IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PHL_2015-2018_S4PIE_V01_M / variable [F2]
central

Integrating Sanitation Programming in the Pantawid Pamilya Program 2015-2018, Impact Evaluation

Philippines, 2015 - 2018
Get Microdata
Reference ID
PHL_2015-2018_S4PIE_v01_M
Producer(s)
Claire Chase
Metadata
DDI/XML JSON
Created on
Oct 14, 2021
Last modified
Oct 14, 2021
Page views
24683
Downloads
310
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • endline_raw_hh.dta
  • export_panel_clean.dta
  • hh_characteristics_2.12.16.dta
  • hh_child_health_2.12.16.dta
  • hh_loans_2.12.16.dta
  • hh_roster_2.12.16.dta

Construction Materials Floor (hhchar_material_floor)

Data file: export_panel_clean.dta

Overview

Valid: 5377
Invalid: 13
Minimum: 1
Maximum: 16
Type: Discrete
Decimal: 0
Start: 100
End: 101
Width: 2
Range: 1 - 16
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 1. Marble/ceramic/terrazzo 216
4%
2 2. Tile/flag 1060
19.7%
3 3. Cement plaster/brick masonry 1781
33.1%
4 4. High quality wood 370
6.9%
5 5. Dirt, packed mud, earth 373
6.9%
6 Medium/low quality wood 51
0.9%
7 Combination of materials, mostly strong 1503
28%
8 2
0%
9 5
0.1%
10 4
0.1%
11 7
0.1%
12 2
0%
13 1
0%
15 1
0%
16 1
0%
96 Other 0
0%
98 98. Refused (vol.) 0
0%
99 99. Don t Know (vol.) 0
0%
Sysmiss 13
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.