IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PHL_2015-2018_S4PIE_V01_M / variable [F1]
central

Integrating Sanitation Programming in the Pantawid Pamilya Program 2015-2018, Impact Evaluation

Philippines, 2015 - 2018
Get Microdata
Reference ID
PHL_2015-2018_S4PIE_v01_M
Producer(s)
Claire Chase
Metadata
DDI/XML JSON
Created on
Oct 14, 2021
Last modified
Oct 14, 2021
Page views
25643
Downloads
310
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • endline_raw_hh.dta
  • export_panel_clean.dta
  • hh_characteristics_2.12.16.dta
  • hh_child_health_2.12.16.dta
  • hh_loans_2.12.16.dta
  • hh_roster_2.12.16.dta

E53 Period of Owning Bank Account (E53)

Data file: endline_raw_hh.dta

Overview

Valid: 104
Invalid: 2591
Minimum: 1
Maximum: 9999
Type: Discrete
Decimal: 0
Start: 157
End: 160
Width: 4
Range: 1 - 9999
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 12
11.5%
2 84
80.8%
9998 Refused 1
1%
9999 Don't Know 7
6.7%
Sysmiss 2591
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.