IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / DNK_2020_ES_V01_M / variable [F1]
central

Enterprise Survey 2020

Denmark, 2020 - 2021
Get Microdata
Reference ID
DNK_2020_ES_v01_M
Producer(s)
The World Bank Group
Metadata
DDI/XML JSON
Created on
Jan 03, 2022
Last modified
Jan 03, 2022
Page views
6616
Downloads
166
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Denmark-2020-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Denmark-2020-full-data.dta

Overview

Valid: 61
Invalid: 934
Minimum: -9
Maximum: 180
Type: Discrete
Decimal: 0
Start: 312
End: 314
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 27
44.3%
-6 Still in process 2
3.3%
-5 Application denied 0
0%
1 One day or less 7
11.5%
2 2
3.3%
5 1
1.6%
7 5
8.2%
14 2
3.3%
21 1
1.6%
25 1
1.6%
28 2
3.3%
30 4
6.6%
60 3
4.9%
90 1
1.6%
120 1
1.6%
180 2
3.3%
Sysmiss 934
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.