IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / DNK_2020_ES_V01_M / variable [F1]
central

Enterprise Survey 2020

Denmark, 2020 - 2021
Get Microdata
Reference ID
DNK_2020_ES_v01_M
Producer(s)
The World Bank Group
Metadata
DDI/XML JSON
Created on
Jan 03, 2022
Last modified
Jan 03, 2022
Page views
6782
Downloads
166
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Denmark-2020-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Denmark-2020-full-data.dta

Overview

Valid: 218
Invalid: 777
Minimum: -9
Maximum: 180
Type: Discrete
Decimal: 0
Start: 284
End: 286
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 102
46.8%
-6 Still in process 3
1.4%
-5 Application denied 0
0%
1 One day or less 22
10.1%
2 3
1.4%
3 2
0.9%
4 4
1.8%
5 2
0.9%
7 12
5.5%
10 2
0.9%
14 16
7.3%
20 2
0.9%
21 5
2.3%
30 18
8.3%
35 1
0.5%
40 3
1.4%
42 1
0.5%
45 1
0.5%
60 5
2.3%
62 1
0.5%
70 1
0.5%
84 1
0.5%
90 5
2.3%
120 3
1.4%
150 1
0.5%
180 2
0.9%
Sysmiss 777
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.