IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / DNK_2020_ES_V01_M / variable [F1]
central

Enterprise Survey 2020

Denmark, 2020 - 2021
Get Microdata
Reference ID
DNK_2020_ES_v01_M
Producer(s)
The World Bank Group
Metadata
DDI/XML JSON
Created on
Jan 03, 2022
Last modified
Jan 03, 2022
Page views
6862
Downloads
166
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Denmark-2020-full-data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Denmark-2020-full-data.dta

Overview

Valid: 229
Invalid: 766
Minimum: -9
Maximum: 700
Type: Discrete
Decimal: 0
Start: 1823
End: 1825
Width: 3
Range: -9 - 700
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 29
12.7%
-6 Still in process 17
7.4%
-5 Application denied 1
0.4%
1 One day or less 0
0%
2 1
0.4%
7 3
1.3%
8 1
0.4%
10 3
1.3%
12 1
0.4%
14 18
7.9%
15 1
0.4%
18 1
0.4%
20 2
0.9%
21 9
3.9%
25 2
0.9%
28 6
2.6%
30 33
14.4%
31 1
0.4%
35 1
0.4%
40 3
1.3%
42 4
1.7%
45 4
1.7%
49 1
0.4%
56 2
0.9%
60 31
13.5%
70 1
0.4%
72 1
0.4%
85 1
0.4%
90 25
10.9%
100 4
1.7%
112 1
0.4%
120 6
2.6%
150 3
1.3%
180 5
2.2%
240 1
0.4%
270 1
0.4%
300 1
0.4%
365 2
0.9%
450 1
0.4%
700 1
0.4%
Sysmiss 766
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.