{"type":"survey","study_desc":{"title_statement":{"idno":"ALB_2017_WBCS_v01_M","title":"World Bank Group Country Survey 2017","alt_title":"WBCS 2017"},"authoring_entity":[{"name":"Public Opinion Research Group","affiliation":"World Bank Group"}],"production_statement":{"funding_agencies":[{"name":"World Bank Group","abbreviation":"","role":""}]},"distribution_statement":{"contact":[{"name":"Svetlana Markova","affiliation":"ECRCC","email":"smarkova@worldbankgroup.org","uri":""}],"depositor":[{"name":"Dania Mendoza","abbreviation":"ECRCC","affiliation":"The World Bank Group"}]},"series_statement":{"series_name":"Country Opinion Survey","series_info":"The World Bank Group Country Opinion Survey Program systematically measures and tracks the perceptions of the World Bank's clients, partners, and other stakeholders across the globe in client countries. The Public Opinion Research Group surveyed 29 countries in FY2012 (July 2011-June 2012), 41 countries in FY2013 (July 2012-June 2013), 42 countries in FY2014 (July 2013-June 2014), 35 countries in FY2015 (July 2014-June 2015), and 45 countries in FY2016 (July 2015-June 2016). In FY2017, surveys were conducted in 35 countries. Nearly all of the World Bank Group's client countries are surveyed in every three year cycle."},"version_statement":{"version":"- v01: edited and anonymous data for public distribution."},"study_info":{"abstract":"The Country Opinion Survey in Albania assists the World Bank Group (WBG) in gaining a better understanding of how stakeholders in Albania perceive the WBG. It provides the WBG with systematic feedback from national and local governments, multilateral\/bilateral agencies, media, academia, the private sector, and civil society in Albania on: \n1) their views regarding the general environment in Albania; \n2) their overall attitudes toward the WBG in Albania; \n3) overall impressions of the WBG\u2019s effectiveness and results, knowledge work and activities, and communication and information sharing in Albania; and \n4) their perceptions of the WBG\u2019s future role in Albania.","coll_dates":[{"start":"2017-04","end":"2017-05","cycle":""}],"nation":[{"name":"Albania","abbreviation":"ALB"}],"geog_coverage":"Tirana and Durr\u00ebs, North Albania, Central Albania and South Albania.","analysis_unit":"Stakeholders of the World Bank Group in Albania.","universe":"Opinion leaders from national and local governments, multilateral\/bilateral agencies, media, academia, the private sector, and civil society.","data_kind":"Sample survey data [ssd]","notes":"The scope of the study includes: \n- General Issues Facing Albania\n- Overall Attitudes toward the World Bank Group \n- World Bank Group\u2019s Effectiveness and Results\n- The World Bank Group\u2019s Knowledge Work and Activities\n- Working with the World Bank Group\n- The Future Role of the World Bank Group in Albania\n- Communication and Information Sharing\n- Background Information","study_scope":"The scope of the study includes: \n- General Issues Facing Albania\n- Overall Attitudes toward the World Bank Group \n- World Bank Group\u2019s Effectiveness and Results\n- The World Bank Group\u2019s Knowledge Work and Activities\n- Working with the World Bank Group\n- The Future Role of the World Bank Group in Albania\n- Communication and Information Sharing\n- Background Information"},"method":{"data_collection":{"data_collectors":[{"name":"IDRA Research and Consulting","abbreviation":"","affiliation":""}],"sampling_procedure":"From April to May 2017, 530 stakeholders of the WBG in Albania were invited to provide their opinions on the WBG\u2019s work in the country by participating in a Country Opinion Survey (COS).  Participants were drawn from the office of the President\/Prime Minister, office of a Minister, office of a Parliamentarian, employees of ministries\/ministerial departments\/implementation agencies, Project Management Units (PMUs) overseeing implementation of WBG projects or consultants\/contractors working on WBG-supported projects\/programs, local government officials or staff, bilateral\/multilateral agencies, private sector organizations, private foundations, the financial sector\/private banks, NGOs\/community-based organizations (CBOs), the media, independent government institutions, trade unions, faith-based groups, youth groups, academia\/research institutes\/think tanks, and the judiciary branch.","coll_mode":"Other [oth]","research_instrument":"English and Albanian. The English version is provided as related material.","coll_situation":"Via Post and email\/ online.","weight":"The results of this year\u2019s Country Survey were compared to those of the Country Survey conducted in FY \u201914 (response rate was 48%, N = 248). The data were weighted to reach similar stakeholder compositions across the two survey years, allowing for more statistically reliable comparisons. Note, there were insufficient numbers of respondents from local government in FY14 to be included in these analyses. Also, stakeholders who identified themselves as \u201cOther\u201d in the stakeholder category options were not included in these comparisons. As a result, mean ratings, percentages of respondents, and the total number of respondents in both years are slightly different from those of the original data reported in the FY \u201914 COS report and the non-weighted data presented in this report. For the weighted stakeholder breakdown and year comparison results, please refer to Appendix E (see page 89) in the Related Materials."},"analysis_info":{"response_rate":"63%"}},"data_access":{"dataset_use":{"cit_req":"Use of the dataset must be acknowledged using a citation which would include:\n- the Identification of the Primary Investigator\n- the title of the survey (including country, acronym and year of implementation)\n- the survey reference number\n- the source and date of download\n\nExample\nPublic Opinion Research Group (The World Bank Group). Albania - World Bank Group Country Survey (WBCS) 2017, Ref. ALB_2017_WBCS_v01_M. Dataset downloaded from [url] on [date].","disclaimer":"The user of the data acknowledges that the original collector of the data, the authorized distributor of the data, and the relevant funding agency bear no responsibility for use of the data or for interpretations or inferences based upon such uses."}}},"data_files":[{"file_id":"F1","file_name":"albania_cos_fy17_final_","description":"- Section A: General Issues Facing Albania;\n- Section B: Overall attitudes toward the World Bank Group;\n- Section C: World Bank Group's effectiveness and results;\n- Section D: The World Bank Group's knowledge work and activities (i.e., Analysis, studies, research, data, reports, conferences);\n- Section E: Working with the World Bank Group;\n- Section F: The future role of the World Bank Group in Albania;\n- Section G: Communication and information sharing; and\n- Section H: Background information.","case_count":"332","var_count":"333","producer":null,"data_checks":null,"missing_data":null,"version":null,"notes":null}],"variables":[{"vid":"V1","name":"id","file_id":"F1","var_dcml":"0","var_intrvl":"contin","var_start_pos":"1","var_end_pos":"3","var_width":"3","var_rec_seg_no":"1","labl":"id","var_qstn_qstnlit":"Id","var_val_range":[{"units":"REAL","min":"101","max":"432"}],"var_sumstat":[{"value":"332","type":"vald"},{"value":"0","type":"invd"},{"value":"101","type":"min"},{"value":"432","type":"max"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V2","name":"a1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"4","var_end_pos":"6","var_width":"3","var_rec_seg_no":"1","labl":"In general would you say that Albania is headed in ... ?","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA1. In general would you say that Albania is headed in ... ?","var_val_range":[{"units":"REAL","min":"1","max":"3"}],"var_sumstat":[{"value":"326","type":"vald"},{"value":"6","type":"invd"},{"value":"1","type":"min"},{"value":"3","type":"max"}],"var_catgry":[{"value":"1","labl":"The right direction","stats":"192","type":"freq"},{"value":"2","labl":"The wrong direction","stats":"43","type":"freq"},{"value":"3","labl":"Not sure","stats":"91","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V3","name":"a2_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"7","var_end_pos":"9","var_width":"3","var_rec_seg_no":"1","labl":"Social protection","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n1 Social protection (e.g., pensions, targeted social assistance)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"308","type":"freq"},{"value":"1","labl":null,"stats":"21","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V4","name":"a2_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"10","var_end_pos":"12","var_width":"3","var_rec_seg_no":"1","labl":"Gender equity","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n2 Gender equity","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"324","type":"freq"},{"value":"1","labl":null,"stats":"5","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V5","name":"a2_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"13","var_end_pos":"15","var_width":"3","var_rec_seg_no":"1","labl":"Private sector development","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n3 Private sector development","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"282","type":"freq"},{"value":"1","labl":null,"stats":"47","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V6","name":"a2_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"16","var_end_pos":"18","var_width":"3","var_rec_seg_no":"1","labl":"Education","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n4 Education","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"238","type":"freq"},{"value":"1","labl":null,"stats":"91","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V7","name":"a2_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"19","var_end_pos":"21","var_width":"3","var_rec_seg_no":"1","labl":"Public sector governance\/reform","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n5 Public sector governance\/reform (i.e., government effectiveness, public financial management, public expenditure, fiscal system reform)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"250","type":"freq"},{"value":"1","labl":null,"stats":"79","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V8","name":"a2_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"22","var_end_pos":"24","var_width":"3","var_rec_seg_no":"1","labl":"Global\/regional integration","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n6 Global\/regional integration","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"316","type":"freq"},{"value":"1","labl":null,"stats":"13","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V9","name":"a2_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"25","var_end_pos":"27","var_width":"3","var_rec_seg_no":"1","labl":"Foreign direct investment","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n7 Foreign direct investment","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"288","type":"freq"},{"value":"1","labl":null,"stats":"41","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V10","name":"a2_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"28","var_end_pos":"30","var_width":"3","var_rec_seg_no":"1","labl":"Urban development","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n8 Urban development","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"308","type":"freq"},{"value":"1","labl":null,"stats":"21","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V11","name":"a2_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"31","var_end_pos":"33","var_width":"3","var_rec_seg_no":"1","labl":"Energy","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n9 Energy","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"312","type":"freq"},{"value":"1","labl":null,"stats":"17","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V12","name":"a2_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"34","var_end_pos":"36","var_width":"3","var_rec_seg_no":"1","labl":"Water and sanitation","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n10 Water and sanitation","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"319","type":"freq"},{"value":"1","labl":null,"stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V13","name":"a2_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"37","var_end_pos":"39","var_width":"3","var_rec_seg_no":"1","labl":"Pollution","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n11 Pollution","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"322","type":"freq"},{"value":"1","labl":null,"stats":"7","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V14","name":"a2_12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"40","var_end_pos":"42","var_width":"3","var_rec_seg_no":"1","labl":"Job creation\/employment","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n12 Job creation\/employment","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"271","type":"freq"},{"value":"1","labl":null,"stats":"58","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V15","name":"a2_13","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"43","var_end_pos":"45","var_width":"3","var_rec_seg_no":"1","labl":"Health","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n13 Health","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"274","type":"freq"},{"value":"1","labl":null,"stats":"55","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V16","name":"a2_14","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"46","var_end_pos":"48","var_width":"3","var_rec_seg_no":"1","labl":"Financial markets","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n14 Financial markets","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"323","type":"freq"},{"value":"1","labl":null,"stats":"6","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V17","name":"a2_15","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"49","var_end_pos":"51","var_width":"3","var_rec_seg_no":"1","labl":"Transport","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n15 Transport (e.g., roads, bridges, transportation)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"309","type":"freq"},{"value":"1","labl":null,"stats":"20","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V18","name":"a2_16","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"52","var_end_pos":"54","var_width":"3","var_rec_seg_no":"1","labl":"Agriculture and rural development","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n16 Agriculture and rural development","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"272","type":"freq"},{"value":"1","labl":null,"stats":"57","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V19","name":"a2_17","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"55","var_end_pos":"57","var_width":"3","var_rec_seg_no":"1","labl":"Trade and exports","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n17 Trade and exports","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"314","type":"freq"},{"value":"1","labl":null,"stats":"15","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V20","name":"a2_18","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"58","var_end_pos":"60","var_width":"3","var_rec_seg_no":"1","labl":"Crime and violence","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n18 Crime and violence","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"314","type":"freq"},{"value":"1","labl":null,"stats":"15","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V21","name":"a2_19","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"61","var_end_pos":"63","var_width":"3","var_rec_seg_no":"1","labl":"Natural resource management","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n19 Natural resource management (renewable)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"306","type":"freq"},{"value":"1","labl":null,"stats":"23","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V22","name":"a2_20","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"64","var_end_pos":"66","var_width":"3","var_rec_seg_no":"1","labl":"Climate change","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n20 Climate change (e.g., mitigation, adaptation)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"327","type":"freq"},{"value":"1","labl":null,"stats":"2","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V23","name":"a2_21","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"67","var_end_pos":"69","var_width":"3","var_rec_seg_no":"1","labl":"Poverty reduction","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n21 Poverty reduction","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"280","type":"freq"},{"value":"1","labl":null,"stats":"49","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V24","name":"a2_22","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"70","var_end_pos":"72","var_width":"3","var_rec_seg_no":"1","labl":"Anti-corruption","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n22 Anti corruption","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"254","type":"freq"},{"value":"1","labl":null,"stats":"75","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V25","name":"a2_23","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"73","var_end_pos":"75","var_width":"3","var_rec_seg_no":"1","labl":"Judiciary reform","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n23 Judiciary reform","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"205","type":"freq"},{"value":"1","labl":null,"stats":"124","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V26","name":"a2_24","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"76","var_end_pos":"78","var_width":"3","var_rec_seg_no":"1","labl":"Economic growth","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n24 Economic growth","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"262","type":"freq"},{"value":"1","labl":null,"stats":"67","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V27","name":"a2_25","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"79","var_end_pos":"81","var_width":"3","var_rec_seg_no":"1","labl":"Disaster risk management","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n25 Disaster risk management","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"327","type":"freq"},{"value":"1","labl":null,"stats":"2","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V28","name":"a2_26","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"82","var_end_pos":"84","var_width":"3","var_rec_seg_no":"1","labl":"Equality of opportunity","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n26 Equality of opportunity (i.e., social inclusion)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"317","type":"freq"},{"value":"1","labl":null,"stats":"12","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V29","name":"a2_27","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"85","var_end_pos":"87","var_width":"3","var_rec_seg_no":"1","labl":"Environmental sustainability","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n27 Environmental sustainability","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"314","type":"freq"},{"value":"1","labl":null,"stats":"15","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V30","name":"a2_28","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"88","var_end_pos":"90","var_width":"3","var_rec_seg_no":"1","labl":"Information and communications technology","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA2. Listed below are a number of development priorities in Albania.\n\nPlease identify which of the following you consider the most important development priorities in Albania.\n\n28 Information and communications technology","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"318","type":"freq"},{"value":"1","labl":null,"stats":"11","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V31","name":"a3_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"91","var_end_pos":"93","var_width":"3","var_rec_seg_no":"1","labl":"Economic growth","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n1 Economic growth","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"200","type":"freq"},{"value":"1","labl":null,"stats":"129","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V32","name":"a3_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"94","var_end_pos":"96","var_width":"3","var_rec_seg_no":"1","labl":"Disaster risk management","var_qstn_qstnlit":"A3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n2 Disaster risk management","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"327","type":"freq"},{"value":"1","labl":null,"stats":"2","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V33","name":"a3_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"97","var_end_pos":"99","var_width":"3","var_rec_seg_no":"1","labl":"Equality of opportunity","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n3 Equality of opportunity (i.e., social inclusion)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"300","type":"freq"},{"value":"1","labl":null,"stats":"29","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V34","name":"a3_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"100","var_end_pos":"102","var_width":"3","var_rec_seg_no":"1","labl":"Environmental sustainability","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n4 Environmental sustainability","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"321","type":"freq"},{"value":"1","labl":null,"stats":"8","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V35","name":"a3_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"103","var_end_pos":"105","var_width":"3","var_rec_seg_no":"1","labl":"Information and communications technology","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n5 Information and communications technology","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"326","type":"freq"},{"value":"1","labl":null,"stats":"3","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V36","name":"a3_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"106","var_end_pos":"108","var_width":"3","var_rec_seg_no":"1","labl":"Social protection","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n6 Social protection (e.g., pensions, targeted social assistance)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"289","type":"freq"},{"value":"1","labl":null,"stats":"40","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V37","name":"a3_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"109","var_end_pos":"111","var_width":"3","var_rec_seg_no":"1","labl":"Agriculture and rural development","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n7 Agriculture and rural development","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"219","type":"freq"},{"value":"1","labl":null,"stats":"110","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V38","name":"a3_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"112","var_end_pos":"114","var_width":"3","var_rec_seg_no":"1","labl":"Trade and exports","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n8 Trade and exports","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"314","type":"freq"},{"value":"1","labl":null,"stats":"15","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V39","name":"a3_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"115","var_end_pos":"117","var_width":"3","var_rec_seg_no":"1","labl":"Crime and violence","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n9 Crime and violence","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"327","type":"freq"},{"value":"1","labl":null,"stats":"2","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V40","name":"a3_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"118","var_end_pos":"120","var_width":"3","var_rec_seg_no":"1","labl":"Climate change","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n10 Climate change (e.g., mitigation, adaptation)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"328","type":"freq"},{"value":"1","labl":null,"stats":"1","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V41","name":"a3_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"121","var_end_pos":"123","var_width":"3","var_rec_seg_no":"1","labl":"Transport","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n11 Transport (e.g., roads, bridges, transportation)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"319","type":"freq"},{"value":"1","labl":null,"stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V42","name":"a3_12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"124","var_end_pos":"126","var_width":"3","var_rec_seg_no":"1","labl":"Energy","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n12 Energy","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"320","type":"freq"},{"value":"1","labl":null,"stats":"9","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V43","name":"a3_13","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"127","var_end_pos":"129","var_width":"3","var_rec_seg_no":"1","labl":"Anti-corruption","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n13 Anti corruption","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"285","type":"freq"},{"value":"1","labl":null,"stats":"44","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V44","name":"a3_14","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"130","var_end_pos":"132","var_width":"3","var_rec_seg_no":"1","labl":"Judiciary reform","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n14 Judiciary reform","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"290","type":"freq"},{"value":"1","labl":null,"stats":"39","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V45","name":"a3_15","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"133","var_end_pos":"135","var_width":"3","var_rec_seg_no":"1","labl":"Water and sanitation","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n15 Water and sanitation","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"322","type":"freq"},{"value":"1","labl":null,"stats":"7","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V46","name":"a3_16","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"136","var_end_pos":"138","var_width":"3","var_rec_seg_no":"1","labl":"Pollution","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n16 Pollution","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"327","type":"freq"},{"value":"1","labl":null,"stats":"2","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V47","name":"a3_17","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"139","var_end_pos":"141","var_width":"3","var_rec_seg_no":"1","labl":"Job creation\/employment","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n17 Job creation\/employment","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"184","type":"freq"},{"value":"1","labl":null,"stats":"145","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V48","name":"a3_18","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"142","var_end_pos":"144","var_width":"3","var_rec_seg_no":"1","labl":"Health","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n18 Health","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"319","type":"freq"},{"value":"1","labl":null,"stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V49","name":"a3_19","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"145","var_end_pos":"147","var_width":"3","var_rec_seg_no":"1","labl":"Financial markets","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n19 Financial markets","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"318","type":"freq"},{"value":"1","labl":null,"stats":"11","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V50","name":"a3_20","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"148","var_end_pos":"150","var_width":"3","var_rec_seg_no":"1","labl":"Public sector governance\/reform","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n20 Public sector governance\/reform (i.e., government effectiveness, public financial management, public expenditure, fiscal system reform)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"267","type":"freq"},{"value":"1","labl":null,"stats":"62","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V51","name":"a3_21","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"151","var_end_pos":"153","var_width":"3","var_rec_seg_no":"1","labl":"Gender equity","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n21 Gender equity","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"325","type":"freq"},{"value":"1","labl":null,"stats":"4","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V52","name":"a3_22","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"154","var_end_pos":"156","var_width":"3","var_rec_seg_no":"1","labl":"Private sector development","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n22 Private sector development","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"242","type":"freq"},{"value":"1","labl":null,"stats":"87","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V53","name":"a3_23","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"157","var_end_pos":"159","var_width":"3","var_rec_seg_no":"1","labl":"Education","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n23 Education","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"255","type":"freq"},{"value":"1","labl":null,"stats":"74","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V54","name":"a3_24","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"160","var_end_pos":"162","var_width":"3","var_rec_seg_no":"1","labl":"Global\/regional integration","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n24 Global\/regional integration","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"319","type":"freq"},{"value":"1","labl":null,"stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V55","name":"a3_25","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"163","var_end_pos":"165","var_width":"3","var_rec_seg_no":"1","labl":"Foreign direct investment","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n25 Foreign direct investment","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"256","type":"freq"},{"value":"1","labl":null,"stats":"73","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V56","name":"a3_26","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"166","var_end_pos":"168","var_width":"3","var_rec_seg_no":"1","labl":"Urban development","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n26 Urban development","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"313","type":"freq"},{"value":"1","labl":null,"stats":"16","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V57","name":"a3_27","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"169","var_end_pos":"171","var_width":"3","var_rec_seg_no":"1","labl":"Natural resource management","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA3. Poverty reduction is a broad term that encompasses work in many different areas.\nWhich THREE areas of development listed below do you believe would contribute most to reducing\npoverty in Albania?\n\n27 Natural resource management (renewable)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"329","type":"vald"},{"value":"3","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"310","type":"freq"},{"value":"1","labl":null,"stats":"19","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V58","name":"a4_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"172","var_end_pos":"174","var_width":"3","var_rec_seg_no":"1","labl":"Greater access to health and nutrition for citizens","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n1 Greater access to health and nutrition for citizens","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"297","type":"freq"},{"value":"1","labl":null,"stats":"25","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V59","name":"a4_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"175","var_end_pos":"177","var_width":"3","var_rec_seg_no":"1","labl":"Better entrepreneurial opportunities (i.e., to start small and medium sized businesses)","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n2 Better entrepreneurial opportunities (i.e., to start small and medium sized businesses)","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"266","type":"freq"},{"value":"1","labl":null,"stats":"56","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V60","name":"a4_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"178","var_end_pos":"180","var_width":"3","var_rec_seg_no":"1","labl":"A growing middle class","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n3 A growing middle class","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"252","type":"freq"},{"value":"1","labl":null,"stats":"70","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V61","name":"a4_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"181","var_end_pos":"183","var_width":"3","var_rec_seg_no":"1","labl":"Better opportunity for the poor who live in rural areas","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n4 Better opportunity for the poor who live in rural areas","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"281","type":"freq"},{"value":"1","labl":null,"stats":"41","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V62","name":"a4_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"184","var_end_pos":"186","var_width":"3","var_rec_seg_no":"1","labl":"Better opportunity for the poor who live in urban areas","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n5 Better opportunity for the poor who live in urban areas","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"305","type":"freq"},{"value":"1","labl":null,"stats":"17","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V63","name":"a4_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"187","var_end_pos":"189","var_width":"3","var_rec_seg_no":"1","labl":"Consistent economic growth","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n6 Consistent economic growth","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"201","type":"freq"},{"value":"1","labl":null,"stats":"121","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V64","name":"a4_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"190","var_end_pos":"192","var_width":"3","var_rec_seg_no":"1","labl":"More reliable social safety net","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n7 More reliable social safety net","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"298","type":"freq"},{"value":"1","labl":null,"stats":"24","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V65","name":"a4_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"193","var_end_pos":"195","var_width":"3","var_rec_seg_no":"1","labl":"Greater access to micro-finance for the poor","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n8 Greater access to micro-finance for the poor","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"305","type":"freq"},{"value":"1","labl":null,"stats":"17","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V66","name":"a4_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"196","var_end_pos":"198","var_width":"3","var_rec_seg_no":"1","labl":"Greater voice and participation for citizens to help ensure greater accountability","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n9 Greater voice and participation for citizens to help ensure greater accountability","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"283","type":"freq"},{"value":"1","labl":null,"stats":"39","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V67","name":"a4_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"199","var_end_pos":"201","var_width":"3","var_rec_seg_no":"1","labl":"Education and training that better ensure job opportunity","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n10 Education and training that better ensure job opportunity","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"227","type":"freq"},{"value":"1","labl":null,"stats":"95","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V68","name":"a4_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"202","var_end_pos":"204","var_width":"3","var_rec_seg_no":"1","labl":"Better quality public services","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n11 Better quality public services","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"285","type":"freq"},{"value":"1","labl":null,"stats":"37","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V69","name":"a4_12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"205","var_end_pos":"207","var_width":"3","var_rec_seg_no":"1","labl":"Better employment opportunities for young people","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n12 Better employment opportunities for young people","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"249","type":"freq"},{"value":"1","labl":null,"stats":"73","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V70","name":"a4_13","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"208","var_end_pos":"210","var_width":"3","var_rec_seg_no":"1","labl":"Better employment opportunities for women","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n13 Better employment opportunities for women","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"303","type":"freq"},{"value":"1","labl":null,"stats":"19","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V71","name":"a4_14","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"211","var_end_pos":"213","var_width":"3","var_rec_seg_no":"1","labl":"Other","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA4. The World Bank Group\u2019s \u201cShared Prosperity\u201d goal captures two key elements, economic growth and equity. It will seek to foster income growth among the bottom 40 percent of a country\u2019s population. Improvement in the Shared Prosperity Indicator requires growth and well-being of the less well-off. When thinking about the idea of \u201cshared prosperity\u201d in your country, which of the following TWO best illustrate how this would be achieved in Albania?\n\n14 Other (please specify):","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"321","type":"freq"},{"value":"1","labl":null,"stats":"1","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V72","name":"a5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"214","var_end_pos":"216","var_width":"3","var_rec_seg_no":"1","labl":"Do you think the gap between the rich and the poor is a very big problem, a moderately big problem, a small problem or not a problem at all in Albania?","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA5. Do you think the gap between the rich and the poor is a very big problem, a moderately big problem, a small problem or not a problem at all in Albania?","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"5"}],"var_sumstat":[{"value":"321","type":"vald"},{"value":"11","type":"invd"},{"value":"1","type":"min"},{"value":"5","type":"max"}],"var_catgry":[{"value":"1","labl":"A very big problem","stats":"128","type":"freq"},{"value":"2","labl":"A moderately big problem","stats":"150","type":"freq"},{"value":"3","labl":"A small problem","stats":"32","type":"freq"},{"value":"4","labl":"Not a problem at all","stats":"2","type":"freq"},{"value":"5","labl":"Don\u00e2\u20ac\u2122t know","stats":"9","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V73","name":"a6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"217","var_end_pos":"219","var_width":"3","var_rec_seg_no":"1","labl":"In your view, is climate change a very serious problem, somewhat serious, not too serious, or not a problem in your country?","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA6. In your view, is climate change a very serious problem, somewhat serious, not too serious, or not a\nproblem in your country?","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"5"}],"var_sumstat":[{"value":"320","type":"vald"},{"value":"12","type":"invd"},{"value":"1","type":"min"},{"value":"5","type":"max"}],"var_catgry":[{"value":"1","labl":"A very serious problem","stats":"72","type":"freq"},{"value":"2","labl":"A somewhat serious problem","stats":"155","type":"freq"},{"value":"3","labl":"Not too serious problem","stats":"74","type":"freq"},{"value":"4","labl":"Not a problem","stats":"16","type":"freq"},{"value":"5","labl":"Don\u00e2\u20ac\u2122t know","stats":"3","type":"freq"},{"value":"-99","labl":null,"stats":"4","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V74","name":"a7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"220","var_end_pos":"222","var_width":"3","var_rec_seg_no":"1","labl":"In your view, is early childhood development (i.e. nutrition, growth, care, and education) a very important, moderately important, slightly important, or not an important development priority in Albania?","var_qstn_qstnlit":"SECTION A: GENERAL ISSUES FACING ALBANIA\n\nA7. In your view, is early childhood development (i.e. nutrition, growth, care, and education) a very important, moderately important, slightly important, or not an important development priority in Albania?","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"5"}],"var_sumstat":[{"value":"319","type":"vald"},{"value":"13","type":"invd"},{"value":"1","type":"min"},{"value":"5","type":"max"}],"var_catgry":[{"value":"1","labl":"A very important development priority","stats":"250","type":"freq"},{"value":"2","labl":"A moderately important development priority","stats":"50","type":"freq"},{"value":"3","labl":"A slightly important development priority","stats":"11","type":"freq"},{"value":"4","labl":"Not an important development priority","stats":"6","type":"freq"},{"value":"5","labl":"Don't know","stats":"2","type":"freq"},{"value":"-99","labl":null,"stats":"5","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V75","name":"b1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"223","var_end_pos":"225","var_width":"3","var_rec_seg_no":"1","labl":"How familiar are you with the work of the World Bank Group in Albania?","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB1. How familiar are you with the work of the World Bank Group in Albania?","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"321","type":"vald"},{"value":"11","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not familiar at all","stats":"9","type":"freq"},{"value":"2","labl":null,"stats":"9","type":"freq"},{"value":"3","labl":null,"stats":"17","type":"freq"},{"value":"4","labl":null,"stats":"22","type":"freq"},{"value":"5","labl":null,"stats":"37","type":"freq"},{"value":"6","labl":null,"stats":"32","type":"freq"},{"value":"7","labl":null,"stats":"53","type":"freq"},{"value":"8","labl":null,"stats":"67","type":"freq"},{"value":"9","labl":null,"stats":"44","type":"freq"},{"value":"10","labl":"Extremely familiar","stats":"31","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V76","name":"b2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"226","var_end_pos":"228","var_width":"3","var_rec_seg_no":"1","labl":"Overall, please rate your impression of the World Bank Group's effectiveness in Albania.","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB2. Overall, please rate your impression of the World Bank Group\u2019s effectiveness in Albania.","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"294","type":"vald"},{"value":"38","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"9","type":"freq"},{"value":"4","labl":null,"stats":"14","type":"freq"},{"value":"5","labl":null,"stats":"36","type":"freq"},{"value":"6","labl":null,"stats":"21","type":"freq"},{"value":"7","labl":null,"stats":"58","type":"freq"},{"value":"8","labl":null,"stats":"63","type":"freq"},{"value":"9","labl":null,"stats":"59","type":"freq"},{"value":"10","labl":"Very effective","stats":"32","type":"freq"},{"value":"-99","labl":null,"stats":"4","type":"freq"},{"value":"11","labl":"Don't know","stats":"25","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"9","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V77","name":"b3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"229","var_end_pos":"231","var_width":"3","var_rec_seg_no":"1","labl":"To what extent do you believe the World Bank Group's staff is well prepared (e.g., skills and knowledge) to help Albania solve its most complicated development challenges?","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB3. To what extent do you believe the World Bank Group\u2019s staff is well prepared (e.g., skills and knowledge) to help Albania solve its most complicated development challenges?","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"265","type":"vald"},{"value":"67","type":"invd"},{"value":"3","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"0","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"4","type":"freq"},{"value":"5","labl":null,"stats":"24","type":"freq"},{"value":"6","labl":null,"stats":"12","type":"freq"},{"value":"7","labl":null,"stats":"38","type":"freq"},{"value":"8","labl":null,"stats":"52","type":"freq"},{"value":"9","labl":null,"stats":"70","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"59","type":"freq"},{"value":"-99","labl":null,"stats":"4","type":"freq"},{"value":"11","labl":"Don't know","stats":"52","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V78","name":"b4_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"232","var_end_pos":"234","var_width":"3","var_rec_seg_no":"1","labl":"Energy","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n1 Energy","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"298","type":"freq"},{"value":"1","labl":null,"stats":"24","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V79","name":"b4_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"235","var_end_pos":"237","var_width":"3","var_rec_seg_no":"1","labl":"Water and sanitation","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n2 Water and sanitation","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"307","type":"freq"},{"value":"1","labl":null,"stats":"15","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V80","name":"b4_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"238","var_end_pos":"240","var_width":"3","var_rec_seg_no":"1","labl":"Pollution","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n3 Pollution","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"316","type":"freq"},{"value":"1","labl":null,"stats":"6","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V81","name":"b4_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"241","var_end_pos":"243","var_width":"3","var_rec_seg_no":"1","labl":"Job creation\/employment","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n4 Job creation\/employment","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"249","type":"freq"},{"value":"1","labl":null,"stats":"73","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V82","name":"b4_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"244","var_end_pos":"246","var_width":"3","var_rec_seg_no":"1","labl":"Health","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n5 Health","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"276","type":"freq"},{"value":"1","labl":null,"stats":"46","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V83","name":"b4_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"247","var_end_pos":"249","var_width":"3","var_rec_seg_no":"1","labl":"Financial markets","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n6 Financial markets","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"310","type":"freq"},{"value":"1","labl":null,"stats":"12","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V84","name":"b4_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"250","var_end_pos":"252","var_width":"3","var_rec_seg_no":"1","labl":"Social protection","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n7 Social protection (e.g., pensions, targeted social assistance)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"297","type":"freq"},{"value":"1","labl":null,"stats":"25","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V85","name":"b4_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"253","var_end_pos":"255","var_width":"3","var_rec_seg_no":"1","labl":"Gender equity","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n8 Gender equity","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"315","type":"freq"},{"value":"1","labl":null,"stats":"7","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V86","name":"b4_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"256","var_end_pos":"258","var_width":"3","var_rec_seg_no":"1","labl":"Private sector development","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n9 Private sector development","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"259","type":"freq"},{"value":"1","labl":null,"stats":"63","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V87","name":"b4_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"259","var_end_pos":"261","var_width":"3","var_rec_seg_no":"1","labl":"Education","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n10 Education","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"247","type":"freq"},{"value":"1","labl":null,"stats":"75","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V88","name":"b4_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"262","var_end_pos":"264","var_width":"3","var_rec_seg_no":"1","labl":"Public sector governance\/reform","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n11 Public sector governance\/reform (i.e., government effectiveness, public financial management, public expenditure, fiscal system reform)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"250","type":"freq"},{"value":"1","labl":null,"stats":"72","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V89","name":"b4_12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"265","var_end_pos":"267","var_width":"3","var_rec_seg_no":"1","labl":"Global\/regional integration","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n12 Global\/regional integration","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"302","type":"freq"},{"value":"1","labl":null,"stats":"20","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V90","name":"b4_13","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"268","var_end_pos":"270","var_width":"3","var_rec_seg_no":"1","labl":"Foreign direct investment","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n13 Foreign direct investment","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"259","type":"freq"},{"value":"1","labl":null,"stats":"63","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V91","name":"b4_14","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"271","var_end_pos":"273","var_width":"3","var_rec_seg_no":"1","labl":"Urban development","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n14 Urban development","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"302","type":"freq"},{"value":"1","labl":null,"stats":"20","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V92","name":"b4_15","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"274","var_end_pos":"276","var_width":"3","var_rec_seg_no":"1","labl":"Judiciary reform","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n15 Judiciary reform","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"290","type":"freq"},{"value":"1","labl":null,"stats":"32","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V93","name":"b4_16","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"277","var_end_pos":"279","var_width":"3","var_rec_seg_no":"1","labl":"Economic growth","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n16 Economic growth","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"252","type":"freq"},{"value":"1","labl":null,"stats":"70","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V94","name":"b4_17","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"280","var_end_pos":"282","var_width":"3","var_rec_seg_no":"1","labl":"Disaster risk management","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n17 Disaster risk management","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"317","type":"freq"},{"value":"1","labl":null,"stats":"5","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V95","name":"b4_18","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"283","var_end_pos":"285","var_width":"3","var_rec_seg_no":"1","labl":"Equality of opportunity","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n18 Equality of opportunity (i.e., social inclusion)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"296","type":"freq"},{"value":"1","labl":null,"stats":"26","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V96","name":"b4_19","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"286","var_end_pos":"288","var_width":"3","var_rec_seg_no":"1","labl":"Environmental sustainability","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n19 Environmental sustainability","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"308","type":"freq"},{"value":"1","labl":null,"stats":"14","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V97","name":"b4_20","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"289","var_end_pos":"291","var_width":"3","var_rec_seg_no":"1","labl":"Information and communications technology","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n20 Information and communications technology","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"314","type":"freq"},{"value":"1","labl":null,"stats":"8","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V98","name":"b4_21","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"292","var_end_pos":"294","var_width":"3","var_rec_seg_no":"1","labl":"Transport","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n21 Transport (e.g., roads, bridges, transportation)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"299","type":"freq"},{"value":"1","labl":null,"stats":"23","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V99","name":"b4_22","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"295","var_end_pos":"297","var_width":"3","var_rec_seg_no":"1","labl":"Agriculture and rural development","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n22 Agriculture and rural development","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"239","type":"freq"},{"value":"1","labl":null,"stats":"83","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V100","name":"b4_23","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"298","var_end_pos":"300","var_width":"3","var_rec_seg_no":"1","labl":"Trade and exports","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n23 Trade and exports","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"313","type":"freq"},{"value":"1","labl":null,"stats":"9","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V101","name":"b4_24","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"301","var_end_pos":"303","var_width":"3","var_rec_seg_no":"1","labl":"Crime and violence","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n24 Crime and violence","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"320","type":"freq"},{"value":"1","labl":null,"stats":"2","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V102","name":"b4_25","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"304","var_end_pos":"306","var_width":"3","var_rec_seg_no":"1","labl":"Natural resource management","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n25 Natural resource management (renewable)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"288","type":"freq"},{"value":"1","labl":null,"stats":"34","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V103","name":"b4_26","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"307","var_end_pos":"309","var_width":"3","var_rec_seg_no":"1","labl":"Climate change","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n26 Climate change (e.g., mitigation, adaptation)","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"319","type":"freq"},{"value":"1","labl":null,"stats":"3","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V104","name":"b4_27","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"310","var_end_pos":"312","var_width":"3","var_rec_seg_no":"1","labl":"Poverty reduction","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n27 Poverty reduction","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"261","type":"freq"},{"value":"1","labl":null,"stats":"61","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V105","name":"b4_28","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"313","var_end_pos":"315","var_width":"3","var_rec_seg_no":"1","labl":"Anti-corruption","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB4. When thinking about how the World Bank Group can have the most impact on development\nresults in Albania, in which sectors do you believe the World Bank Group should focus most of its\nresources (financial and knowledge services) in Albania?\n\n28 Anti corruption","var_qstn_ivulnstr":"Choose no more than THREE","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"322","type":"vald"},{"value":"10","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"274","type":"freq"},{"value":"1","labl":null,"stats":"48","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"8","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V106","name":"b5a_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"316","var_end_pos":"318","var_width":"3","var_rec_seg_no":"1","labl":"Bringing together different groups of stakeholders","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n1 Bringing together different groups of stakeholders","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"278","type":"freq"},{"value":"1","labl":null,"stats":"40","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V107","name":"b5a_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"319","var_end_pos":"321","var_width":"3","var_rec_seg_no":"1","labl":"Capacity development related to World Bank Group supported projects","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n2 Capacity development related to World Bank Group supported projects","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"261","type":"freq"},{"value":"1","labl":null,"stats":"57","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V108","name":"b5a_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"322","var_end_pos":"324","var_width":"3","var_rec_seg_no":"1","labl":"Technical assistance","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n3 Technical assistance","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"290","type":"freq"},{"value":"1","labl":null,"stats":"28","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V109","name":"b5a_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"325","var_end_pos":"327","var_width":"3","var_rec_seg_no":"1","labl":"Policy advice, studies, analyses","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n4 Policy advice, studies, analyses","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"282","type":"freq"},{"value":"1","labl":null,"stats":"36","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V110","name":"b5a_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"328","var_end_pos":"330","var_width":"3","var_rec_seg_no":"1","labl":"Financial resources","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n5 Financial resources","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"247","type":"freq"},{"value":"1","labl":null,"stats":"71","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V111","name":"b5a_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"331","var_end_pos":"333","var_width":"3","var_rec_seg_no":"1","labl":"Data and statistics","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n6 Data and statistics","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"308","type":"freq"},{"value":"1","labl":null,"stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V112","name":"b5a_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"334","var_end_pos":"336","var_width":"3","var_rec_seg_no":"1","labl":"Promoting knowledge sharing","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n7 Promoting knowledge sharing","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"310","type":"freq"},{"value":"1","labl":null,"stats":"8","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V113","name":"b5a_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"337","var_end_pos":"339","var_width":"3","var_rec_seg_no":"1","labl":"Implementation support","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n8 Implementation support","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"270","type":"freq"},{"value":"1","labl":null,"stats":"48","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V114","name":"b5a_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"340","var_end_pos":"342","var_width":"3","var_rec_seg_no":"1","labl":"Mobilizing third party financial resources","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n9 Mobilizing third party financial resources","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"309","type":"freq"},{"value":"1","labl":null,"stats":"9","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V115","name":"b5a_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"343","var_end_pos":"345","var_width":"3","var_rec_seg_no":"1","labl":"Donor coordination","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n10 Donor coordination","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"309","type":"freq"},{"value":"1","labl":null,"stats":"9","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V116","name":"b5a_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"346","var_end_pos":"348","var_width":"3","var_rec_seg_no":"1","labl":"Other","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n11 Other (please specify):","var_qstn_ivulnstr":"Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"316","type":"freq"},{"value":"1","labl":null,"stats":"2","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V117","name":"b5b_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"349","var_end_pos":"351","var_width":"3","var_rec_seg_no":"1","labl":"Bringing together different groups of stakeholders","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n1 Bringing together different groups of stakeholders","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"288","type":"freq"},{"value":"1","labl":null,"stats":"25","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V118","name":"b5b_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"352","var_end_pos":"354","var_width":"3","var_rec_seg_no":"1","labl":"Capacity development related to World Bank Group supported projects","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n2 Capacity development related to World Bank Group supported projects","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"279","type":"freq"},{"value":"1","labl":null,"stats":"34","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V119","name":"b5b_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"355","var_end_pos":"357","var_width":"3","var_rec_seg_no":"1","labl":"Technical assistance","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n3 Technical assistance","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"276","type":"freq"},{"value":"1","labl":null,"stats":"37","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V120","name":"b5b_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"358","var_end_pos":"360","var_width":"3","var_rec_seg_no":"1","labl":"Policy advice, studies, analyses","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n4 Policy advice, studies, analyses","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"274","type":"freq"},{"value":"1","labl":null,"stats":"39","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V121","name":"b5b_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"361","var_end_pos":"363","var_width":"3","var_rec_seg_no":"1","labl":"Financial resources","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n5 Financial resources","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"261","type":"freq"},{"value":"1","labl":null,"stats":"52","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V122","name":"b5b_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"364","var_end_pos":"366","var_width":"3","var_rec_seg_no":"1","labl":"Data and statistics","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n6 Data and statistics","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"308","type":"freq"},{"value":"1","labl":null,"stats":"5","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V123","name":"b5b_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"367","var_end_pos":"369","var_width":"3","var_rec_seg_no":"1","labl":"Promoting knowledge sharing","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n7 Promoting knowledge sharing","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"296","type":"freq"},{"value":"1","labl":null,"stats":"17","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V124","name":"b5b_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"370","var_end_pos":"372","var_width":"3","var_rec_seg_no":"1","labl":"Implementation support","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n8 Implementation support","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"259","type":"freq"},{"value":"1","labl":null,"stats":"54","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V125","name":"b5b_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"373","var_end_pos":"375","var_width":"3","var_rec_seg_no":"1","labl":"Mobilizing third party financial resources","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n9 Mobilizing third party financial resources","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"286","type":"freq"},{"value":"1","labl":null,"stats":"27","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V126","name":"b5b_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"376","var_end_pos":"378","var_width":"3","var_rec_seg_no":"1","labl":"Donor coordination","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n10 Donor coordination","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"294","type":"freq"},{"value":"1","labl":null,"stats":"19","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V127","name":"b5b_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"379","var_end_pos":"381","var_width":"3","var_rec_seg_no":"1","labl":"Other","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB5. When thinking about the World Bank Group\u2019s role, which activity do you believe is of greatest VALUE and which activity is of second greatest value in Albania?\n\n11 Other (please specify):","var_qstn_ivulnstr":"Second Greatest Value (Choose only ONE)","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"309","type":"freq"},{"value":"1","labl":null,"stats":"4","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"12","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V128","name":"b6_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"382","var_end_pos":"384","var_width":"3","var_rec_seg_no":"1","labl":"World Bank Group's processes too slow (e.g., too bureaucratic in its operational policies and procedures)","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n1 World Bank Group\u2019s processes too slow (e.g., too bureaucratic in its operational policies and procedures)","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"248","type":"freq"},{"value":"1","labl":null,"stats":"68","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V129","name":"b6_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"385","var_end_pos":"387","var_width":"3","var_rec_seg_no":"1","labl":"Not aligned with other donors' work","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n2 Not aligned with other donors\u2019 work","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"303","type":"freq"},{"value":"1","labl":null,"stats":"13","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V130","name":"b6_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"388","var_end_pos":"390","var_width":"3","var_rec_seg_no":"1","labl":"Not aligned with country priorities","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n3 Not aligned with country priorities","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"301","type":"freq"},{"value":"1","labl":null,"stats":"15","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V131","name":"b6_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"391","var_end_pos":"393","var_width":"3","var_rec_seg_no":"1","labl":"World Bank Group's processes too complex","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n4 World Bank Group\u2019s processes too complex","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"271","type":"freq"},{"value":"1","labl":null,"stats":"45","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V132","name":"b6_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"394","var_end_pos":"396","var_width":"3","var_rec_seg_no":"1","labl":"Not willing to honestly criticize policies and reform efforts in the country","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n5 Not willing to honestly criticize policies and reform efforts in the country","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"271","type":"freq"},{"value":"1","labl":null,"stats":"45","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V133","name":"b6_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"397","var_end_pos":"399","var_width":"3","var_rec_seg_no":"1","labl":"Staff too inaccessible","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n6 Staff too inaccessible","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"310","type":"freq"},{"value":"1","labl":null,"stats":"6","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V134","name":"b6_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"400","var_end_pos":"402","var_width":"3","var_rec_seg_no":"1","labl":"Not adequately sensitive to political\/social realities in Albania","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n7 Not adequately sensitive to political\/social realities in Albania","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"283","type":"freq"},{"value":"1","labl":null,"stats":"33","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V135","name":"b6_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"403","var_end_pos":"405","var_width":"3","var_rec_seg_no":"1","labl":"Too influenced by developed countries","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n8 Too influenced by developed countries","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"289","type":"freq"},{"value":"1","labl":null,"stats":"27","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V136","name":"b6_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"406","var_end_pos":"408","var_width":"3","var_rec_seg_no":"1","labl":"Not exploring alternative policy options","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n9 Not exploring alternative policy options","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"303","type":"freq"},{"value":"1","labl":null,"stats":"13","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V137","name":"b6_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"409","var_end_pos":"411","var_width":"3","var_rec_seg_no":"1","labl":"Not collaborating enough with stakeholders outside the Government","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n10 Not collaborating enough with stakeholders outside the Government","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"254","type":"freq"},{"value":"1","labl":null,"stats":"62","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V138","name":"b6_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"412","var_end_pos":"414","var_width":"3","var_rec_seg_no":"1","labl":"Its advice and strategies do not lend themselves to practical problem solving","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n11 Its advice and strategies do not lend themselves to practical problem solving","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"290","type":"freq"},{"value":"1","labl":null,"stats":"26","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V139","name":"b6_12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"415","var_end_pos":"417","var_width":"3","var_rec_seg_no":"1","labl":"Not enough public disclosure of its work","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n12 Not enough public disclosure of its work","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"236","type":"freq"},{"value":"1","labl":null,"stats":"80","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V140","name":"b6_13","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"418","var_end_pos":"420","var_width":"3","var_rec_seg_no":"1","labl":"Arrogant in its approach","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n13 Arrogant in its approach","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"0"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"0","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"316","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V141","name":"b6_14","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"421","var_end_pos":"423","var_width":"3","var_rec_seg_no":"1","labl":"Not client focused","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n14 Not client focused","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"312","type":"freq"},{"value":"1","labl":null,"stats":"4","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V142","name":"b6_15","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"424","var_end_pos":"426","var_width":"3","var_rec_seg_no":"1","labl":"The credibility of its knowledge\/data","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n15 The credibility of its knowledge\/data","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"314","type":"freq"},{"value":"1","labl":null,"stats":"2","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V143","name":"b6_16","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"427","var_end_pos":"429","var_width":"3","var_rec_seg_no":"1","labl":"Other","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n16 Other (please specify):","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"311","type":"freq"},{"value":"1","labl":null,"stats":"5","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V144","name":"b6_17","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"430","var_end_pos":"432","var_width":"3","var_rec_seg_no":"1","labl":"Don't know","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB6. Which of the following do you identify as the World Bank Group\u2019s greatest WEAKNESSES in its\nwork in Albania?\n\n17 Don\u2019t know","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"316","type":"vald"},{"value":"16","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"261","type":"freq"},{"value":"1","labl":null,"stats":"55","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"10","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V145","name":"b7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"433","var_end_pos":"435","var_width":"3","var_rec_seg_no":"1","labl":"To what extent do you believe that the World Bank Group's work and support help the poorest in Albania?","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB7. To what extent do you believe that the World Bank Group\u2019s work and support help the poorest in\nAlbania?","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"5"}],"var_sumstat":[{"value":"313","type":"vald"},{"value":"19","type":"invd"},{"value":"1","type":"min"},{"value":"5","type":"max"}],"var_catgry":[{"value":"1","labl":"To a fully sufficient degree","stats":"14","type":"freq"},{"value":"2","labl":"To a somewhat sufficient degree","stats":"134","type":"freq"},{"value":"3","labl":"To a somewhat insufficient degree","stats":"98","type":"freq"},{"value":"4","labl":"To a very insufficient degree","stats":"19","type":"freq"},{"value":"5","labl":"Don't know","stats":"48","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V146","name":"b8_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"436","var_end_pos":"438","var_width":"3","var_rec_seg_no":"1","labl":"Investment Project Financing (IPF)","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB8. How EFFECTIVE do you believe the following World Bank Group\u2019s instruments are in supporting the\nAlbania Government\u2019s efforts to reduce poverty?\n\n1 Investment Project Financing (IPF)","var_qstn_ivulnstr":"If you have NO exposure to\/experience with the instruments listed below, please select \u201cN\/A\u201d","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"177","type":"vald"},{"value":"155","type":"invd"},{"value":"2","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"0","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"1","type":"freq"},{"value":"4","labl":null,"stats":"10","type":"freq"},{"value":"5","labl":null,"stats":"15","type":"freq"},{"value":"6","labl":null,"stats":"18","type":"freq"},{"value":"7","labl":null,"stats":"30","type":"freq"},{"value":"8","labl":null,"stats":"45","type":"freq"},{"value":"9","labl":null,"stats":"34","type":"freq"},{"value":"10","labl":"Very effective","stats":"21","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"11","labl":"N\/A","stats":"119","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"25","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V147","name":"b8_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"439","var_end_pos":"441","var_width":"3","var_rec_seg_no":"1","labl":"Development Policy Financing (DPF)","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB8. How EFFECTIVE do you believe the following World Bank Group\u2019s instruments are in supporting the\nAlbania Government\u2019s efforts to reduce poverty?\n\n2 Development Policy Financing (DPF)","var_qstn_ivulnstr":"If you have NO exposure to\/experience with the instruments listed below, please select \u201cN\/A\u201d","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"168","type":"vald"},{"value":"164","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"5","type":"freq"},{"value":"5","labl":null,"stats":"19","type":"freq"},{"value":"6","labl":null,"stats":"21","type":"freq"},{"value":"7","labl":null,"stats":"25","type":"freq"},{"value":"8","labl":null,"stats":"41","type":"freq"},{"value":"9","labl":null,"stats":"28","type":"freq"},{"value":"10","labl":"Very effective","stats":"19","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"N\/A","stats":"117","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"25","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V148","name":"b8_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"442","var_end_pos":"444","var_width":"3","var_rec_seg_no":"1","labl":"Program-for-Results Financing (PforR)","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB8. How EFFECTIVE do you believe the following World Bank Group\u2019s instruments are in supporting the\nAlbania Government\u2019s efforts to reduce poverty?\n \n3 Program-for-Results Financing (PforR)","var_qstn_ivulnstr":"If you have NO exposure to\/experience with the instruments listed below, please select \"N\/A\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"140","type":"vald"},{"value":"192","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"5","type":"freq"},{"value":"5","labl":null,"stats":"18","type":"freq"},{"value":"6","labl":null,"stats":"18","type":"freq"},{"value":"7","labl":null,"stats":"20","type":"freq"},{"value":"8","labl":null,"stats":"32","type":"freq"},{"value":"9","labl":null,"stats":"23","type":"freq"},{"value":"10","labl":"Very effective","stats":"18","type":"freq"},{"value":"-99","labl":null,"stats":"21","type":"freq"},{"value":"11","labl":"N\/A","stats":"142","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"29","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V149","name":"b8_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"445","var_end_pos":"447","var_width":"3","var_rec_seg_no":"1","labl":"Trust funds and grants","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB8. How EFFECTIVE do you believe the following World Bank Group\u2019s instruments are in supporting the\nAlbania Government\u2019s efforts to reduce poverty?\n\n4 Trust funds and grants","var_qstn_ivulnstr":"If you have NO exposure to\/experience with the instruments listed below, please select \"N\/A\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"148","type":"vald"},{"value":"184","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"25","type":"freq"},{"value":"6","labl":null,"stats":"20","type":"freq"},{"value":"7","labl":null,"stats":"23","type":"freq"},{"value":"8","labl":null,"stats":"22","type":"freq"},{"value":"9","labl":null,"stats":"26","type":"freq"},{"value":"10","labl":"Very effective","stats":"20","type":"freq"},{"value":"-99","labl":null,"stats":"23","type":"freq"},{"value":"11","labl":"N\/A","stats":"135","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"26","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V150","name":"b8_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"448","var_end_pos":"450","var_width":"3","var_rec_seg_no":"1","labl":"Guarantees","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB8. How EFFECTIVE do you believe the following World Bank Group\u2019s instruments are in supporting the\nAlbania Government\u2019s efforts to reduce poverty?\n\n5 Guarantees","var_qstn_ivulnstr":"If you have NO exposure to\/experience with the instruments listed below, please select \"N\/A\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"100","type":"vald"},{"value":"232","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"1","type":"freq"},{"value":"4","labl":null,"stats":"6","type":"freq"},{"value":"5","labl":null,"stats":"18","type":"freq"},{"value":"6","labl":null,"stats":"12","type":"freq"},{"value":"7","labl":null,"stats":"13","type":"freq"},{"value":"8","labl":null,"stats":"21","type":"freq"},{"value":"9","labl":null,"stats":"17","type":"freq"},{"value":"10","labl":"Very effective","stats":"7","type":"freq"},{"value":"-99","labl":null,"stats":"27","type":"freq"},{"value":"11","labl":"N\/A","stats":"176","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"29","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V151","name":"b8_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"451","var_end_pos":"453","var_width":"3","var_rec_seg_no":"1","labl":"IFC Investment Services","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB8. How EFFECTIVE do you believe the following World Bank Group\u2019s instruments are in supporting the\nAlbania Government\u2019s efforts to reduce poverty?\n\n6 IFC Investment Services","var_qstn_ivulnstr":"If you have NO exposure to\/experience with the instruments listed below, please select \"N\/A\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"114","type":"vald"},{"value":"218","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"11","type":"freq"},{"value":"6","labl":null,"stats":"9","type":"freq"},{"value":"7","labl":null,"stats":"14","type":"freq"},{"value":"8","labl":null,"stats":"29","type":"freq"},{"value":"9","labl":null,"stats":"25","type":"freq"},{"value":"10","labl":"Very effective","stats":"11","type":"freq"},{"value":"-99","labl":null,"stats":"24","type":"freq"},{"value":"11","labl":"N\/A","stats":"166","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"28","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V152","name":"b8_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"454","var_end_pos":"456","var_width":"3","var_rec_seg_no":"1","labl":"IFC Advisory Services","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB8. How EFFECTIVE do you believe the following World Bank Group\u2019s instruments are in supporting the\nAlbania Government\u2019s efforts to reduce poverty?\n\n7 IFC Advisory Services","var_qstn_ivulnstr":"If you have NO exposure to\/experience with the instruments listed below, please select \"N\/A\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"131","type":"vald"},{"value":"201","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"2","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"11","type":"freq"},{"value":"6","labl":null,"stats":"11","type":"freq"},{"value":"7","labl":null,"stats":"18","type":"freq"},{"value":"8","labl":null,"stats":"28","type":"freq"},{"value":"9","labl":null,"stats":"32","type":"freq"},{"value":"10","labl":"Very effective","stats":"16","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"N\/A","stats":"152","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V153","name":"b9_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"457","var_end_pos":"459","var_width":"3","var_rec_seg_no":"1","labl":"Beneficiaries","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n1 Beneficiaries","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"248","type":"freq"},{"value":"1","labl":null,"stats":"66","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V154","name":"b9_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"460","var_end_pos":"462","var_width":"3","var_rec_seg_no":"1","labl":"Youth\/university groups","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n2 Youth\/university groups","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"247","type":"freq"},{"value":"1","labl":null,"stats":"67","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V155","name":"b9_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"463","var_end_pos":"465","var_width":"3","var_rec_seg_no":"1","labl":"Private sector","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n3 Private sector","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"188","type":"freq"},{"value":"1","labl":null,"stats":"126","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V156","name":"b9_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"466","var_end_pos":"468","var_width":"3","var_rec_seg_no":"1","labl":"Local government","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n4 Local government","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"199","type":"freq"},{"value":"1","labl":null,"stats":"115","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V157","name":"b9_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"469","var_end_pos":"471","var_width":"3","var_rec_seg_no":"1","labl":"Donor community","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n5 Donor community","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"281","type":"freq"},{"value":"1","labl":null,"stats":"33","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V158","name":"b9_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"472","var_end_pos":"474","var_width":"3","var_rec_seg_no":"1","labl":"NGOs\/Community Based Organizations","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n6 NGOs\/Community Based Organizations","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"262","type":"freq"},{"value":"1","labl":null,"stats":"52","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V159","name":"b9_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"475","var_end_pos":"477","var_width":"3","var_rec_seg_no":"1","labl":"Academia\/think tanks\/research institutes","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n7 Academia\/think tanks\/research institutes","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"227","type":"freq"},{"value":"1","labl":null,"stats":"87","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V160","name":"b9_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"478","var_end_pos":"480","var_width":"3","var_rec_seg_no":"1","labl":"Parliament","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n8 Parliament","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"298","type":"freq"},{"value":"1","labl":null,"stats":"16","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V161","name":"b9_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"481","var_end_pos":"483","var_width":"3","var_rec_seg_no":"1","labl":"Foundations","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n9 Foundations","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"304","type":"freq"},{"value":"1","labl":null,"stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V162","name":"b9_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"484","var_end_pos":"486","var_width":"3","var_rec_seg_no":"1","labl":"Media","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n10 Media","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"299","type":"freq"},{"value":"1","labl":null,"stats":"15","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V163","name":"b9_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"487","var_end_pos":"489","var_width":"3","var_rec_seg_no":"1","labl":"Other","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n11 Other (please specify):","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"313","type":"freq"},{"value":"1","labl":null,"stats":"1","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V164","name":"b9_12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"490","var_end_pos":"492","var_width":"3","var_rec_seg_no":"1","labl":"Don't know","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB9. In addition to the regular relations with the national government, which TWO of the following\ngroups should the World Bank Group collaborate with more in your country?\n\n12 Don\u2019t know","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"314","type":"vald"},{"value":"18","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"308","type":"freq"},{"value":"1","labl":null,"stats":"6","type":"freq"},{"value":"-99","labl":null,"stats":"1","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"17","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V165","name":"b10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"493","var_end_pos":"495","var_width":"3","var_rec_seg_no":"1","labl":"Overall the World Bank Group currently plays a relevant role in development in Albania","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent do you agree with the following statements about the World Bank Group\u2019s work in\nAlbania?\n\nB10 Overall the World Bank Group currently plays a relevant role in development in Albania","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"294","type":"vald"},{"value":"38","type":"invd"},{"value":"2","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"0","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"11","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"21","type":"freq"},{"value":"6","labl":null,"stats":"30","type":"freq"},{"value":"7","labl":null,"stats":"39","type":"freq"},{"value":"8","labl":null,"stats":"74","type":"freq"},{"value":"9","labl":null,"stats":"59","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"50","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"11","labl":"Don't know","stats":"17","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"18","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V166","name":"b11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"496","var_end_pos":"498","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group's work is aligned with what I consider the development priorities for Albania","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent do you agree with the following statements about the World Bank Group\u2019s work in\nAlbania?\n\nB11 The World Bank Group\u2019s work is aligned with what I consider the development priorities for Albania","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"284","type":"vald"},{"value":"48","type":"invd"},{"value":"2","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"0","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"10","type":"freq"},{"value":"4","labl":null,"stats":"10","type":"freq"},{"value":"5","labl":null,"stats":"23","type":"freq"},{"value":"6","labl":null,"stats":"29","type":"freq"},{"value":"7","labl":null,"stats":"45","type":"freq"},{"value":"8","labl":null,"stats":"80","type":"freq"},{"value":"9","labl":null,"stats":"55","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"28","type":"freq"},{"value":"-99","labl":null,"stats":"10","type":"freq"},{"value":"11","labl":"Don't know","stats":"20","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"18","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V167","name":"b12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"499","var_end_pos":"501","var_width":"3","var_rec_seg_no":"1","labl":"Responsiveness to needs","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB12 Responsiveness to needs","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"266","type":"vald"},{"value":"66","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"9","type":"freq"},{"value":"4","labl":null,"stats":"14","type":"freq"},{"value":"5","labl":null,"stats":"28","type":"freq"},{"value":"6","labl":null,"stats":"47","type":"freq"},{"value":"7","labl":null,"stats":"40","type":"freq"},{"value":"8","labl":null,"stats":"70","type":"freq"},{"value":"9","labl":null,"stats":"36","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"17","type":"freq"},{"value":"-99","labl":null,"stats":"17","type":"freq"},{"value":"11","labl":"Don't know","stats":"27","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"22","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V168","name":"b13","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"502","var_end_pos":"504","var_width":"3","var_rec_seg_no":"1","labl":"Flexibility (in terms of the institution's products and services)","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB13 Flexibility (in terms of the institution\u2019s products and services)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"253","type":"vald"},{"value":"79","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"9","type":"freq"},{"value":"4","labl":null,"stats":"28","type":"freq"},{"value":"5","labl":null,"stats":"33","type":"freq"},{"value":"6","labl":null,"stats":"31","type":"freq"},{"value":"7","labl":null,"stats":"45","type":"freq"},{"value":"8","labl":null,"stats":"60","type":"freq"},{"value":"9","labl":null,"stats":"32","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"11","type":"freq"},{"value":"-99","labl":null,"stats":"17","type":"freq"},{"value":"11","labl":"Don't know","stats":"40","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"22","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V169","name":"b14","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"505","var_end_pos":"507","var_width":"3","var_rec_seg_no":"1","labl":"Flexibility (in terms of changing country circumstances)","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB14 Flexibility (in terms of changing country circumstances","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"256","type":"vald"},{"value":"76","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"8","type":"freq"},{"value":"4","labl":null,"stats":"21","type":"freq"},{"value":"5","labl":null,"stats":"37","type":"freq"},{"value":"6","labl":null,"stats":"29","type":"freq"},{"value":"7","labl":null,"stats":"43","type":"freq"},{"value":"8","labl":null,"stats":"60","type":"freq"},{"value":"9","labl":null,"stats":"36","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"17","type":"freq"},{"value":"-99","labl":null,"stats":"17","type":"freq"},{"value":"11","labl":"Don't know","stats":"36","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V170","name":"b15","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"508","var_end_pos":"510","var_width":"3","var_rec_seg_no":"1","labl":"Being inclusive","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB15 Being inclusive","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"255","type":"vald"},{"value":"77","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"8","type":"freq"},{"value":"4","labl":null,"stats":"13","type":"freq"},{"value":"5","labl":null,"stats":"43","type":"freq"},{"value":"6","labl":null,"stats":"27","type":"freq"},{"value":"7","labl":null,"stats":"39","type":"freq"},{"value":"8","labl":null,"stats":"50","type":"freq"},{"value":"9","labl":null,"stats":"45","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"24","type":"freq"},{"value":"-99","labl":null,"stats":"14","type":"freq"},{"value":"11","labl":"Don't know","stats":"41","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"22","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V171","name":"b16","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"511","var_end_pos":"513","var_width":"3","var_rec_seg_no":"1","labl":"Openness (sharing data and other information)","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB16 Openness (sharing data and other information)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"261","type":"vald"},{"value":"71","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"11","type":"freq"},{"value":"5","labl":null,"stats":"27","type":"freq"},{"value":"6","labl":null,"stats":"27","type":"freq"},{"value":"7","labl":null,"stats":"36","type":"freq"},{"value":"8","labl":null,"stats":"48","type":"freq"},{"value":"9","labl":null,"stats":"57","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"43","type":"freq"},{"value":"-99","labl":null,"stats":"17","type":"freq"},{"value":"11","labl":"Don't know","stats":"30","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"24","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V172","name":"b17","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"514","var_end_pos":"516","var_width":"3","var_rec_seg_no":"1","labl":"Collaboration with the Government","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB17 Collaboration with the Government","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"276","type":"vald"},{"value":"56","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"4","type":"freq"},{"value":"5","labl":null,"stats":"23","type":"freq"},{"value":"6","labl":null,"stats":"15","type":"freq"},{"value":"7","labl":null,"stats":"21","type":"freq"},{"value":"8","labl":null,"stats":"67","type":"freq"},{"value":"9","labl":null,"stats":"85","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"53","type":"freq"},{"value":"-99","labl":null,"stats":"13","type":"freq"},{"value":"11","labl":"Don't know","stats":"21","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"22","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V173","name":"b18","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"517","var_end_pos":"519","var_width":"3","var_rec_seg_no":"1","labl":"The speed in which it gets things accomplished on the ground","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB18 The speed in which it gets things accomplished on the ground","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"246","type":"vald"},{"value":"86","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"9","type":"freq"},{"value":"4","labl":null,"stats":"22","type":"freq"},{"value":"5","labl":null,"stats":"40","type":"freq"},{"value":"6","labl":null,"stats":"27","type":"freq"},{"value":"7","labl":null,"stats":"41","type":"freq"},{"value":"8","labl":null,"stats":"43","type":"freq"},{"value":"9","labl":null,"stats":"44","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"14","type":"freq"},{"value":"-99","labl":null,"stats":"18","type":"freq"},{"value":"11","labl":"Don't know","stats":"45","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V174","name":"b19","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"520","var_end_pos":"522","var_width":"3","var_rec_seg_no":"1","labl":"Helping to bring discipline\/effective supervision to implementation of investment projects","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB19 Helping to bring discipline\/effective supervision to implementation of investment projects","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"261","type":"vald"},{"value":"71","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"12","type":"freq"},{"value":"4","labl":null,"stats":"13","type":"freq"},{"value":"5","labl":null,"stats":"28","type":"freq"},{"value":"6","labl":null,"stats":"19","type":"freq"},{"value":"7","labl":null,"stats":"40","type":"freq"},{"value":"8","labl":null,"stats":"53","type":"freq"},{"value":"9","labl":null,"stats":"60","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"35","type":"freq"},{"value":"-99","labl":null,"stats":"14","type":"freq"},{"value":"11","labl":"Don't know","stats":"35","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"22","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V175","name":"b20","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"523","var_end_pos":"525","var_width":"3","var_rec_seg_no":"1","labl":"Collaboration with civil society","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB20 Collaboration with civil society","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"236","type":"vald"},{"value":"96","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"15","type":"freq"},{"value":"4","labl":null,"stats":"15","type":"freq"},{"value":"5","labl":null,"stats":"42","type":"freq"},{"value":"6","labl":null,"stats":"31","type":"freq"},{"value":"7","labl":null,"stats":"28","type":"freq"},{"value":"8","labl":null,"stats":"48","type":"freq"},{"value":"9","labl":null,"stats":"38","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"12","type":"freq"},{"value":"-99","labl":null,"stats":"17","type":"freq"},{"value":"11","labl":"Don't know","stats":"57","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"22","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V176","name":"b21","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"526","var_end_pos":"528","var_width":"3","var_rec_seg_no":"1","labl":"Staff accessibility","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB21 Staff accessibility","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"222","type":"vald"},{"value":"110","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"11","type":"freq"},{"value":"4","labl":null,"stats":"10","type":"freq"},{"value":"5","labl":null,"stats":"22","type":"freq"},{"value":"6","labl":null,"stats":"27","type":"freq"},{"value":"7","labl":null,"stats":"26","type":"freq"},{"value":"8","labl":null,"stats":"41","type":"freq"},{"value":"9","labl":null,"stats":"54","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"28","type":"freq"},{"value":"-99","labl":null,"stats":"20","type":"freq"},{"value":"11","labl":"Don't know","stats":"64","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"26","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V177","name":"b22","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"529","var_end_pos":"531","var_width":"3","var_rec_seg_no":"1","labl":"Collaboration with other donors and development partners","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB22 Collaboration with other donors and development partners","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"206","type":"vald"},{"value":"126","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"11","type":"freq"},{"value":"4","labl":null,"stats":"15","type":"freq"},{"value":"5","labl":null,"stats":"30","type":"freq"},{"value":"6","labl":null,"stats":"34","type":"freq"},{"value":"7","labl":null,"stats":"30","type":"freq"},{"value":"8","labl":null,"stats":"45","type":"freq"},{"value":"9","labl":null,"stats":"28","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"7","type":"freq"},{"value":"-99","labl":null,"stats":"19","type":"freq"},{"value":"11","labl":"Don't know","stats":"84","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V178","name":"b23","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"532","var_end_pos":"534","var_width":"3","var_rec_seg_no":"1","labl":"Collaboration with the private sector","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB23 Collaboration with the private sector","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"234","type":"vald"},{"value":"98","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"12","type":"freq"},{"value":"5","labl":null,"stats":"30","type":"freq"},{"value":"6","labl":null,"stats":"19","type":"freq"},{"value":"7","labl":null,"stats":"35","type":"freq"},{"value":"8","labl":null,"stats":"56","type":"freq"},{"value":"9","labl":null,"stats":"44","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"32","type":"freq"},{"value":"-99","labl":null,"stats":"14","type":"freq"},{"value":"11","labl":"Don't know","stats":"62","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"22","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V179","name":"b24","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"535","var_end_pos":"537","var_width":"3","var_rec_seg_no":"1","labl":"Straightforwardness and honesty","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB24 Straightforwardness and honesty","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"251","type":"vald"},{"value":"81","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"28","type":"freq"},{"value":"6","labl":null,"stats":"14","type":"freq"},{"value":"7","labl":null,"stats":"27","type":"freq"},{"value":"8","labl":null,"stats":"45","type":"freq"},{"value":"9","labl":null,"stats":"68","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"49","type":"freq"},{"value":"-99","labl":null,"stats":"16","type":"freq"},{"value":"11","labl":"Don't know","stats":"43","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"22","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V180","name":"b25","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"538","var_end_pos":"540","var_width":"3","var_rec_seg_no":"1","labl":"Treating clients and stakeholders in Albania with respect","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB25 Treating clients and stakeholders in Namibia with respect","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"237","type":"vald"},{"value":"95","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"1","type":"freq"},{"value":"4","labl":null,"stats":"6","type":"freq"},{"value":"5","labl":null,"stats":"19","type":"freq"},{"value":"6","labl":null,"stats":"13","type":"freq"},{"value":"7","labl":null,"stats":"23","type":"freq"},{"value":"8","labl":null,"stats":"50","type":"freq"},{"value":"9","labl":null,"stats":"66","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"56","type":"freq"},{"value":"-99","labl":null,"stats":"15","type":"freq"},{"value":"11","labl":"Don't know","stats":"58","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"22","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V181","name":"b26","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"541","var_end_pos":"543","var_width":"3","var_rec_seg_no":"1","labl":"Being a long-term partner","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nTo what extent is the World Bank Group an effective development partner in Albania, in terms of each of the following?\n\nB26 Being a long-term partner","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"275","type":"vald"},{"value":"57","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"1","type":"freq"},{"value":"4","labl":null,"stats":"3","type":"freq"},{"value":"5","labl":null,"stats":"14","type":"freq"},{"value":"6","labl":null,"stats":"12","type":"freq"},{"value":"7","labl":null,"stats":"14","type":"freq"},{"value":"8","labl":null,"stats":"52","type":"freq"},{"value":"9","labl":null,"stats":"76","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"100","type":"freq"},{"value":"-99","labl":null,"stats":"13","type":"freq"},{"value":"11","labl":"Don't know","stats":"22","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"22","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V182","name":"b27_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"544","var_end_pos":"546","var_width":"3","var_rec_seg_no":"1","labl":"Reforms are not well thought out in light of country challenges","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n1 Reforms are not well thought out in light of country challenges","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"238","type":"freq"},{"value":"1","labl":null,"stats":"65","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V183","name":"b27_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"547","var_end_pos":"549","var_width":"3","var_rec_seg_no":"1","labl":"Poor coordination within the Government","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n2 Poor coordination within the Government","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"258","type":"freq"},{"value":"1","labl":null,"stats":"45","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V184","name":"b27_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"550","var_end_pos":"552","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group does not do adequate follow through\/follow-up","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n3 The World Bank Group does not do adequate follow through\/follow-up","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"293","type":"freq"},{"value":"1","labl":null,"stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V185","name":"b27_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"553","var_end_pos":"555","var_width":"3","var_rec_seg_no":"1","labl":"Political pressures and obstacles","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n4 Political pressures and obstacles","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"204","type":"freq"},{"value":"1","labl":null,"stats":"99","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V186","name":"b27_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"556","var_end_pos":"558","var_width":"3","var_rec_seg_no":"1","labl":"The Government works inefficiently","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n5 The Government works inefficiently","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"249","type":"freq"},{"value":"1","labl":null,"stats":"54","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V187","name":"b27_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"559","var_end_pos":"561","var_width":"3","var_rec_seg_no":"1","labl":"Poor donor coordination","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n6 Poor donor coordination","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"268","type":"freq"},{"value":"1","labl":null,"stats":"35","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V188","name":"b27_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"562","var_end_pos":"564","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group is not sensitive enough to political\/social realities on the ground","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n7 The World Bank Group is not sensitive enough to political\/social realities on the ground","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"264","type":"freq"},{"value":"1","labl":null,"stats":"39","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V189","name":"b27_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"565","var_end_pos":"567","var_width":"3","var_rec_seg_no":"1","labl":"Lack of\/inadequate levels of capacity in Government","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n8 Lack of\/inadequate levels of capacity in Government","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"234","type":"freq"},{"value":"1","labl":null,"stats":"69","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V190","name":"b27_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"568","var_end_pos":"570","var_width":"3","var_rec_seg_no":"1","labl":"There is not an adequate level of citizen\/civil society participation","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n9 There is not an adequate level of citizen\/civil society participation","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"230","type":"freq"},{"value":"1","labl":null,"stats":"73","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V191","name":"b27_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"571","var_end_pos":"573","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group works too slowly","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n10 The World Bank Group works too slowly","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"281","type":"freq"},{"value":"1","labl":null,"stats":"22","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V192","name":"b27_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"574","var_end_pos":"576","var_width":"3","var_rec_seg_no":"1","labl":"Poor coordination within the World Bank Group","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n11 Poor coordination within the World Bank Group","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"290","type":"freq"},{"value":"1","labl":null,"stats":"13","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V193","name":"b27_12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"577","var_end_pos":"579","var_width":"3","var_rec_seg_no":"1","labl":"Other","var_qstn_qstnlit":"SECTION B: OVERALL ATTITUDES TOWARD THE WORLD BANK GROUP\n\nB27. When World Bank Group assisted reform efforts fail or are slow to take place, which of the\nfollowing would you attribute this to?\n\n12 Other (please specify):","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"303","type":"vald"},{"value":"29","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"287","type":"freq"},{"value":"1","labl":null,"stats":"16","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"23","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V194","name":"c1_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"580","var_end_pos":"582","var_width":"3","var_rec_seg_no":"1","labl":"Social protection","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following areas of development in Albania?\n\n1 Social protection (e.g., pensions, targeted social assistance)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"270","type":"vald"},{"value":"62","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"4","type":"freq"},{"value":"2","labl":null,"stats":"5","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"5","type":"freq"},{"value":"5","labl":null,"stats":"13","type":"freq"},{"value":"6","labl":null,"stats":"25","type":"freq"},{"value":"7","labl":null,"stats":"32","type":"freq"},{"value":"8","labl":null,"stats":"50","type":"freq"},{"value":"9","labl":null,"stats":"48","type":"freq"},{"value":"10","labl":"Very  important","stats":"82","type":"freq"},{"value":"-99","labl":null,"stats":"25","type":"freq"},{"value":"11","labl":"Don't know","stats":"10","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V195","name":"c1_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"583","var_end_pos":"585","var_width":"3","var_rec_seg_no":"1","labl":"Gender equity","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following areas of development in Albania?\n\n2 Gender equity","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"269","type":"vald"},{"value":"63","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"7","type":"freq"},{"value":"2","labl":null,"stats":"6","type":"freq"},{"value":"3","labl":null,"stats":"7","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"32","type":"freq"},{"value":"6","labl":null,"stats":"28","type":"freq"},{"value":"7","labl":null,"stats":"36","type":"freq"},{"value":"8","labl":null,"stats":"54","type":"freq"},{"value":"9","labl":null,"stats":"44","type":"freq"},{"value":"10","labl":"Very  important","stats":"48","type":"freq"},{"value":"-99","labl":null,"stats":"27","type":"freq"},{"value":"11","labl":"Don't know","stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"30","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V196","name":"c1_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"586","var_end_pos":"588","var_width":"3","var_rec_seg_no":"1","labl":"Private sector development","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following areas of development in Albania?\n\n3 Private sector development","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"282","type":"vald"},{"value":"50","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"5","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"12","type":"freq"},{"value":"6","labl":null,"stats":"11","type":"freq"},{"value":"7","labl":null,"stats":"34","type":"freq"},{"value":"8","labl":null,"stats":"52","type":"freq"},{"value":"9","labl":null,"stats":"73","type":"freq"},{"value":"10","labl":"Very  important","stats":"83","type":"freq"},{"value":"-99","labl":null,"stats":"20","type":"freq"},{"value":"11","labl":"Don't know","stats":"5","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"25","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V197","name":"c1_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"589","var_end_pos":"591","var_width":"3","var_rec_seg_no":"1","labl":"Education","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following areas of development in Albania?\n\n4 Education","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"275","type":"vald"},{"value":"57","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"2","type":"freq"},{"value":"5","labl":null,"stats":"10","type":"freq"},{"value":"6","labl":null,"stats":"10","type":"freq"},{"value":"7","labl":null,"stats":"14","type":"freq"},{"value":"8","labl":null,"stats":"38","type":"freq"},{"value":"9","labl":null,"stats":"70","type":"freq"},{"value":"10","labl":"Very  important","stats":"122","type":"freq"},{"value":"-99","labl":null,"stats":"26","type":"freq"},{"value":"11","labl":"Don't know","stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"28","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V198","name":"c1_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"592","var_end_pos":"594","var_width":"3","var_rec_seg_no":"1","labl":"Public sector governance\/reform","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following areas of development in Albania?\n\n5 Public sector governance\/reform (i.e., government effectiveness, public financial management, public expenditure, fiscal system reform)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"279","type":"vald"},{"value":"53","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"4","labl":null,"stats":"4","type":"freq"},{"value":"5","labl":null,"stats":"13","type":"freq"},{"value":"6","labl":null,"stats":"8","type":"freq"},{"value":"7","labl":null,"stats":"23","type":"freq"},{"value":"8","labl":null,"stats":"56","type":"freq"},{"value":"9","labl":null,"stats":"64","type":"freq"},{"value":"10","labl":"Very  important","stats":"108","type":"freq"},{"value":"-99","labl":null,"stats":"21","type":"freq"},{"value":"11","labl":"Don't know","stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"26","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V199","name":"c1_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"595","var_end_pos":"597","var_width":"3","var_rec_seg_no":"1","labl":"Global\/regional integration","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following areas of development in Albania?\n\n6 Global\/regional integration","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"266","type":"vald"},{"value":"66","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"5","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"10","type":"freq"},{"value":"5","labl":null,"stats":"23","type":"freq"},{"value":"6","labl":null,"stats":"25","type":"freq"},{"value":"7","labl":null,"stats":"27","type":"freq"},{"value":"8","labl":null,"stats":"64","type":"freq"},{"value":"9","labl":null,"stats":"51","type":"freq"},{"value":"10","labl":"Very  important","stats":"56","type":"freq"},{"value":"-99","labl":null,"stats":"21","type":"freq"},{"value":"11","labl":"Don't know","stats":"18","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V200","name":"c1_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"598","var_end_pos":"600","var_width":"3","var_rec_seg_no":"1","labl":"Foreign direct investment","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n7 Foreign direct investment","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"278","type":"vald"},{"value":"54","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"2","type":"freq"},{"value":"4","labl":null,"stats":"3","type":"freq"},{"value":"5","labl":null,"stats":"20","type":"freq"},{"value":"6","labl":null,"stats":"12","type":"freq"},{"value":"7","labl":null,"stats":"21","type":"freq"},{"value":"8","labl":null,"stats":"42","type":"freq"},{"value":"9","labl":null,"stats":"76","type":"freq"},{"value":"10","labl":"Very  important","stats":"99","type":"freq"},{"value":"-99","labl":null,"stats":"18","type":"freq"},{"value":"11","labl":"Don't know","stats":"10","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"26","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V201","name":"c1_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"601","var_end_pos":"603","var_width":"3","var_rec_seg_no":"1","labl":"Urban development","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n8 Urban development","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"273","type":"vald"},{"value":"59","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"6","type":"freq"},{"value":"5","labl":null,"stats":"20","type":"freq"},{"value":"6","labl":null,"stats":"19","type":"freq"},{"value":"7","labl":null,"stats":"39","type":"freq"},{"value":"8","labl":null,"stats":"56","type":"freq"},{"value":"9","labl":null,"stats":"53","type":"freq"},{"value":"10","labl":"Very  important","stats":"73","type":"freq"},{"value":"-99","labl":null,"stats":"21","type":"freq"},{"value":"11","labl":"Don't know","stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V202","name":"c1_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"604","var_end_pos":"606","var_width":"3","var_rec_seg_no":"1","labl":"Energy","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n9 Energy","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"275","type":"vald"},{"value":"57","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"5","type":"freq"},{"value":"5","labl":null,"stats":"25","type":"freq"},{"value":"6","labl":null,"stats":"23","type":"freq"},{"value":"7","labl":null,"stats":"25","type":"freq"},{"value":"8","labl":null,"stats":"48","type":"freq"},{"value":"9","labl":null,"stats":"62","type":"freq"},{"value":"10","labl":"Very  important","stats":"81","type":"freq"},{"value":"-99","labl":null,"stats":"18","type":"freq"},{"value":"11","labl":"Don't know","stats":"12","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V203","name":"c1_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"607","var_end_pos":"609","var_width":"3","var_rec_seg_no":"1","labl":"Water and sanitation","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n10 Water and sanitation","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"275","type":"vald"},{"value":"57","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"1","type":"freq"},{"value":"4","labl":null,"stats":"5","type":"freq"},{"value":"5","labl":null,"stats":"17","type":"freq"},{"value":"6","labl":null,"stats":"26","type":"freq"},{"value":"7","labl":null,"stats":"24","type":"freq"},{"value":"8","labl":null,"stats":"43","type":"freq"},{"value":"9","labl":null,"stats":"71","type":"freq"},{"value":"10","labl":"Very  important","stats":"83","type":"freq"},{"value":"-99","labl":null,"stats":"19","type":"freq"},{"value":"11","labl":"Don't know","stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V204","name":"c1_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"610","var_end_pos":"612","var_width":"3","var_rec_seg_no":"1","labl":"Pollution","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n11 Pollution","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"270","type":"vald"},{"value":"62","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"3","type":"freq"},{"value":"5","labl":null,"stats":"15","type":"freq"},{"value":"6","labl":null,"stats":"23","type":"freq"},{"value":"7","labl":null,"stats":"31","type":"freq"},{"value":"8","labl":null,"stats":"43","type":"freq"},{"value":"9","labl":null,"stats":"56","type":"freq"},{"value":"10","labl":"Very  important","stats":"90","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"29","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V205","name":"c1_12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"613","var_end_pos":"615","var_width":"3","var_rec_seg_no":"1","labl":"Job creation\/employment","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n12 Job creation\/employment","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"278","type":"vald"},{"value":"54","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"4","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"2","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"7","type":"freq"},{"value":"6","labl":null,"stats":"11","type":"freq"},{"value":"7","labl":null,"stats":"22","type":"freq"},{"value":"8","labl":null,"stats":"36","type":"freq"},{"value":"9","labl":null,"stats":"62","type":"freq"},{"value":"10","labl":"Very  important","stats":"124","type":"freq"},{"value":"-99","labl":null,"stats":"17","type":"freq"},{"value":"11","labl":"Don't know","stats":"10","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V206","name":"c1_13","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"616","var_end_pos":"618","var_width":"3","var_rec_seg_no":"1","labl":"Health","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n13 Health","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"274","type":"vald"},{"value":"58","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"18","type":"freq"},{"value":"6","labl":null,"stats":"15","type":"freq"},{"value":"7","labl":null,"stats":"17","type":"freq"},{"value":"8","labl":null,"stats":"35","type":"freq"},{"value":"9","labl":null,"stats":"58","type":"freq"},{"value":"10","labl":"Very  important","stats":"118","type":"freq"},{"value":"-99","labl":null,"stats":"18","type":"freq"},{"value":"11","labl":"Don't know","stats":"13","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V207","name":"c1_14","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"619","var_end_pos":"621","var_width":"3","var_rec_seg_no":"1","labl":"Financial markets","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n14 Financial markets","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"260","type":"vald"},{"value":"72","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"2","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"24","type":"freq"},{"value":"6","labl":null,"stats":"23","type":"freq"},{"value":"7","labl":null,"stats":"40","type":"freq"},{"value":"8","labl":null,"stats":"51","type":"freq"},{"value":"9","labl":null,"stats":"49","type":"freq"},{"value":"10","labl":"Very  important","stats":"61","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"21","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"29","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V208","name":"c1_15","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"622","var_end_pos":"624","var_width":"3","var_rec_seg_no":"1","labl":"Transport","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n15 Transport (e.g., roads, bridges, transportation)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"271","type":"vald"},{"value":"61","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"2","type":"freq"},{"value":"4","labl":null,"stats":"6","type":"freq"},{"value":"5","labl":null,"stats":"17","type":"freq"},{"value":"6","labl":null,"stats":"16","type":"freq"},{"value":"7","labl":null,"stats":"29","type":"freq"},{"value":"8","labl":null,"stats":"54","type":"freq"},{"value":"9","labl":null,"stats":"69","type":"freq"},{"value":"10","labl":"Very  important","stats":"74","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"28","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V209","name":"c1_16","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"625","var_end_pos":"627","var_width":"3","var_rec_seg_no":"1","labl":"Agriculture and rural development","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n16 Agriculture and rural development","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"278","type":"vald"},{"value":"54","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"1","type":"freq"},{"value":"5","labl":null,"stats":"11","type":"freq"},{"value":"6","labl":null,"stats":"17","type":"freq"},{"value":"7","labl":null,"stats":"14","type":"freq"},{"value":"8","labl":null,"stats":"48","type":"freq"},{"value":"9","labl":null,"stats":"70","type":"freq"},{"value":"10","labl":"Very  important","stats":"111","type":"freq"},{"value":"-99","labl":null,"stats":"18","type":"freq"},{"value":"11","labl":"Don't know","stats":"9","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V210","name":"c1_17","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"628","var_end_pos":"630","var_width":"3","var_rec_seg_no":"1","labl":"Trade and exports","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n17 Trade and exports","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"259","type":"vald"},{"value":"73","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"1","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"24","type":"freq"},{"value":"6","labl":null,"stats":"23","type":"freq"},{"value":"7","labl":null,"stats":"41","type":"freq"},{"value":"8","labl":null,"stats":"57","type":"freq"},{"value":"9","labl":null,"stats":"53","type":"freq"},{"value":"10","labl":"Very  important","stats":"48","type":"freq"},{"value":"-99","labl":null,"stats":"25","type":"freq"},{"value":"11","labl":"Don't know","stats":"21","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V211","name":"c1_18","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"631","var_end_pos":"633","var_width":"3","var_rec_seg_no":"1","labl":"Crime and violence","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n18 Crime and violence","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"259","type":"vald"},{"value":"73","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"16","type":"freq"},{"value":"2","labl":null,"stats":"5","type":"freq"},{"value":"3","labl":null,"stats":"7","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"26","type":"freq"},{"value":"6","labl":null,"stats":"34","type":"freq"},{"value":"7","labl":null,"stats":"25","type":"freq"},{"value":"8","labl":null,"stats":"52","type":"freq"},{"value":"9","labl":null,"stats":"37","type":"freq"},{"value":"10","labl":"Very  important","stats":"49","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"22","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"29","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V212","name":"c1_19","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"634","var_end_pos":"636","var_width":"3","var_rec_seg_no":"1","labl":"Natural resource management","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n19 Natural resource management (renewable)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"274","type":"vald"},{"value":"58","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"12","type":"freq"},{"value":"6","labl":null,"stats":"22","type":"freq"},{"value":"7","labl":null,"stats":"38","type":"freq"},{"value":"8","labl":null,"stats":"47","type":"freq"},{"value":"9","labl":null,"stats":"65","type":"freq"},{"value":"10","labl":"Very  important","stats":"73","type":"freq"},{"value":"-99","labl":null,"stats":"19","type":"freq"},{"value":"11","labl":"Don't know","stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"28","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V213","name":"c1_20","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"637","var_end_pos":"639","var_width":"3","var_rec_seg_no":"1","labl":"Climate change","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n20 Climate change (e.g., mitigation, adaptation)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"276","type":"vald"},{"value":"56","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"4","type":"freq"},{"value":"2","labl":null,"stats":"9","type":"freq"},{"value":"3","labl":null,"stats":"8","type":"freq"},{"value":"4","labl":null,"stats":"6","type":"freq"},{"value":"5","labl":null,"stats":"21","type":"freq"},{"value":"6","labl":null,"stats":"35","type":"freq"},{"value":"7","labl":null,"stats":"32","type":"freq"},{"value":"8","labl":null,"stats":"53","type":"freq"},{"value":"9","labl":null,"stats":"50","type":"freq"},{"value":"10","labl":"Very  important","stats":"58","type":"freq"},{"value":"-99","labl":null,"stats":"19","type":"freq"},{"value":"11","labl":"Don't know","stats":"9","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"28","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V214","name":"c1_21","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"640","var_end_pos":"642","var_width":"3","var_rec_seg_no":"1","labl":"Poverty reduction","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n21 Poverty reduction","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"273","type":"vald"},{"value":"59","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"4","type":"freq"},{"value":"5","labl":null,"stats":"7","type":"freq"},{"value":"6","labl":null,"stats":"10","type":"freq"},{"value":"7","labl":null,"stats":"19","type":"freq"},{"value":"8","labl":null,"stats":"33","type":"freq"},{"value":"9","labl":null,"stats":"67","type":"freq"},{"value":"10","labl":"Very  important","stats":"127","type":"freq"},{"value":"-99","labl":null,"stats":"20","type":"freq"},{"value":"11","labl":"Don't know","stats":"12","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V215","name":"c1_22","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"643","var_end_pos":"645","var_width":"3","var_rec_seg_no":"1","labl":"Anti-corruption","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n22 Anti corruption","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"272","type":"vald"},{"value":"60","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"5","type":"freq"},{"value":"5","labl":null,"stats":"12","type":"freq"},{"value":"6","labl":null,"stats":"15","type":"freq"},{"value":"7","labl":null,"stats":"17","type":"freq"},{"value":"8","labl":null,"stats":"36","type":"freq"},{"value":"9","labl":null,"stats":"68","type":"freq"},{"value":"10","labl":"Very  important","stats":"107","type":"freq"},{"value":"-99","labl":null,"stats":"19","type":"freq"},{"value":"11","labl":"Don't know","stats":"13","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"28","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V216","name":"c1_23","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"646","var_end_pos":"648","var_width":"3","var_rec_seg_no":"1","labl":"Judiciary reform","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n23 Judiciary reform","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"271","type":"vald"},{"value":"61","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"10","type":"freq"},{"value":"2","labl":null,"stats":"8","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"6","type":"freq"},{"value":"5","labl":null,"stats":"15","type":"freq"},{"value":"6","labl":null,"stats":"16","type":"freq"},{"value":"7","labl":null,"stats":"20","type":"freq"},{"value":"8","labl":null,"stats":"35","type":"freq"},{"value":"9","labl":null,"stats":"47","type":"freq"},{"value":"10","labl":"Very  important","stats":"109","type":"freq"},{"value":"-99","labl":null,"stats":"19","type":"freq"},{"value":"11","labl":"Don't know","stats":"15","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V217","name":"c1_24","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"649","var_end_pos":"651","var_width":"3","var_rec_seg_no":"1","labl":"Economic growth","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n24 Economic growth","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"279","type":"vald"},{"value":"53","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"2","type":"freq"},{"value":"4","labl":null,"stats":"2","type":"freq"},{"value":"5","labl":null,"stats":"10","type":"freq"},{"value":"6","labl":null,"stats":"10","type":"freq"},{"value":"7","labl":null,"stats":"17","type":"freq"},{"value":"8","labl":null,"stats":"37","type":"freq"},{"value":"9","labl":null,"stats":"74","type":"freq"},{"value":"10","labl":"Very  important","stats":"124","type":"freq"},{"value":"-99","labl":null,"stats":"15","type":"freq"},{"value":"11","labl":"Don't know","stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V218","name":"c1_25","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"652","var_end_pos":"654","var_width":"3","var_rec_seg_no":"1","labl":"Disaster risk management","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n25 Disaster risk management","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"268","type":"vald"},{"value":"64","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"4","type":"freq"},{"value":"2","labl":null,"stats":"7","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"23","type":"freq"},{"value":"6","labl":null,"stats":"27","type":"freq"},{"value":"7","labl":null,"stats":"27","type":"freq"},{"value":"8","labl":null,"stats":"68","type":"freq"},{"value":"9","labl":null,"stats":"55","type":"freq"},{"value":"10","labl":"Very  important","stats":"42","type":"freq"},{"value":"-99","labl":null,"stats":"19","type":"freq"},{"value":"11","labl":"Don't know","stats":"16","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"29","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V219","name":"c1_26","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"655","var_end_pos":"657","var_width":"3","var_rec_seg_no":"1","labl":"Equality of opportunity","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n26 Equality of opportunity (i.e., social inclusion)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"269","type":"vald"},{"value":"63","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"4","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"10","type":"freq"},{"value":"5","labl":null,"stats":"15","type":"freq"},{"value":"6","labl":null,"stats":"24","type":"freq"},{"value":"7","labl":null,"stats":"27","type":"freq"},{"value":"8","labl":null,"stats":"54","type":"freq"},{"value":"9","labl":null,"stats":"65","type":"freq"},{"value":"10","labl":"Very  important","stats":"61","type":"freq"},{"value":"-99","labl":null,"stats":"21","type":"freq"},{"value":"11","labl":"Don't know","stats":"15","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V220","name":"c1_27","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"658","var_end_pos":"660","var_width":"3","var_rec_seg_no":"1","labl":"Environmental sustainability","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n27 Environmental sustainability","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"278","type":"vald"},{"value":"54","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"5","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"12","type":"freq"},{"value":"5","labl":null,"stats":"20","type":"freq"},{"value":"6","labl":null,"stats":"24","type":"freq"},{"value":"7","labl":null,"stats":"40","type":"freq"},{"value":"8","labl":null,"stats":"53","type":"freq"},{"value":"9","labl":null,"stats":"57","type":"freq"},{"value":"10","labl":"Very  important","stats":"61","type":"freq"},{"value":"-99","labl":null,"stats":"17","type":"freq"},{"value":"11","labl":"Don't know","stats":"10","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V221","name":"c1_28","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"661","var_end_pos":"663","var_width":"3","var_rec_seg_no":"1","labl":"Information and communications technology","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC1. In your opinion, how IMPORTANT is it for the World Bank Group to be involved in the following\nareas of development in Albania?\n\n28 Information and communications technology","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"271","type":"vald"},{"value":"61","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not important  at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"24","type":"freq"},{"value":"6","labl":null,"stats":"27","type":"freq"},{"value":"7","labl":null,"stats":"38","type":"freq"},{"value":"8","labl":null,"stats":"54","type":"freq"},{"value":"9","labl":null,"stats":"51","type":"freq"},{"value":"10","labl":"Very  important","stats":"58","type":"freq"},{"value":"-99","labl":null,"stats":"20","type":"freq"},{"value":"11","labl":"Don't know","stats":"14","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"27","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V222","name":"c2_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"664","var_end_pos":"666","var_width":"3","var_rec_seg_no":"1","labl":"Social protection","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n1 Social protection (e.g., pensions, targeted social assistance)","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"143","type":"vald"},{"value":"189","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"7","type":"freq"},{"value":"4","labl":null,"stats":"12","type":"freq"},{"value":"5","labl":null,"stats":"16","type":"freq"},{"value":"6","labl":null,"stats":"15","type":"freq"},{"value":"7","labl":null,"stats":"30","type":"freq"},{"value":"8","labl":null,"stats":"29","type":"freq"},{"value":"9","labl":null,"stats":"20","type":"freq"},{"value":"10","labl":"Very effective","stats":"11","type":"freq"},{"value":"-99","labl":null,"stats":"20","type":"freq"},{"value":"11","labl":"Don't know","stats":"135","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V223","name":"c2_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"667","var_end_pos":"669","var_width":"3","var_rec_seg_no":"1","labl":"Gender equity","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n2 Gender equity","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"129","type":"vald"},{"value":"203","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"8","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"14","type":"freq"},{"value":"6","labl":null,"stats":"23","type":"freq"},{"value":"7","labl":null,"stats":"19","type":"freq"},{"value":"8","labl":null,"stats":"25","type":"freq"},{"value":"9","labl":null,"stats":"20","type":"freq"},{"value":"10","labl":"Very effective","stats":"8","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"147","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V224","name":"c2_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"670","var_end_pos":"672","var_width":"3","var_rec_seg_no":"1","labl":"Private sector development","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n3 Private sector development","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"152","type":"vald"},{"value":"180","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"12","type":"freq"},{"value":"5","labl":null,"stats":"19","type":"freq"},{"value":"6","labl":null,"stats":"27","type":"freq"},{"value":"7","labl":null,"stats":"34","type":"freq"},{"value":"8","labl":null,"stats":"28","type":"freq"},{"value":"9","labl":null,"stats":"17","type":"freq"},{"value":"10","labl":"Very effective","stats":"7","type":"freq"},{"value":"-99","labl":null,"stats":"30","type":"freq"},{"value":"11","labl":"Don't know","stats":"116","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V225","name":"c2_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"673","var_end_pos":"675","var_width":"3","var_rec_seg_no":"1","labl":"Education","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n4 Education","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"152","type":"vald"},{"value":"180","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"16","type":"freq"},{"value":"5","labl":null,"stats":"24","type":"freq"},{"value":"6","labl":null,"stats":"18","type":"freq"},{"value":"7","labl":null,"stats":"25","type":"freq"},{"value":"8","labl":null,"stats":"29","type":"freq"},{"value":"9","labl":null,"stats":"23","type":"freq"},{"value":"10","labl":"Very effective","stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"122","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"36","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V226","name":"c2_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"676","var_end_pos":"678","var_width":"3","var_rec_seg_no":"1","labl":"Public sector governance\/reform","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n5 Public sector governance\/reform (i.e., government effectiveness, public financial management, public expenditure, fiscal system reform)","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"202","type":"vald"},{"value":"130","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"12","type":"freq"},{"value":"5","labl":null,"stats":"27","type":"freq"},{"value":"6","labl":null,"stats":"16","type":"freq"},{"value":"7","labl":null,"stats":"31","type":"freq"},{"value":"8","labl":null,"stats":"43","type":"freq"},{"value":"9","labl":null,"stats":"47","type":"freq"},{"value":"10","labl":"Very effective","stats":"20","type":"freq"},{"value":"-99","labl":null,"stats":"23","type":"freq"},{"value":"11","labl":"Don't know","stats":"73","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V227","name":"c2_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"679","var_end_pos":"681","var_width":"3","var_rec_seg_no":"1","labl":"Global\/regional integration","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n6 Global\/regional integration","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"124","type":"vald"},{"value":"208","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"5","type":"freq"},{"value":"5","labl":null,"stats":"26","type":"freq"},{"value":"6","labl":null,"stats":"21","type":"freq"},{"value":"7","labl":null,"stats":"13","type":"freq"},{"value":"8","labl":null,"stats":"24","type":"freq"},{"value":"9","labl":null,"stats":"24","type":"freq"},{"value":"10","labl":"Very effective","stats":"4","type":"freq"},{"value":"-99","labl":null,"stats":"24","type":"freq"},{"value":"11","labl":"Don't know","stats":"151","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"33","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V228","name":"c2_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"682","var_end_pos":"684","var_width":"3","var_rec_seg_no":"1","labl":"Foreign direct investment","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n7 Foreign direct investment","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"153","type":"vald"},{"value":"179","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"7","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"17","type":"freq"},{"value":"6","labl":null,"stats":"22","type":"freq"},{"value":"7","labl":null,"stats":"20","type":"freq"},{"value":"8","labl":null,"stats":"31","type":"freq"},{"value":"9","labl":null,"stats":"31","type":"freq"},{"value":"10","labl":"Very effective","stats":"12","type":"freq"},{"value":"-99","labl":null,"stats":"21","type":"freq"},{"value":"11","labl":"Don't know","stats":"125","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"33","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V229","name":"c2_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"685","var_end_pos":"687","var_width":"3","var_rec_seg_no":"1","labl":"Urban development","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n8 Urban development","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"161","type":"vald"},{"value":"171","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"7","type":"freq"},{"value":"4","labl":null,"stats":"12","type":"freq"},{"value":"5","labl":null,"stats":"20","type":"freq"},{"value":"6","labl":null,"stats":"18","type":"freq"},{"value":"7","labl":null,"stats":"30","type":"freq"},{"value":"8","labl":null,"stats":"32","type":"freq"},{"value":"9","labl":null,"stats":"23","type":"freq"},{"value":"10","labl":"Very effective","stats":"15","type":"freq"},{"value":"-99","labl":null,"stats":"25","type":"freq"},{"value":"11","labl":"Don't know","stats":"113","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"33","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V230","name":"c2_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"688","var_end_pos":"690","var_width":"3","var_rec_seg_no":"1","labl":"Energy","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n9 Energy","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"184","type":"vald"},{"value":"148","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"4","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"10","type":"freq"},{"value":"5","labl":null,"stats":"11","type":"freq"},{"value":"6","labl":null,"stats":"25","type":"freq"},{"value":"7","labl":null,"stats":"24","type":"freq"},{"value":"8","labl":null,"stats":"41","type":"freq"},{"value":"9","labl":null,"stats":"36","type":"freq"},{"value":"10","labl":"Very effective","stats":"26","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"92","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V231","name":"c2_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"691","var_end_pos":"693","var_width":"3","var_rec_seg_no":"1","labl":"Water and sanitation","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n10 Water and sanitation","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"165","type":"vald"},{"value":"167","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"12","type":"freq"},{"value":"6","labl":null,"stats":"25","type":"freq"},{"value":"7","labl":null,"stats":"20","type":"freq"},{"value":"8","labl":null,"stats":"39","type":"freq"},{"value":"9","labl":null,"stats":"35","type":"freq"},{"value":"10","labl":"Very effective","stats":"16","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"111","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V232","name":"c2_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"694","var_end_pos":"696","var_width":"3","var_rec_seg_no":"1","labl":"Pollution","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n11 Pollution","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"135","type":"vald"},{"value":"197","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"13","type":"freq"},{"value":"5","labl":null,"stats":"18","type":"freq"},{"value":"6","labl":null,"stats":"22","type":"freq"},{"value":"7","labl":null,"stats":"23","type":"freq"},{"value":"8","labl":null,"stats":"22","type":"freq"},{"value":"9","labl":null,"stats":"18","type":"freq"},{"value":"10","labl":"Very effective","stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"24","type":"freq"},{"value":"11","labl":"Don't know","stats":"139","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V233","name":"c2_12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"697","var_end_pos":"699","var_width":"3","var_rec_seg_no":"1","labl":"Job creation\/employment","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n12 Job creation\/employment","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"140","type":"vald"},{"value":"192","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"6","type":"freq"},{"value":"3","labl":null,"stats":"9","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"19","type":"freq"},{"value":"6","labl":null,"stats":"20","type":"freq"},{"value":"7","labl":null,"stats":"29","type":"freq"},{"value":"8","labl":null,"stats":"21","type":"freq"},{"value":"9","labl":null,"stats":"20","type":"freq"},{"value":"10","labl":"Very effective","stats":"6","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"135","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"35","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V234","name":"c2_13","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"700","var_end_pos":"702","var_width":"3","var_rec_seg_no":"1","labl":"Health","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n13 Health","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"149","type":"vald"},{"value":"183","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"8","type":"freq"},{"value":"4","labl":null,"stats":"11","type":"freq"},{"value":"5","labl":null,"stats":"20","type":"freq"},{"value":"6","labl":null,"stats":"18","type":"freq"},{"value":"7","labl":null,"stats":"23","type":"freq"},{"value":"8","labl":null,"stats":"24","type":"freq"},{"value":"9","labl":null,"stats":"27","type":"freq"},{"value":"10","labl":"Very effective","stats":"11","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"127","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V235","name":"c2_14","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"703","var_end_pos":"705","var_width":"3","var_rec_seg_no":"1","labl":"Financial markets","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n14 Financial markets","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"129","type":"vald"},{"value":"203","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"4","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"12","type":"freq"},{"value":"6","labl":null,"stats":"30","type":"freq"},{"value":"7","labl":null,"stats":"18","type":"freq"},{"value":"8","labl":null,"stats":"19","type":"freq"},{"value":"9","labl":null,"stats":"18","type":"freq"},{"value":"10","labl":"Very effective","stats":"11","type":"freq"},{"value":"-99","labl":null,"stats":"23","type":"freq"},{"value":"11","labl":"Don't know","stats":"146","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V236","name":"c2_15","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"706","var_end_pos":"708","var_width":"3","var_rec_seg_no":"1","labl":"Transport","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n15 Transport (e.g., roads, bridges, transportation)","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"169","type":"vald"},{"value":"163","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"11","type":"freq"},{"value":"5","labl":null,"stats":"13","type":"freq"},{"value":"6","labl":null,"stats":"18","type":"freq"},{"value":"7","labl":null,"stats":"26","type":"freq"},{"value":"8","labl":null,"stats":"39","type":"freq"},{"value":"9","labl":null,"stats":"37","type":"freq"},{"value":"10","labl":"Very effective","stats":"18","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"107","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V237","name":"c2_16","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"709","var_end_pos":"711","var_width":"3","var_rec_seg_no":"1","labl":"Agriculture and rural development","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n16 Agriculture and rural development","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"166","type":"vald"},{"value":"166","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"12","type":"freq"},{"value":"5","labl":null,"stats":"16","type":"freq"},{"value":"6","labl":null,"stats":"16","type":"freq"},{"value":"7","labl":null,"stats":"30","type":"freq"},{"value":"8","labl":null,"stats":"35","type":"freq"},{"value":"9","labl":null,"stats":"26","type":"freq"},{"value":"10","labl":"Very effective","stats":"20","type":"freq"},{"value":"-99","labl":null,"stats":"21","type":"freq"},{"value":"11","labl":"Don't know","stats":"109","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"36","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V238","name":"c2_17","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"712","var_end_pos":"714","var_width":"3","var_rec_seg_no":"1","labl":"Trade and exports","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n17 Trade and exports","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"121","type":"vald"},{"value":"211","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"18","type":"freq"},{"value":"6","labl":null,"stats":"19","type":"freq"},{"value":"7","labl":null,"stats":"26","type":"freq"},{"value":"8","labl":null,"stats":"20","type":"freq"},{"value":"9","labl":null,"stats":"13","type":"freq"},{"value":"10","labl":"Very effective","stats":"8","type":"freq"},{"value":"-99","labl":null,"stats":"26","type":"freq"},{"value":"11","labl":"Don't know","stats":"150","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"35","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V239","name":"c2_18","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"715","var_end_pos":"717","var_width":"3","var_rec_seg_no":"1","labl":"Natural resource management","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n18 Natural resource management (renewable)","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"146","type":"vald"},{"value":"186","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"17","type":"freq"},{"value":"6","labl":null,"stats":"21","type":"freq"},{"value":"7","labl":null,"stats":"23","type":"freq"},{"value":"8","labl":null,"stats":"28","type":"freq"},{"value":"9","labl":null,"stats":"26","type":"freq"},{"value":"10","labl":"Very effective","stats":"11","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"130","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V240","name":"c2_19","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"718","var_end_pos":"720","var_width":"3","var_rec_seg_no":"1","labl":"Climate change","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n19 Climate change (e.g., mitigation, adaptation)","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"129","type":"vald"},{"value":"203","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"5","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"20","type":"freq"},{"value":"6","labl":null,"stats":"21","type":"freq"},{"value":"7","labl":null,"stats":"19","type":"freq"},{"value":"8","labl":null,"stats":"28","type":"freq"},{"value":"9","labl":null,"stats":"15","type":"freq"},{"value":"10","labl":"Very effective","stats":"7","type":"freq"},{"value":"-99","labl":null,"stats":"23","type":"freq"},{"value":"11","labl":"Don't know","stats":"146","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V241","name":"c2_20","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"721","var_end_pos":"723","var_width":"3","var_rec_seg_no":"1","labl":"Poverty reduction","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n20 Poverty reduction","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"170","type":"vald"},{"value":"162","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"4","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"8","type":"freq"},{"value":"4","labl":null,"stats":"15","type":"freq"},{"value":"5","labl":null,"stats":"13","type":"freq"},{"value":"6","labl":null,"stats":"21","type":"freq"},{"value":"7","labl":null,"stats":"22","type":"freq"},{"value":"8","labl":null,"stats":"39","type":"freq"},{"value":"9","labl":null,"stats":"30","type":"freq"},{"value":"10","labl":"Very effective","stats":"14","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"105","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"35","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V242","name":"c2_21","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"724","var_end_pos":"726","var_width":"3","var_rec_seg_no":"1","labl":"Anti-corruption","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n21 Anti corruption","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"158","type":"vald"},{"value":"174","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"7","type":"freq"},{"value":"2","labl":null,"stats":"8","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"13","type":"freq"},{"value":"5","labl":null,"stats":"22","type":"freq"},{"value":"6","labl":null,"stats":"25","type":"freq"},{"value":"7","labl":null,"stats":"23","type":"freq"},{"value":"8","labl":null,"stats":"20","type":"freq"},{"value":"9","labl":null,"stats":"25","type":"freq"},{"value":"10","labl":"Very effective","stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"23","type":"freq"},{"value":"11","labl":"Don't know","stats":"117","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V243","name":"c2_22","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"727","var_end_pos":"729","var_width":"3","var_rec_seg_no":"1","labl":"Economic growth","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n22 Economic growth","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"175","type":"vald"},{"value":"157","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"6","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"19","type":"freq"},{"value":"6","labl":null,"stats":"26","type":"freq"},{"value":"7","labl":null,"stats":"26","type":"freq"},{"value":"8","labl":null,"stats":"35","type":"freq"},{"value":"9","labl":null,"stats":"31","type":"freq"},{"value":"10","labl":"Very effective","stats":"15","type":"freq"},{"value":"-99","labl":null,"stats":"23","type":"freq"},{"value":"11","labl":"Don't know","stats":"99","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"35","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V244","name":"c2_23","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"730","var_end_pos":"732","var_width":"3","var_rec_seg_no":"1","labl":"Disaster risk management","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n23 Disaster risk management","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"130","type":"vald"},{"value":"202","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"9","type":"freq"},{"value":"4","labl":null,"stats":"6","type":"freq"},{"value":"5","labl":null,"stats":"21","type":"freq"},{"value":"6","labl":null,"stats":"16","type":"freq"},{"value":"7","labl":null,"stats":"24","type":"freq"},{"value":"8","labl":null,"stats":"25","type":"freq"},{"value":"9","labl":null,"stats":"16","type":"freq"},{"value":"10","labl":"Very effective","stats":"6","type":"freq"},{"value":"-99","labl":null,"stats":"22","type":"freq"},{"value":"11","labl":"Don't know","stats":"145","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"35","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V245","name":"c2_24","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"733","var_end_pos":"735","var_width":"3","var_rec_seg_no":"1","labl":"Equality of opportunity","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n24 Equality of opportunity (i.e., social inclusion)","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"142","type":"vald"},{"value":"190","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"6","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"24","type":"freq"},{"value":"6","labl":null,"stats":"9","type":"freq"},{"value":"7","labl":null,"stats":"19","type":"freq"},{"value":"8","labl":null,"stats":"31","type":"freq"},{"value":"9","labl":null,"stats":"30","type":"freq"},{"value":"10","labl":"Very effective","stats":"7","type":"freq"},{"value":"-99","labl":null,"stats":"25","type":"freq"},{"value":"11","labl":"Don't know","stats":"131","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V246","name":"c2_25","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"736","var_end_pos":"738","var_width":"3","var_rec_seg_no":"1","labl":"Environmental sustainability","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n25 Environmental sustainability","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"140","type":"vald"},{"value":"192","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"7","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"23","type":"freq"},{"value":"6","labl":null,"stats":"19","type":"freq"},{"value":"7","labl":null,"stats":"25","type":"freq"},{"value":"8","labl":null,"stats":"19","type":"freq"},{"value":"9","labl":null,"stats":"28","type":"freq"},{"value":"10","labl":"Very effective","stats":"6","type":"freq"},{"value":"-99","labl":null,"stats":"21","type":"freq"},{"value":"11","labl":"Don't know","stats":"137","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V247","name":"c2_26","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"739","var_end_pos":"741","var_width":"3","var_rec_seg_no":"1","labl":"Information and communications technology","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC2. How EFFECTIVE do you believe the World Bank Group is in terms of the work it does in the\nfollowing areas of development in Albania?\n\n26 Information and communications technology","var_qstn_ivulnstr":"If you have NO exposure to\/experience in working in any of the sectors listed below, please respond \"Don't know\"","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"132","type":"vald"},{"value":"200","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not effective at all","stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"20","type":"freq"},{"value":"6","labl":null,"stats":"14","type":"freq"},{"value":"7","labl":null,"stats":"20","type":"freq"},{"value":"8","labl":null,"stats":"28","type":"freq"},{"value":"9","labl":null,"stats":"26","type":"freq"},{"value":"10","labl":"Very effective","stats":"8","type":"freq"},{"value":"-99","labl":null,"stats":"24","type":"freq"},{"value":"11","labl":"Don't know","stats":"142","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V248","name":"c3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"742","var_end_pos":"744","var_width":"3","var_rec_seg_no":"1","labl":"To what extent does the World Bank Group's work help to achieve development results in Albania?","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nC3. To what extent does the World Bank Group\u2019s work help to achieve development results in Albania?","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"275","type":"vald"},{"value":"57","type":"invd"},{"value":"2","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"0","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"7","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"25","type":"freq"},{"value":"6","labl":null,"stats":"32","type":"freq"},{"value":"7","labl":null,"stats":"50","type":"freq"},{"value":"8","labl":null,"stats":"70","type":"freq"},{"value":"9","labl":null,"stats":"51","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"28","type":"freq"},{"value":"-99","labl":null,"stats":"5","type":"freq"},{"value":"11","labl":"Don't know","stats":"23","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"29","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V249","name":"c4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"745","var_end_pos":"747","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group's financial instruments meet the needs of Albania","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nTo what extent do you agree with the following statements about the World Bank Group in Albania?\n\nC4 The World Bank Group\u2019s financial instruments (i.e., investment lending, Development Policy Loan, Trust Funds, Program-for-Results, etc.) meet the needs of Albania","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"264","type":"vald"},{"value":"68","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"5","type":"freq"},{"value":"2","labl":null,"stats":"6","type":"freq"},{"value":"3","labl":null,"stats":"10","type":"freq"},{"value":"4","labl":null,"stats":"14","type":"freq"},{"value":"5","labl":null,"stats":"25","type":"freq"},{"value":"6","labl":null,"stats":"34","type":"freq"},{"value":"7","labl":null,"stats":"58","type":"freq"},{"value":"8","labl":null,"stats":"60","type":"freq"},{"value":"9","labl":null,"stats":"37","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"15","type":"freq"},{"value":"-99","labl":null,"stats":"5","type":"freq"},{"value":"11","labl":"Don't know","stats":"34","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"29","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V250","name":"c5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"748","var_end_pos":"750","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group meets Albania's needs for knowledge services","var_qstn_qstnlit":"SECTION C: WORLD BANK GROUP\u2019S EFFECTIVENESS AND RESULTS\n\nTo what extent do you agree with the following statements about the World Bank Group in Albania?\n\nC5 The World Bank Group meets Albania\u2019s needs for knowledge services (e.g., research, analysis, data, technical assistance)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"257","type":"vald"},{"value":"75","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"5","type":"freq"},{"value":"3","labl":null,"stats":"17","type":"freq"},{"value":"4","labl":null,"stats":"10","type":"freq"},{"value":"5","labl":null,"stats":"26","type":"freq"},{"value":"6","labl":null,"stats":"24","type":"freq"},{"value":"7","labl":null,"stats":"38","type":"freq"},{"value":"8","labl":null,"stats":"74","type":"freq"},{"value":"9","labl":null,"stats":"42","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"18","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"11","labl":"Don't know","stats":"37","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"31","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V251","name":"d1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"751","var_end_pos":"753","var_width":"3","var_rec_seg_no":"1","labl":"How frequently do you consult World Bank Group's knowledge work and activities in the work you do?","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nD1. How frequently do you consult World Bank Group\u2019s knowledge work and activities in the work you do?","var_val_range":[{"units":"REAL","min":"1","max":"5"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"1","type":"min"},{"value":"5","type":"max"}],"var_catgry":[{"value":"1","labl":"Weekly","stats":"27","type":"freq"},{"value":"2","labl":"Monthly","stats":"84","type":"freq"},{"value":"3","labl":"A few times a year","stats":"136","type":"freq"},{"value":"4","labl":"Rarely","stats":"41","type":"freq"},{"value":"5","labl":"Never","stats":"8","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"30","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V252","name":"d2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"754","var_end_pos":"756","var_width":"3","var_rec_seg_no":"1","labl":"Are timely","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nIn Albania, to what extent do you believe that the World Bank Group\u2019s knowledge work and activities:\n\nD2 Are timely","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"248","type":"vald"},{"value":"84","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"6","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"29","type":"freq"},{"value":"6","labl":null,"stats":"31","type":"freq"},{"value":"7","labl":null,"stats":"38","type":"freq"},{"value":"8","labl":null,"stats":"56","type":"freq"},{"value":"9","labl":null,"stats":"53","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"19","type":"freq"},{"value":"-99","labl":null,"stats":"10","type":"freq"},{"value":"11","labl":"Don't know","stats":"41","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"33","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V253","name":"d3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"757","var_end_pos":"759","var_width":"3","var_rec_seg_no":"1","labl":"Include appropriate level of stakeholder involvement during preparation","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nIn Albania, to what extent do you believe that the World Bank Group\u2019s knowledge work and activities:\n\nD3 Include appropriate level of stakeholder involvement during preparation","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"249","type":"vald"},{"value":"83","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"14","type":"freq"},{"value":"4","labl":null,"stats":"15","type":"freq"},{"value":"5","labl":null,"stats":"27","type":"freq"},{"value":"6","labl":null,"stats":"27","type":"freq"},{"value":"7","labl":null,"stats":"35","type":"freq"},{"value":"8","labl":null,"stats":"58","type":"freq"},{"value":"9","labl":null,"stats":"58","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"8","type":"freq"},{"value":"-99","labl":null,"stats":"9","type":"freq"},{"value":"11","labl":"Don't know","stats":"42","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"32","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V254","name":"d4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"760","var_end_pos":"762","var_width":"3","var_rec_seg_no":"1","labl":"Lead to practical solutions","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nIn Albania, to what extent do you believe that the World Bank Group\u2019s knowledge work and activities:\n\nD4 Lead to practical solutions","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"261","type":"vald"},{"value":"71","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"6","type":"freq"},{"value":"3","labl":null,"stats":"12","type":"freq"},{"value":"4","labl":null,"stats":"13","type":"freq"},{"value":"5","labl":null,"stats":"33","type":"freq"},{"value":"6","labl":null,"stats":"27","type":"freq"},{"value":"7","labl":null,"stats":"52","type":"freq"},{"value":"8","labl":null,"stats":"61","type":"freq"},{"value":"9","labl":null,"stats":"47","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"9","type":"freq"},{"value":"-99","labl":null,"stats":"8","type":"freq"},{"value":"11","labl":"Don't know","stats":"30","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"33","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V255","name":"d5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"763","var_end_pos":"765","var_width":"3","var_rec_seg_no":"1","labl":"Are accessible (well written and easy to understand)","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nIn Albania, to what extent do you believe that the World Bank Group\u2019s knowledge work and activities:\n\nD5 Are accessible (well written and easy to understand)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"270","type":"vald"},{"value":"62","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"22","type":"freq"},{"value":"6","labl":null,"stats":"18","type":"freq"},{"value":"7","labl":null,"stats":"40","type":"freq"},{"value":"8","labl":null,"stats":"64","type":"freq"},{"value":"9","labl":null,"stats":"77","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"31","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"11","labl":"Don't know","stats":"18","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"33","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V256","name":"d6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"766","var_end_pos":"768","var_width":"3","var_rec_seg_no":"1","labl":"Are source of relevant information on global good practices","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nIn Albania, to what extent do you believe that the World Bank Group\u2019s knowledge work and activities:\n\nD6 Are source of relevant information on global good practices","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"263","type":"vald"},{"value":"69","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"6","type":"freq"},{"value":"5","labl":null,"stats":"14","type":"freq"},{"value":"6","labl":null,"stats":"19","type":"freq"},{"value":"7","labl":null,"stats":"34","type":"freq"},{"value":"8","labl":null,"stats":"55","type":"freq"},{"value":"9","labl":null,"stats":"81","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"46","type":"freq"},{"value":"-99","labl":null,"stats":"12","type":"freq"},{"value":"11","labl":"Don't know","stats":"24","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"33","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V257","name":"d7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"769","var_end_pos":"771","var_width":"3","var_rec_seg_no":"1","labl":"Are relevant to country challenges","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nIn Albania, to what extent do you believe that the World Bank Group\u2019s knowledge work and activities:\n\nD7 Are relevant to country challenges","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"267","type":"vald"},{"value":"65","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"9","type":"freq"},{"value":"4","labl":null,"stats":"10","type":"freq"},{"value":"5","labl":null,"stats":"19","type":"freq"},{"value":"6","labl":null,"stats":"25","type":"freq"},{"value":"7","labl":null,"stats":"39","type":"freq"},{"value":"8","labl":null,"stats":"74","type":"freq"},{"value":"9","labl":null,"stats":"67","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"21","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"11","labl":"Don't know","stats":"22","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"32","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V258","name":"d8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"772","var_end_pos":"774","var_width":"3","var_rec_seg_no":"1","labl":"Are adequately disseminated","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nIn Albania, to what extent do you believe that the World Bank Group\u2019s knowledge work and activities:\n\nD8 Are adequately disseminated","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"251","type":"vald"},{"value":"81","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"4","type":"freq"},{"value":"2","labl":null,"stats":"7","type":"freq"},{"value":"3","labl":null,"stats":"9","type":"freq"},{"value":"4","labl":null,"stats":"14","type":"freq"},{"value":"5","labl":null,"stats":"32","type":"freq"},{"value":"6","labl":null,"stats":"22","type":"freq"},{"value":"7","labl":null,"stats":"40","type":"freq"},{"value":"8","labl":null,"stats":"53","type":"freq"},{"value":"9","labl":null,"stats":"48","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"22","type":"freq"},{"value":"-99","labl":null,"stats":"10","type":"freq"},{"value":"11","labl":"Don't know","stats":"38","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"33","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V259","name":"d9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"775","var_end_pos":"777","var_width":"3","var_rec_seg_no":"1","labl":"Are translated enough into local language","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nIn Albania, to what extent do you believe that the World Bank Group\u2019s knowledge work and activities:\n\nD9 Are translated enough into local language","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"239","type":"vald"},{"value":"93","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"5","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"11","type":"freq"},{"value":"5","labl":null,"stats":"25","type":"freq"},{"value":"6","labl":null,"stats":"17","type":"freq"},{"value":"7","labl":null,"stats":"33","type":"freq"},{"value":"8","labl":null,"stats":"49","type":"freq"},{"value":"9","labl":null,"stats":"57","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"35","type":"freq"},{"value":"-99","labl":null,"stats":"9","type":"freq"},{"value":"11","labl":"Don't know","stats":"51","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"33","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V260","name":"d10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"778","var_end_pos":"780","var_width":"3","var_rec_seg_no":"1","labl":"Are adaptable to Albania's specific development challenges and country circumstances","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nIn Albania, to what extent do you believe that the World Bank Group\u2019s knowledge work and activities:\n\nD10 Are adaptable to Albania\u2019s specific development challenges and country circumstances","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"268","type":"vald"},{"value":"64","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"14","type":"freq"},{"value":"5","labl":null,"stats":"26","type":"freq"},{"value":"6","labl":null,"stats":"26","type":"freq"},{"value":"7","labl":null,"stats":"44","type":"freq"},{"value":"8","labl":null,"stats":"72","type":"freq"},{"value":"9","labl":null,"stats":"58","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"18","type":"freq"},{"value":"-99","labl":null,"stats":"8","type":"freq"},{"value":"11","labl":"Don't know","stats":"24","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"32","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V261","name":"d11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"781","var_end_pos":"783","var_width":"3","var_rec_seg_no":"1","labl":"Overall, how significant a contribution do you believe the World Bank Group's knowledge work and activities make to development results in your country?","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nD11. Overall, how significant a contribution do you believe the World Bank Group's knowledge work and activities make to development results in your country?","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"268","type":"vald"},{"value":"64","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Not significant at all","stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"10","type":"freq"},{"value":"5","labl":null,"stats":"24","type":"freq"},{"value":"6","labl":null,"stats":"21","type":"freq"},{"value":"7","labl":null,"stats":"48","type":"freq"},{"value":"8","labl":null,"stats":"85","type":"freq"},{"value":"9","labl":null,"stats":"50","type":"freq"},{"value":"10","labl":"Very significant","stats":"24","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"11","labl":"Don't know","stats":"30","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"31","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V262","name":"d12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"784","var_end_pos":"786","var_width":"3","var_rec_seg_no":"1","labl":"Overall, how would you rate the technical quality of the World Bank Group's knowledge work and activities?","var_qstn_qstnlit":"SECTION D: THE WORLD BANK GROUP\u2019S KNOWLEDGE WORK AND ACTIVITIES (i.e., ANALYSIS, STUDIES, RESEARCH, DATA, REPORTS, CONFERENCES)\n\nD12. Overall, how would you rate the technical quality of the World Bank Group's knowledge work and activities?","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"269","type":"vald"},{"value":"63","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Very low technical quality","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"3","type":"freq"},{"value":"4","labl":null,"stats":"4","type":"freq"},{"value":"5","labl":null,"stats":"21","type":"freq"},{"value":"6","labl":null,"stats":"20","type":"freq"},{"value":"7","labl":null,"stats":"33","type":"freq"},{"value":"8","labl":null,"stats":"75","type":"freq"},{"value":"9","labl":null,"stats":"75","type":"freq"},{"value":"10","labl":"Very high technical quality","stats":"36","type":"freq"},{"value":"-99","labl":null,"stats":"4","type":"freq"},{"value":"11","labl":"Don't know","stats":"28","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"31","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V263","name":"e1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"787","var_end_pos":"789","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group disburses funds promptly","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nTo what extent do you agree\/disagree with the following statements?\n\nE1 The World Bank Group disburses funds promptly","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"194","type":"vald"},{"value":"138","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"18","type":"freq"},{"value":"6","labl":null,"stats":"20","type":"freq"},{"value":"7","labl":null,"stats":"25","type":"freq"},{"value":"8","labl":null,"stats":"33","type":"freq"},{"value":"9","labl":null,"stats":"49","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"31","type":"freq"},{"value":"-99","labl":null,"stats":"8","type":"freq"},{"value":"11","labl":"Don't know","stats":"95","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"35","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V264","name":"e2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"790","var_end_pos":"792","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group effectively monitors and evaluates the projects and programs it supports","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nTo what extent do you agree\/disagree with the following statements?\n\nE2 The World Bank Group effectively monitors and evaluates the projects and programs it supports","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"245","type":"vald"},{"value":"87","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"19","type":"freq"},{"value":"6","labl":null,"stats":"22","type":"freq"},{"value":"7","labl":null,"stats":"34","type":"freq"},{"value":"8","labl":null,"stats":"49","type":"freq"},{"value":"9","labl":null,"stats":"58","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"46","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"11","labl":"Don't know","stats":"47","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V265","name":"e3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"793","var_end_pos":"795","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group's approvals and reviews are done in a timely fashion","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nTo what extent do you agree\/disagree with the following statements?\n\nE3 The World Bank Group\u2019s approvals and reviews are done in a timely fashion","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"209","type":"vald"},{"value":"123","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"11","type":"freq"},{"value":"5","labl":null,"stats":"18","type":"freq"},{"value":"6","labl":null,"stats":"23","type":"freq"},{"value":"7","labl":null,"stats":"29","type":"freq"},{"value":"8","labl":null,"stats":"43","type":"freq"},{"value":"9","labl":null,"stats":"48","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"27","type":"freq"},{"value":"-99","labl":null,"stats":"9","type":"freq"},{"value":"11","labl":"Don't know","stats":"76","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V266","name":"e4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"796","var_end_pos":"798","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group's \"Safeguard Policy\" requirements are reasonable","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nTo what extent do you agree\/disagree with the following statements?\n\nE4 The World Bank Group\u2019s \u201cSafeguard Policy\u201d requirements are reasonable","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"196","type":"vald"},{"value":"136","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"2","type":"freq"},{"value":"4","labl":null,"stats":"5","type":"freq"},{"value":"5","labl":null,"stats":"19","type":"freq"},{"value":"6","labl":null,"stats":"15","type":"freq"},{"value":"7","labl":null,"stats":"22","type":"freq"},{"value":"8","labl":null,"stats":"49","type":"freq"},{"value":"9","labl":null,"stats":"50","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"31","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"11","labl":"Don't know","stats":"89","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"36","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V267","name":"e5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"799","var_end_pos":"801","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group's conditions on its lending are reasonable","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nTo what extent do you agree\/disagree with the following statements?\n\nE5 The World Bank Group\u2019s conditions on its lending are reasonable","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"187","type":"vald"},{"value":"145","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"3","labl":null,"stats":"7","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"19","type":"freq"},{"value":"6","labl":null,"stats":"9","type":"freq"},{"value":"7","labl":null,"stats":"29","type":"freq"},{"value":"8","labl":null,"stats":"48","type":"freq"},{"value":"9","labl":null,"stats":"37","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"29","type":"freq"},{"value":"-99","labl":null,"stats":"10","type":"freq"},{"value":"11","labl":"Don't know","stats":"100","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"35","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V268","name":"e6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"802","var_end_pos":"804","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group takes decisions quickly in Albania","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nTo what extent do you agree\/disagree with the following statements?\n\nE6 The World Bank Group takes decisions quickly in Albania","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"203","type":"vald"},{"value":"129","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"9","type":"freq"},{"value":"5","labl":null,"stats":"28","type":"freq"},{"value":"6","labl":null,"stats":"21","type":"freq"},{"value":"7","labl":null,"stats":"36","type":"freq"},{"value":"8","labl":null,"stats":"40","type":"freq"},{"value":"9","labl":null,"stats":"41","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"18","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"11","labl":"Don't know","stats":"80","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V269","name":"e7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"805","var_end_pos":"807","var_width":"3","var_rec_seg_no":"1","labl":"Working with the World Bank Group increases Albania's institutional capacity","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nTo what extent do you agree\/disagree with the following statements?\n\nE7 Working with the World Bank Group increases Albania\u2019s institutional capacity","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"256","type":"vald"},{"value":"76","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"2","type":"freq"},{"value":"4","labl":null,"stats":"7","type":"freq"},{"value":"5","labl":null,"stats":"15","type":"freq"},{"value":"6","labl":null,"stats":"14","type":"freq"},{"value":"7","labl":null,"stats":"25","type":"freq"},{"value":"8","labl":null,"stats":"46","type":"freq"},{"value":"9","labl":null,"stats":"89","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"54","type":"freq"},{"value":"-99","labl":null,"stats":"10","type":"freq"},{"value":"11","labl":"Don't know","stats":"31","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"35","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V270","name":"e8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"808","var_end_pos":"810","var_width":"3","var_rec_seg_no":"1","labl":"Where country systems are adequate, the World Bank Group makes appropriate use of them","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nTo what extent do you agree\/disagree with the following statements?\n\nE8 Where country systems (e.g., procurement, financial management, etc.) are adequate, the World Bank Group makes appropriate use of them","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"190","type":"vald"},{"value":"142","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"4","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"5","type":"freq"},{"value":"4","labl":null,"stats":"6","type":"freq"},{"value":"5","labl":null,"stats":"13","type":"freq"},{"value":"6","labl":null,"stats":"7","type":"freq"},{"value":"7","labl":null,"stats":"26","type":"freq"},{"value":"8","labl":null,"stats":"44","type":"freq"},{"value":"9","labl":null,"stats":"52","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"30","type":"freq"},{"value":"-99","labl":null,"stats":"12","type":"freq"},{"value":"11","labl":"Don't know","stats":"93","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"37","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V271","name":"e9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"811","var_end_pos":"813","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group provides effective implementation support","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nTo what extent do you agree\/disagree with the following statements?\n\nE9 The World Bank Group provides effective implementation support (i.e., supervision of projects)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"245","type":"vald"},{"value":"87","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"7","type":"freq"},{"value":"4","labl":null,"stats":"3","type":"freq"},{"value":"5","labl":null,"stats":"21","type":"freq"},{"value":"6","labl":null,"stats":"13","type":"freq"},{"value":"7","labl":null,"stats":"30","type":"freq"},{"value":"8","labl":null,"stats":"58","type":"freq"},{"value":"9","labl":null,"stats":"55","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"53","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"11","labl":"Don't know","stats":"41","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"35","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V272","name":"e10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"814","var_end_pos":"816","var_width":"3","var_rec_seg_no":"1","labl":"To what extent do you believe that the World Bank Group's work helps to find solutions that promote private public partnerships in Albania?","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nE10. To what extent do you believe that the World Bank Group\u2019s work helps to find solutions that promote private public partnerships in Albania?","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"203","type":"vald"},{"value":"129","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"3","type":"freq"},{"value":"2","labl":null,"stats":"5","type":"freq"},{"value":"3","labl":null,"stats":"4","type":"freq"},{"value":"4","labl":null,"stats":"11","type":"freq"},{"value":"5","labl":null,"stats":"26","type":"freq"},{"value":"6","labl":null,"stats":"24","type":"freq"},{"value":"7","labl":null,"stats":"34","type":"freq"},{"value":"8","labl":null,"stats":"58","type":"freq"},{"value":"9","labl":null,"stats":"28","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"10","type":"freq"},{"value":"-99","labl":null,"stats":"5","type":"freq"},{"value":"11","labl":"Don't know","stats":"90","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V273","name":"e11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"817","var_end_pos":"819","var_width":"3","var_rec_seg_no":"1","labl":"To what extent do you believe the World Bank Group measures and corrects its work in real time in Albania?","var_qstn_qstnlit":"SECTION E: WORKING WITH THE WORLD BANK GROUP\n\nE11. To what extent do you believe the World Bank Group measures and corrects its work in real time in Albania?","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"207","type":"vald"},{"value":"125","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"To no degree at all","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"14","type":"freq"},{"value":"5","labl":null,"stats":"21","type":"freq"},{"value":"6","labl":null,"stats":"25","type":"freq"},{"value":"7","labl":null,"stats":"36","type":"freq"},{"value":"8","labl":null,"stats":"38","type":"freq"},{"value":"9","labl":null,"stats":"48","type":"freq"},{"value":"10","labl":"To a very significant degree","stats":"13","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"},{"value":"11","labl":"Don't know","stats":"84","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V274","name":"f1_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"820","var_end_pos":"822","var_width":"3","var_rec_seg_no":"1","labl":"Ensure greater selectivity in its work","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n1 Ensure greater selectivity in its work","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"279","type":"freq"},{"value":"1","labl":null,"stats":"17","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V275","name":"f1_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"823","var_end_pos":"825","var_width":"3","var_rec_seg_no":"1","labl":"Provide more adequate data\/knowledge\/statistics\/figures on Albania's economy","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n2 Provide more adequate data\/knowledge\/statistics\/figures on Albania\u2019s economy","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"267","type":"freq"},{"value":"1","labl":null,"stats":"29","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V276","name":"f1_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"826","var_end_pos":"828","var_width":"3","var_rec_seg_no":"1","labl":"Offer more innovative knowledge services","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n3 Offer more innovative knowledge services","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"255","type":"freq"},{"value":"1","labl":null,"stats":"41","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V277","name":"f1_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"829","var_end_pos":"831","var_width":"3","var_rec_seg_no":"1","labl":"Collaborate more effectively with Government clients","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n4 Collaborate more effectively with Government clients (e.g., national, state, local)","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"244","type":"freq"},{"value":"1","labl":null,"stats":"52","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V278","name":"f1_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"832","var_end_pos":"834","var_width":"3","var_rec_seg_no":"1","labl":"Work faster","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n5 Work faster","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"274","type":"freq"},{"value":"1","labl":null,"stats":"22","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V279","name":"f1_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"835","var_end_pos":"837","var_width":"3","var_rec_seg_no":"1","labl":"Reduce the complexity of obtaining World Bank Group financing","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n6 Reduce the complexity of obtaining World Bank Group financing","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"245","type":"freq"},{"value":"1","labl":null,"stats":"51","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V280","name":"f1_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"838","var_end_pos":"840","var_width":"3","var_rec_seg_no":"1","labl":"Help to bring discipline\/effective supervision to implementation of investment projects","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n7 Help to bring discipline\/effective supervision to implementation of investment projects","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"219","type":"freq"},{"value":"1","labl":null,"stats":"77","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V281","name":"f1_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"841","var_end_pos":"843","var_width":"3","var_rec_seg_no":"1","labl":"Offer more innovative financial products","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n8 Offer more innovative financial products","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"260","type":"freq"},{"value":"1","labl":null,"stats":"36","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V282","name":"f1_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"844","var_end_pos":"846","var_width":"3","var_rec_seg_no":"1","labl":"Improve the competitiveness of its financing compared to markets","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n9 Improve the competitiveness of its financing compared to markets (e.g., cost, timeliness, other terms)","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"272","type":"freq"},{"value":"1","labl":null,"stats":"24","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V283","name":"f1_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"847","var_end_pos":"849","var_width":"3","var_rec_seg_no":"1","labl":"Reach out more to groups outside of Government","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n10 Reach out more to groups outside of Government","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"211","type":"freq"},{"value":"1","labl":null,"stats":"85","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V284","name":"f1_11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"850","var_end_pos":"852","var_width":"3","var_rec_seg_no":"1","labl":"Increase the level of capacity development in the country","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n11 Increase the level of capacity development in the country","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"198","type":"freq"},{"value":"1","labl":null,"stats":"98","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V285","name":"f1_12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"853","var_end_pos":"855","var_width":"3","var_rec_seg_no":"1","labl":"Improve the quality of its experts as related to Albania's specific challenges","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n12 Improve the quality of its experts as related to Albania\u2019s specific challenges","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"266","type":"freq"},{"value":"1","labl":null,"stats":"30","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V286","name":"f1_13","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"856","var_end_pos":"858","var_width":"3","var_rec_seg_no":"1","labl":"Other","var_qstn_qstnlit":"ASCIISECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF1. Which of the following SHOULD the World Bank Group do to make itself of greater value in\nAlbania?\n\n13 Other (please specify):","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"296","type":"vald"},{"value":"36","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"291","type":"freq"},{"value":"1","labl":null,"stats":"5","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"34","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V287","name":"f2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"859","var_end_pos":"861","var_width":"3","var_rec_seg_no":"1","labl":"When considering the combination of services that the World Bank Group offers in Albania, and taking into account its limited level of resources, which ONE of the following do you believe the World Bank Group should offer more of in Albania?","var_qstn_qstnlit":"SECTION F: THE FUTURE ROLE OF THE WORLD BANK GROUP IN ALBANIA\n\nF2. When considering the combination of services that the World Bank Group offers in Namibia, and taking into account its limited level of resources, which ONE of the following do you believe the World Bank Group should offer more of in Albania?","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"6"}],"var_sumstat":[{"value":"293","type":"vald"},{"value":"39","type":"invd"},{"value":"1","type":"min"},{"value":"6","type":"max"}],"var_catgry":[{"value":"1","labl":"Financial services","stats":"76","type":"freq"},{"value":"2","labl":"Knowledge products","stats":"55","type":"freq"},{"value":"3","labl":"Convening services","stats":"6","type":"freq"},{"value":"4","labl":"None of the above","stats":"3","type":"freq"},{"value":"5","labl":"The combination is appropriate for Albania","stats":"140","type":"freq"},{"value":"6","labl":"Don't know","stats":"13","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"36","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V288","name":"g1_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"862","var_end_pos":"864","var_width":"3","var_rec_seg_no":"1","labl":"Local radio","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG1. How do you get most of your information about economic and social development issues in Albania?\n\n1 Local radio","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"290","type":"freq"},{"value":"1","labl":null,"stats":"1","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V289","name":"g1_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"865","var_end_pos":"867","var_width":"3","var_rec_seg_no":"1","labl":"International radio","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG1. How do you get most of your information about economic and social development issues in Albania?\n\n2 International radio","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"290","type":"freq"},{"value":"1","labl":null,"stats":"1","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V290","name":"g1_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"868","var_end_pos":"870","var_width":"3","var_rec_seg_no":"1","labl":"Social media (e.g., blogs, Facebook, Twitter, YouTube, Flickr)","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG1. How do you get most of your information about economic and social development issues in Albania?\n\n3 Social media (e.g., blogs, Facebook, Twitter, YouTube, Flickr)","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"220","type":"freq"},{"value":"1","labl":null,"stats":"71","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V291","name":"g1_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"871","var_end_pos":"873","var_width":"3","var_rec_seg_no":"1","labl":"International newspapers","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG1. How do you get most of your information about economic and social development issues in Albania?\n\n4 International newspapers","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"271","type":"freq"},{"value":"1","labl":null,"stats":"20","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V292","name":"g1_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"874","var_end_pos":"876","var_width":"3","var_rec_seg_no":"1","labl":"Local television","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG1. How do you get most of your information about economic and social development issues in Albania?\n\n5 Local television","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"175","type":"freq"},{"value":"1","labl":null,"stats":"116","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V293","name":"g1_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"877","var_end_pos":"879","var_width":"3","var_rec_seg_no":"1","labl":"Internet","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG1. How do you get most of your information about economic and social development issues in Albania?\n\n6 Internet","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"75","type":"freq"},{"value":"1","labl":null,"stats":"216","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V294","name":"g1_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"880","var_end_pos":"882","var_width":"3","var_rec_seg_no":"1","labl":"Periodicals","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG1. How do you get most of your information about economic and social development issues in Albania?\n\n7 Periodicals","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"248","type":"freq"},{"value":"1","labl":null,"stats":"43","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V295","name":"g1_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"883","var_end_pos":"885","var_width":"3","var_rec_seg_no":"1","labl":"International television","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG1. How do you get most of your information about economic and social development issues in Albania?\n\n8 International television","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"279","type":"freq"},{"value":"1","labl":null,"stats":"12","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V296","name":"g1_9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"886","var_end_pos":"888","var_width":"3","var_rec_seg_no":"1","labl":"Local newspapers","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG1. How do you get most of your information about economic and social development issues in Albania?\n\n9 Local newspapers","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"255","type":"freq"},{"value":"1","labl":null,"stats":"36","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V297","name":"g1_10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"889","var_end_pos":"891","var_width":"3","var_rec_seg_no":"1","labl":"Other","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG1. How do you get most of your information about economic and social development issues in Albania?\n\n10 Other (please specify):","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"274","type":"freq"},{"value":"1","labl":null,"stats":"17","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V298","name":"g2_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"892","var_end_pos":"894","var_width":"3","var_rec_seg_no":"1","labl":"World Bank Group's publications and other written materials","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG2. How would you prefer to receive information from the World Bank Group?\n\n1 World Bank Group\u2019s publications and other written materials","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"189","type":"freq"},{"value":"1","labl":null,"stats":"102","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V299","name":"g2_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"895","var_end_pos":"897","var_width":"3","var_rec_seg_no":"1","labl":"e-Newsletters","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG2. How would you prefer to receive information from the World Bank Group?\n\n2 e-Newsletters","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"220","type":"freq"},{"value":"1","labl":null,"stats":"71","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V300","name":"g2_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"898","var_end_pos":"900","var_width":"3","var_rec_seg_no":"1","labl":"World Bank Group's seminars\/workshops\/conferences","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG2. How would you prefer to receive information from the World Bank Group?\n\n3 World Bank Group\u2019s seminars\/workshops\/conferences","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"194","type":"freq"},{"value":"1","labl":null,"stats":"97","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V301","name":"g2_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"901","var_end_pos":"903","var_width":"3","var_rec_seg_no":"1","labl":"Mobile phones","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG2. How would you prefer to receive information from the World Bank Group?\n\n4 Mobile phones","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"274","type":"freq"},{"value":"1","labl":null,"stats":"17","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V302","name":"g2_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"904","var_end_pos":"906","var_width":"3","var_rec_seg_no":"1","labl":"Direct contact with World Bank Group","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG2. How would you prefer to receive information from the World Bank Group?\n\n5 Direct contact with World Bank Group (i.e., face to face meetings\/discussions)","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"196","type":"freq"},{"value":"1","labl":null,"stats":"95","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V303","name":"g2_6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"907","var_end_pos":"909","var_width":"3","var_rec_seg_no":"1","labl":"World Bank Group's website","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG2. How would you prefer to receive information from the World Bank Group?\n\n6 World Bank Group\u2019s website","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"167","type":"freq"},{"value":"1","labl":null,"stats":"124","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V304","name":"g2_7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"910","var_end_pos":"912","var_width":"3","var_rec_seg_no":"1","labl":"Social media (e.g., blogs, Facebook, Twitter, YouTube, Flickr)","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG2. How would you prefer to receive information from the World Bank Group?\n\n7 Social media (e.g., blogs, Facebook, Twitter, YouTube, Flickr)","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"254","type":"freq"},{"value":"1","labl":null,"stats":"37","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V305","name":"g2_8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"913","var_end_pos":"915","var_width":"3","var_rec_seg_no":"1","labl":"Other","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG2. How would you prefer to receive information from the World Bank Group?\n\n8 Other (please specify):","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"290","type":"freq"},{"value":"1","labl":null,"stats":"1","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V306","name":"g3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"916","var_end_pos":"918","var_width":"3","var_rec_seg_no":"1","labl":"Are you aware of the World Bank Group's Access to Information Policies under which the World Bank Group discloses any information in its possession that is not on a list of exceptions?","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG3 Are you aware of the World Bank Group's Access to Information Policies under which the World Bank Group discloses any information in its possession that is not on a list of exceptions?","var_val_range":[{"units":"REAL","min":"1","max":"2"}],"var_sumstat":[{"value":"287","type":"vald"},{"value":"45","type":"invd"},{"value":"1","type":"min"},{"value":"2","type":"max"}],"var_catgry":[{"value":"1","labl":"Yes","stats":"84","type":"freq"},{"value":"2","labl":"No","stats":"203","type":"freq"},{"value":"-99","labl":null,"stats":"6","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V307","name":"g4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"919","var_end_pos":"921","var_width":"3","var_rec_seg_no":"1","labl":"Do you have reliable access to the Internet?","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG4 Do you have reliable access to the Internet?","var_val_range":[{"units":"REAL","min":"1","max":"2"}],"var_sumstat":[{"value":"289","type":"vald"},{"value":"43","type":"invd"},{"value":"1","type":"min"},{"value":"2","type":"max"}],"var_catgry":[{"value":"1","labl":"Yes","stats":"281","type":"freq"},{"value":"2","labl":"No","stats":"8","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"40","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V308","name":"g5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"922","var_end_pos":"924","var_width":"3","var_rec_seg_no":"1","labl":"Do you use\/have you used the World Bank Group website?","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG5 Do you use\/have you used the World Bank Group website?","var_val_range":[{"units":"REAL","min":"1","max":"2"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"1","type":"min"},{"value":"2","type":"max"}],"var_catgry":[{"value":"1","labl":"Yes","stats":"257","type":"freq"},{"value":"2","labl":"No","stats":"34","type":"freq"},{"value":"-99","labl":null,"stats":"2","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V309","name":"g6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"925","var_end_pos":"927","var_width":"3","var_rec_seg_no":"1","labl":"Do you currently consult the World Bank Group social media sites (e.g., blogs, Facebook, Twitter, YouTube, and Flickr)?","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG6 Do you currently consult the World Bank Group social media sites (e.g., blogs, Facebook, Twitter, YouTube, and Flickr)?","var_val_range":[{"units":"REAL","min":"1","max":"2"}],"var_sumstat":[{"value":"289","type":"vald"},{"value":"43","type":"invd"},{"value":"1","type":"min"},{"value":"2","type":"max"}],"var_catgry":[{"value":"1","labl":"Yes","stats":"98","type":"freq"},{"value":"2","labl":"No","stats":"191","type":"freq"},{"value":"-99","labl":null,"stats":"4","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"39","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V310","name":"g7","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"928","var_end_pos":"930","var_width":"3","var_rec_seg_no":"1","labl":"Which Internet connection do you use primarily when visiting a World Bank Group website?","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG7. Which Internet connection do you use primarily when visiting a World Bank Group website?","var_val_range":[{"units":"REAL","min":"1","max":"2"}],"var_sumstat":[{"value":"281","type":"vald"},{"value":"51","type":"invd"},{"value":"1","type":"min"},{"value":"2","type":"max"}],"var_catgry":[{"value":"1","labl":"High speed\/WiFi","stats":"225","type":"freq"},{"value":"2","labl":"Dial-up","stats":"56","type":"freq"},{"value":"-99","labl":null,"stats":"9","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"42","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V311","name":"g8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"931","var_end_pos":"933","var_width":"3","var_rec_seg_no":"1","labl":"How frequently do you consult the World Bank Group's website and\/or social media channels (e.g., blogs, Facebook, Twitter, YouTube, Flickr) for information\/knowledge that you can use in your work?","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nG8. How frequently do you consult the World Bank Group\u2019s website and\/or social media channels (e.g., blogs, Facebook, Twitter, YouTube, Flickr) for information\/knowledge that you can use in your work?","var_val_range":[{"units":"REAL","min":"1","max":"5"}],"var_sumstat":[{"value":"291","type":"vald"},{"value":"41","type":"invd"},{"value":"1","type":"min"},{"value":"5","type":"max"}],"var_catgry":[{"value":"1","labl":"Weekly","stats":"41","type":"freq"},{"value":"2","labl":"Monthly","stats":"70","type":"freq"},{"value":"3","labl":"A few times a year","stats":"117","type":"freq"},{"value":"4","labl":"Rarely","stats":"50","type":"freq"},{"value":"5","labl":"Never","stats":"13","type":"freq"},{"value":"-99","labl":null,"stats":"3","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V312","name":"g9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"934","var_end_pos":"936","var_width":"3","var_rec_seg_no":"1","labl":"I find the World Bank Group's websites easy to navigate","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nPlease rate how much you agree with the following statements.\n\nG9 I find the World Bank Group\u2019s websites easy to navigate.","var_qstn_ivulnstr":"Only answer if you have used a World Bank Group website","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"249","type":"vald"},{"value":"83","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"1","type":"freq"},{"value":"4","labl":null,"stats":"2","type":"freq"},{"value":"5","labl":null,"stats":"15","type":"freq"},{"value":"6","labl":null,"stats":"23","type":"freq"},{"value":"7","labl":null,"stats":"31","type":"freq"},{"value":"8","labl":null,"stats":"50","type":"freq"},{"value":"9","labl":null,"stats":"69","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"57","type":"freq"},{"value":"-99","labl":null,"stats":"28","type":"freq"},{"value":"11","labl":"Don't know","stats":"8","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"47","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V313","name":"g10","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"937","var_end_pos":"939","var_width":"3","var_rec_seg_no":"1","labl":"I find the information on the World Bank Group's websites useful","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nPlease rate how much you agree with the following statements.\n\nG10 I find the information on the World Bank Group\u2019s websites useful.","var_qstn_ivulnstr":"Only answer if you have used a World Bank Group website","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"246","type":"vald"},{"value":"86","type":"invd"},{"value":"2","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"0","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"1","type":"freq"},{"value":"4","labl":null,"stats":"3","type":"freq"},{"value":"5","labl":null,"stats":"8","type":"freq"},{"value":"6","labl":null,"stats":"11","type":"freq"},{"value":"7","labl":null,"stats":"24","type":"freq"},{"value":"8","labl":null,"stats":"58","type":"freq"},{"value":"9","labl":null,"stats":"78","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"61","type":"freq"},{"value":"-99","labl":null,"stats":"30","type":"freq"},{"value":"11","labl":"Don't know","stats":"10","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"46","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V314","name":"g11","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"940","var_end_pos":"942","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group's social media channels (e.g., blogs, Facebook, Twitter, YouTube, Flickr) are valuable sources of information about the institution","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nPlease rate how much you agree with the following statements.\n\nG11 The World Bank Group\u2019s social media channels (e.g., blogs, Facebook, Twitter, YouTube, Flickr) are valuable sources of information about the institution","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"159","type":"vald"},{"value":"173","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"2","type":"freq"},{"value":"2","labl":null,"stats":"3","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"2","type":"freq"},{"value":"5","labl":null,"stats":"12","type":"freq"},{"value":"6","labl":null,"stats":"12","type":"freq"},{"value":"7","labl":null,"stats":"24","type":"freq"},{"value":"8","labl":null,"stats":"34","type":"freq"},{"value":"9","labl":null,"stats":"31","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"33","type":"freq"},{"value":"-99","labl":null,"stats":"8","type":"freq"},{"value":"11","labl":"Don't know","stats":"128","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"37","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V315","name":"g12","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"943","var_end_pos":"945","var_width":"3","var_rec_seg_no":"1","labl":"When I need information from the World Bank Group I know how to find it (e.g., whom to call, where to reach them, etc.)","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nPlease rate how much you agree with the following statements.\n\nG12 When I need information from the World Bank Group I know how to find it (e.g., whom to call, where to reach them, etc.)","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"262","type":"vald"},{"value":"70","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"7","type":"freq"},{"value":"2","labl":null,"stats":"4","type":"freq"},{"value":"3","labl":null,"stats":"6","type":"freq"},{"value":"4","labl":null,"stats":"8","type":"freq"},{"value":"5","labl":null,"stats":"14","type":"freq"},{"value":"6","labl":null,"stats":"12","type":"freq"},{"value":"7","labl":null,"stats":"29","type":"freq"},{"value":"8","labl":null,"stats":"48","type":"freq"},{"value":"9","labl":null,"stats":"55","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"79","type":"freq"},{"value":"-99","labl":null,"stats":"5","type":"freq"},{"value":"11","labl":"Don't know","stats":"27","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"38","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V316","name":"g13","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"946","var_end_pos":"948","var_width":"3","var_rec_seg_no":"1","labl":"The World Bank Group is responsive to my information requests and inquiries","var_qstn_qstnlit":"SECTION G: COMMUNICATION AND INFORMATION SHARING\n\nPlease rate how much you agree with the following statements.\n\nG13 The World Bank Group is responsive to my information requests and inquiries","var_val_range":[{"units":"REAL","min":"1","max":"10"}],"var_sumstat":[{"value":"198","type":"vald"},{"value":"134","type":"invd"},{"value":"1","type":"min"},{"value":"10","type":"max"}],"var_catgry":[{"value":"1","labl":"Strongly disagree","stats":"1","type":"freq"},{"value":"2","labl":null,"stats":"2","type":"freq"},{"value":"3","labl":null,"stats":"2","type":"freq"},{"value":"4","labl":null,"stats":"6","type":"freq"},{"value":"5","labl":null,"stats":"14","type":"freq"},{"value":"6","labl":null,"stats":"6","type":"freq"},{"value":"7","labl":null,"stats":"21","type":"freq"},{"value":"8","labl":null,"stats":"35","type":"freq"},{"value":"9","labl":null,"stats":"48","type":"freq"},{"value":"10","labl":"Strongly agree","stats":"63","type":"freq"},{"value":"-99","labl":null,"stats":"9","type":"freq"},{"value":"11","labl":"Don't know","stats":"88","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"37","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V317","name":"h1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"949","var_end_pos":"951","var_width":"3","var_rec_seg_no":"1","labl":"Which of the following best describes your current position?","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH1. Which of the following best describes your current position?","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"19"}],"var_sumstat":[{"value":"325","type":"vald"},{"value":"7","type":"invd"},{"value":"1","type":"min"},{"value":"19","type":"max"}],"var_catgry":[{"value":"1","labl":"Office of the President, Prime Minister","stats":"11","type":"freq"},{"value":"2","labl":"Office of Minister","stats":"13","type":"freq"},{"value":"3","labl":"Office of Parliamentarian","stats":"5","type":"freq"},{"value":"4","labl":"Employee of a Ministry, Ministerial Department or Implementa","stats":"30","type":"freq"},{"value":"5","labl":"PMU\/Consultant\/Contractor working on World Bank Group suppor","stats":"30","type":"freq"},{"value":"6","labl":"Local Government Office or Staff","stats":"41","type":"freq"},{"value":"7","labl":"Bilateral\/Multilateral Agency","stats":"14","type":"freq"},{"value":"8","labl":"Private Sector Organization","stats":"34","type":"freq"},{"value":"9","labl":"Private Foundation","stats":"0","type":"freq"},{"value":"10","labl":"Financial Sector\/Private Bank","stats":"11","type":"freq"},{"value":"11","labl":"NGO\/Community Based Organization","stats":"41","type":"freq"},{"value":"12","labl":"Media","stats":"16","type":"freq"},{"value":"13","labl":"Independent Government Institution","stats":"15","type":"freq"},{"value":"14","labl":"Trade Union","stats":"1","type":"freq"},{"value":"15","labl":"Faith-Based Group","stats":"1","type":"freq"},{"value":"16","labl":"Youth Group","stats":"1","type":"freq"},{"value":"17","labl":"Academia\/Research Institute\/Think Tank","stats":"33","type":"freq"},{"value":"18","labl":"Judiciary Branch","stats":"1","type":"freq"},{"value":"19","labl":"Other","stats":"27","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V318","name":"h2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"952","var_end_pos":"954","var_width":"3","var_rec_seg_no":"1","labl":"Please identify the primary specialization of your work.","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH2. Please identify the primary specialization of your work.","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"21"}],"var_sumstat":[{"value":"321","type":"vald"},{"value":"11","type":"invd"},{"value":"1","type":"min"},{"value":"21","type":"max"}],"var_catgry":[{"value":"1","labl":"Water","stats":"11","type":"freq"},{"value":"2","labl":"Social protection and labor","stats":"18","type":"freq"},{"value":"3","labl":"Fragility, conflict and violence","stats":"2","type":"freq"},{"value":"4","labl":"Environment and natural resources","stats":"19","type":"freq"},{"value":"5","labl":"Public-private partnerships","stats":"2","type":"freq"},{"value":"6","labl":"Education","stats":"31","type":"freq"},{"value":"7","labl":"Health, nutrition, and population","stats":"5","type":"freq"},{"value":"8","labl":"Energy and extractives","stats":"26","type":"freq"},{"value":"9","labl":"Macroeconomics and fiscal management","stats":"17","type":"freq"},{"value":"10","labl":"Trade and competitiveness","stats":"5","type":"freq"},{"value":"11","labl":"Finance and markets","stats":"35","type":"freq"},{"value":"12","labl":"Gender","stats":"3","type":"freq"},{"value":"13","labl":"Transport and ICT","stats":"14","type":"freq"},{"value":"14","labl":"Urban, rural, and social development","stats":"22","type":"freq"},{"value":"15","labl":"Governance","stats":"29","type":"freq"},{"value":"16","labl":"Poverty","stats":"3","type":"freq"},{"value":"17","labl":"Jobs","stats":"6","type":"freq"},{"value":"18","labl":"Agriculture","stats":"8","type":"freq"},{"value":"19","labl":"Climate Change","stats":"2","type":"freq"},{"value":"20","labl":"Generalist (specialized in multiple sectors)","stats":"19","type":"freq"},{"value":"21","labl":"Other","stats":"44","type":"freq"},{"value":"-99","labl":null,"stats":"10","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"1","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V319","name":"h3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"955","var_end_pos":"957","var_width":"3","var_rec_seg_no":"1","labl":"Currently, do you professionally collaborate\/work with the World Bank Group (IBRD, IFC, or MIGA) in your country?","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH3. Currently, do you professionally collaborate\/work with the World Bank Group (IBRD, IFC, or MIGA) in your country?","var_val_range":[{"units":"REAL","min":"1","max":"2"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"1","type":"min"},{"value":"2","type":"max"}],"var_catgry":[{"value":"1","labl":"Yes","stats":"180","type":"freq"},{"value":"2","labl":"No","stats":"138","type":"freq"},{"value":"-99","labl":null,"stats":"10","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"4","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V320","name":"h4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"958","var_end_pos":"960","var_width":"3","var_rec_seg_no":"1","labl":"Which of the following agencies of the World Bank Group do you primarily engage with in Albania?","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH4. Which of the following agencies of the World Bank Group do you primarily engage with in Albania?","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"4"}],"var_sumstat":[{"value":"276","type":"vald"},{"value":"56","type":"invd"},{"value":"1","type":"min"},{"value":"4","type":"max"}],"var_catgry":[{"value":"1","labl":"The World Bank (IBRD)","stats":"212","type":"freq"},{"value":"2","labl":"The International Finance Corporation (IFC)","stats":"30","type":"freq"},{"value":"3","labl":"The Multilateral Investment Guarantee Agency (MIGA)","stats":"3","type":"freq"},{"value":"4","labl":"Other","stats":"31","type":"freq"},{"value":"-99","labl":null,"stats":"45","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"11","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V321","name":"h5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"961","var_end_pos":"963","var_width":"3","var_rec_seg_no":"1","labl":"Do your projects involve both the World Bank and the IFC?","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH5. Do your projects involve both the World Bank and the IFC?","var_qstn_postqtxt":"If YES please go to Question H6; If NO please go to H7","var_val_range":[{"units":"REAL","min":"1","max":"2"}],"var_sumstat":[{"value":"318","type":"vald"},{"value":"14","type":"invd"},{"value":"1","type":"min"},{"value":"2","type":"max"}],"var_catgry":[{"value":"1","labl":"Yes","stats":"138","type":"freq"},{"value":"2","labl":"No","stats":"180","type":"freq"},{"value":"-99","labl":null,"stats":"12","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"2","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V322","name":"h6","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"964","var_end_pos":"966","var_width":"3","var_rec_seg_no":"1","labl":"If yes, what was your view of how the two institutions work together in Albania?","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH6. If yes, what was your view of how the two institutions work together in Albania?","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"4"}],"var_sumstat":[{"value":"142","type":"vald"},{"value":"190","type":"invd"},{"value":"1","type":"min"},{"value":"4","type":"max"}],"var_catgry":[{"value":"1","labl":"The two institutions work well together","stats":"93","type":"freq"},{"value":"2","labl":"The way the two institutions work together needs improvement","stats":"34","type":"freq"},{"value":"3","labl":"The two institutions do not work well together","stats":"1","type":"freq"},{"value":"4","labl":"Don't know","stats":"14","type":"freq"},{"value":"-99","labl":null,"stats":"8","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"182","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V323","name":"h7_1","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"967","var_end_pos":"969","var_width":"3","var_rec_seg_no":"1","labl":"Observer (i.e., follow in media, discuss in informal conversations, etc.)","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH7. Which of the following describes most of your exposure to the World Bank Group in Albania?\n\n1 Observer (i.e., follow in media, discuss in informal conversations, etc.)","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"319","type":"vald"},{"value":"13","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"278","type":"freq"},{"value":"1","labl":null,"stats":"41","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"2","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V324","name":"h7_2","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"970","var_end_pos":"972","var_width":"3","var_rec_seg_no":"1","labl":"Use World Bank Group reports\/data","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH7. Which of the following describes most of your exposure to the World Bank Group in Albania?\n\n2 Use World Bank Group reports\/data","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"319","type":"vald"},{"value":"13","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"201","type":"freq"},{"value":"1","labl":null,"stats":"118","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"2","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V325","name":"h7_3","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"973","var_end_pos":"975","var_width":"3","var_rec_seg_no":"1","labl":"Engage in World Bank Group related\/sponsored events\/activities","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH7. Which of the following describes most of your exposure to the World Bank Group in Albania?\n\n3 Engage in World Bank Group related\/sponsored events\/activities","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"319","type":"vald"},{"value":"13","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"228","type":"freq"},{"value":"1","labl":null,"stats":"91","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"2","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V326","name":"h7_4","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"976","var_end_pos":"978","var_width":"3","var_rec_seg_no":"1","labl":"Collaborate as part of my professional duties","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH7. Which of the following describes most of your exposure to the World Bank Group in Albania?\n\n4 Collaborate as part of my professional duties","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"319","type":"vald"},{"value":"13","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"169","type":"freq"},{"value":"1","labl":null,"stats":"150","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"2","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V327","name":"h7_5","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"979","var_end_pos":"981","var_width":"3","var_rec_seg_no":"1","labl":"Use World Bank Group website for information, data, research, etc.","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH7. Which of the following describes most of your exposure to the World Bank Group in Albania?\n\n5 Use World Bank Group website for information, data, research, etc.","var_qstn_ivulnstr":"Choose no more than TWO","var_val_range":[{"units":"REAL","min":"0","max":"1"}],"var_sumstat":[{"value":"319","type":"vald"},{"value":"13","type":"invd"},{"value":"0","type":"min"},{"value":"1","type":"max"}],"var_catgry":[{"value":"0","labl":null,"stats":"227","type":"freq"},{"value":"1","labl":null,"stats":"92","type":"freq"},{"value":"-99","labl":null,"stats":"11","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"2","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V328","name":"h8","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"982","var_end_pos":"984","var_width":"3","var_rec_seg_no":"1","labl":"What's your gender?","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH8. What\u2019s your gender?","var_val_range":[{"units":"REAL","min":"1","max":"2"}],"var_sumstat":[{"value":"326","type":"vald"},{"value":"6","type":"invd"},{"value":"1","type":"min"},{"value":"2","type":"max"}],"var_catgry":[{"value":"1","labl":"Female","stats":"148","type":"freq"},{"value":"2","labl":"Male","stats":"178","type":"freq"},{"value":"-99","labl":null,"stats":"5","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"1","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V329","name":"h9","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"985","var_end_pos":"987","var_width":"3","var_rec_seg_no":"1","labl":"Which best represents your geographic location?","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH9. Which best represents your geographic location?","var_val_range":[{"units":"REAL","min":"1","max":"4"}],"var_sumstat":[{"value":"325","type":"vald"},{"value":"7","type":"invd"},{"value":"1","type":"min"},{"value":"4","type":"max"}],"var_catgry":[{"value":"1","labl":"Tirana and Durr\u00c3\u00abs","stats":"257","type":"freq"},{"value":"2","labl":"North Albania","stats":"12","type":"freq"},{"value":"3","labl":"Central Albania","stats":"25","type":"freq"},{"value":"4","labl":"South Albania","stats":"31","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V330","name":"stakeholders","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"988","var_end_pos":"990","var_width":"3","var_rec_seg_no":"1","labl":"Which of the following best describes your current position?","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH2. Please identify the primary specialization of your work. \n\n-Stakeholders","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"19"}],"var_sumstat":[{"value":"325","type":"vald"},{"value":"7","type":"invd"},{"value":"1","type":"min"},{"value":"19","type":"max"}],"var_catgry":[{"value":"1","labl":"Office of the President\/Prime Minister","stats":"11","type":"freq"},{"value":"2","labl":"Office of Minister","stats":"13","type":"freq"},{"value":"4","labl":"Employee of a Ministry","stats":"30","type":"freq"},{"value":"5","labl":"PMU\/Contractor on WBG-supported project","stats":"30","type":"freq"},{"value":"6","labl":"Local Government","stats":"41","type":"freq"},{"value":"7","labl":"Bilateral\/Multilateral Agency","stats":"14","type":"freq"},{"value":"8","labl":"Private Sector\/Financial Sector\/Private Bank","stats":"45","type":"freq"},{"value":"11","labl":"NGO\/CBO","stats":"41","type":"freq"},{"value":"12","labl":"Media","stats":"16","type":"freq"},{"value":"13","labl":"Independent Government Institution","stats":"15","type":"freq"},{"value":"17","labl":"Academia","stats":"33","type":"freq"},{"value":"19","labl":"Other","stats":"36","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V331","name":"location","file_id":"F1","var_dcml":"0","var_intrvl":"discrete","var_start_pos":"991","var_end_pos":"993","var_width":"3","var_rec_seg_no":"1","labl":"Which best represents your geographic location?","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH9. Which best represents your geographic location?\n\n-Location","var_val_range":[{"units":"REAL","min":"1","max":"2"}],"var_sumstat":[{"value":"325","type":"vald"},{"value":"7","type":"invd"},{"value":"1","type":"min"},{"value":"2","type":"max"}],"var_catgry":[{"value":"1","labl":"Tirana and Durr\u00c3\u00abs","stats":"257","type":"freq"},{"value":"2","labl":"Other Areas","stats":"68","type":"freq"},{"value":"-99","labl":null,"stats":"7","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V332","name":"stake_grp","file_id":"F1","var_dcml":"2","var_intrvl":"discrete","var_start_pos":"994","var_end_pos":"997","var_width":"4","var_rec_seg_no":"1","labl":"Which of the following best describes your current position?","var_qstn_qstnlit":"SECTION H: BACKGROUND INFORMATION\n\nH2. Please identify the primary specialization of your work. \n\n-Stake_grp","var_qstn_ivulnstr":"Select only ONE response","var_val_range":[{"units":"REAL","min":"1","max":"7"}],"var_sumstat":[{"value":"257","type":"vald"},{"value":"75","type":"invd"},{"value":"1","type":"min"},{"value":"7","type":"max"}],"var_catgry":[{"value":"1","labl":"Office of the President\/Prime Minister\/Minister","stats":"24","type":"freq"},{"value":"2","labl":"Government Institutions","stats":"81","type":"freq"},{"value":"3","labl":"Bilateral\/Multilateral Agency","stats":"14","type":"freq"},{"value":"4","labl":"Private Sector","stats":"45","type":"freq"},{"value":"5","labl":"Academia","stats":"33","type":"freq"},{"value":"6","labl":"Media","stats":"16","type":"freq"},{"value":"7","labl":"Civil Society","stats":"44","type":"freq"},{"value":"Sysmiss","labl":null,"stats":"75","type":"freq"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"},{"vid":"V333","name":"weight","file_id":"F1","var_dcml":"2","var_intrvl":"contin","var_start_pos":"998","var_end_pos":"1001","var_width":"4","var_rec_seg_no":"1","var_qstn_qstnlit":"Weight","var_val_range":[{"units":"REAL","min":"0.6771","max":"1.9697"}],"var_sumstat":[{"value":"257","type":"vald"},{"value":"75","type":"invd"},{"value":"0.677","type":"min"},{"value":"1.97","type":"max"}],"var_format":"numeric","var_format_schema":"other","fid":"F1"}],"variable_groups":[]}