IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PHL_2015-2018_S4PIE_V01_M / variable [F3]
central

Integrating Sanitation Programming in the Pantawid Pamilya Program 2015-2018, Impact Evaluation

Philippines, 2015 - 2018
Get Microdata
Reference ID
PHL_2015-2018_S4PIE_v01_M
Producer(s)
Claire Chase
Metadata
DDI/XML JSON
Created on
Oct 14, 2021
Last modified
Oct 14, 2021
Page views
25800
Downloads
310
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • endline_raw_hh.dta
  • export_panel_clean.dta
  • hh_characteristics_2.12.16.dta
  • hh_child_health_2.12.16.dta
  • hh_loans_2.12.16.dta
  • hh_roster_2.12.16.dta

200 pesos (G12_A)

Data file: hh_characteristics_2.12.16.dta

Overview

Valid: 4079
Invalid: 35
Minimum: 1
Maximum: 2
Type: Discrete
Decimal: 0
Start: 1052
End: 1052
Width: 1
Range: 1 - 2
Format: Numeric

Questions and instructions

Question pretext
I am going to ask you to make some choices between receiving money at different points in time, either now or half a year from now. There is no right or wrong answer, I am just curious to hear what you prefer. If you were to choose between the following two options, which one will you choose?
-- Ngayon ay papipiliin ko po kayo sa pagitan ng pagtanggap ng pera sa iba’t ibang punto ng panahon, ngayon o kalahating taon mula ngayon. Wala pong tama o maling sagot, nais ko lang pong malaman kung alin ang mas gusto niyo.
Categories
Value Category Cases
1 1. Receive 200 pesos now 3599
88.2%
2 2. Receive 200 pesos half a year from now 480
11.8%
Sysmiss 35
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Question post text
1 CONTINUE TO G12_B
2 SKIP TO G12_I
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.