4%
3 239
7.6%
4 55
1.7%
5 36
1.1%
6 30
1%
7 22
0.7%
8 75
2.4%
9 1
0%
10 11
0.3%
12 3
0.1%
15 58
1.8%
16 1
0%
18 1
0%
20 8
0.3%
22 3
0.1%
30 6
0.2%
40 1
0%
99 2
0.1%
Sysmiss 1382
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.