IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SDN_2018_PTDS_V01_M
central

Progress Towards Durable Solutions in Abu Shouk and El Salam IDP Camps, 2019

Sudan, 2018
Get Microdata
Reference ID
SDN_2018_PTDS_v01_M
Producer(s)
Sudanese Government's Joint Mechanism for Durable Solutions, Joint IDP Profiling Service, Durable Solutions Working Group, World Bank, Department for International Development, Swiss Development Cooperation, Cathotlic Relief Services, Plan International
Metadata
DDI/XML JSON
Created on
Oct 14, 2021
Last modified
Oct 14, 2021
Page views
9513
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Identification
  • Version
  • Scope
  • Producers and sponsors
  • Sampling
  • Survey instrument
  • Data collection
  • Data processing
  • Access policy
  • Data Access
  • Contacts
  • Metadata production
  • Identification

    Survey ID number

    SDN_2018_PTDS_v01_M

    Title

    Progress Towards Durable Solutions in Abu Shouk and El Salam IDP Camps, 2019

    Country
    Name Country code
    Sudan SDN
    Abstract

    The Government of Sudan and the international community are working together to jointly support durable solutions for Darfur's internally displaced people. The commitment is rooted in the Doha Document for Peace in Darfur (DDPD) from 2011, signed by the Government of Sudan, other major parties to the conflict and the international community, and which sets out the framework for peace in Darfur. The peace agreement and the Darfur Development Strategy (DDS) that followed constitute political commitments to support durable peace and development in Darfur. This pledge has resulted in piloting a durable solutions process in El Fasher in North Darfur.

    To reach durable solutions and end displacement, long-term planning based on agreed and jointly-owned comprehensive data is needed. To establish an agreed evidence base, a collaborative profiling approach was adopted that brought actors together to ensure trust and ownership of the results of the profiling exercise. An important aspect of this durable solutions profiling is that it places IDPs center-stage alongside the two other major stakeholders the Government of Sudan and the international community permitting the profiling results and recommendations to be owned and signed off by all parties. The durable solutions profiling exercise in El Fasher makes up step two: getting better informed about the displacement affected communities in the five-stage durable solutions process. The survey included 3002 households.

    It specifically aims to: provide a comprehensive profile of IDPs residing in Abu Shouk and El Salaam IDP camps; develop a better understanding of IDPs vulnerabilities, coping mechanisms, capacities and provide insight into IDPs perceptions and their future settlement intentions; provide a jointly agreed upon data set to help inform durable solutions programming responses; pilot a profiling exercise of displacement and joint durable solutions planning that could be replicated in other Sudan contexts with displaced populations.

    Unit of Analysis

    Household and individual

    Version

    Version Description

    v2.1: Edited, anonymous dataset for licensed distribution

    Scope

    Notes

    The survey includes the following topics:

    • Household main characteristics
    • Individual main characteristics
    • Education
    • Employment information
    • Dwelling characteristics
    • Health
    • Energy utilisation
    • Income sources
    • Social and community interactions
    • Assets ownership
    Topics
    Topic
    Health and Nutrition
    Health
    Food security
    Education
    Livelihood & Social cohesion
    Housing, Land and Property
    Domestic Needs/Household Support
    Settlement
    Connectivity
    Basic Needs

    Producers and sponsors

    Primary investigators
    Name
    Sudanese Government's Joint Mechanism for Durable Solutions
    Joint IDP Profiling Service
    Durable Solutions Working Group
    World Bank
    Department for International Development
    Swiss Development Cooperation
    Cathotlic Relief Services
    Plan International

    Sampling

    Sampling Procedure

    A sample of 3002 households was collected using a stratified cluster sampling approach. The sample was divided into four strata: IDPs in Abu Shouk camp, IDPs in El Salam camp, non-displaced people living in peri-urban El Fasher and non-displaced inhabitants of urban El Fasher. The four strata were divided into clusters of similar population size, based on a grid developed on a map of the areas. Clusters were selected from each stratum with a uniform probability of selection. The sampling was conducted in this manner, because there was no reliable population data available which would have made sampling probabilities to size possible. All the households in the selected enumeration areas were listed, while 12 were selected for interviews in each cluster in simple random draws. The listing exercise resulted in a significantly lower number of clusters than was planned. To compensate for the lower number of clusters, some of the listed clusters were selected for oversampling. To draw the sample, the listing data was restricted to IDP households in IDP clusters and non-displaced households in the El Fasher clusters. The World Bank calculated the sample and applied the weights to the collected data.

    Weighting

    Sampling weights were calculated and applied to each enumeration area depending on its size.

    Survey instrument

    Questionnaires

    The questionnaire includes the following sections: household information, household roster, household characteristics, food consumption, livestock, durable goods, wellbeing and opinions, conflict and displacement.

    Data collection

    Dates of Data Collection
    Start End
    2018-05-01 2018-07-31
    Data Collectors
    Name
    International Organization for Migration
    Data Collection Notes

    IOM collected the data during the enumeration and the households survey with the support of community representatives. Specifically, elders and youth representatives assisted in finding enumerators representing the IDP community. This team of enumerators were tasked with selecting households for the enumeration stage of the profiling and administering the household questionnaires. The team of enumerators were trained on the enumeration process and subsequently received a second training on the household survey process. Data was collected during May, June and July 2018.

    Data processing

    Data Editing

    Data was processed and anonymized with recoding and local suppressions.

    Access policy

    Archive where study is originally stored

    United Nations Refugee Agency Microdata Library
    https://microdata.unhcr.org/index.php/catalog/227
    Original Archive Study ID: UNHCR_SDN_PROFILING_2019_v2.1
    Cost: None

    Data Access

    Citation requirements

    Cite as follows:

    Sudanese Government's Joint Mechanism for Durable Solutions, JISP, DSWG, World Bank, DFID, SDC, CRS, Plan International (2019) Progress Towards Durable Solutions in Abu Shouk and El Salam IDP Camps. UNHCR microdata library: https://microdata.unhcr.org

    Contacts

    Contacts
    Name Affiliation Email
    Curation Team UNHCR microdata@unhcr.org

    Metadata production

    DDI Document ID

    DDI_SDN_2018_PTDS_v01_M

    Producers
    Name
    UNHCR
    Date of Metadata Production

    2021-05-12

    Metadata version

    DDI Document version

    Version 1 (May 2021). This version is identical to UNHCR DDI ID: UNHCR_SDN_PROFILING_2019_v2.1, except the following edits were made:

    • Minor spelling, grammatical, and formatting corrections
    • Specified the archive where study is originally stored
    • Description of external documents altered to reflect the document titles
    Back to Catalog
    IHSN Survey Catalog

    © IHSN Survey Catalog, All Rights Reserved.