IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IND_1993_NSS49-SCH1.2_V01_M
central

National Sample Survey 1993 (49th Round) - Schedule 1.2 - Housing Condition and Migration

India, 1993
Reference ID
IND_1993_NSS49-SCH1.2_v01_M
Producer(s)
National Sample Survey Office
Metadata
DDI/XML JSON
Created on
Dec 20, 2012
Last modified
Mar 29, 2019
Page views
49660
Downloads
7004
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • NSS49_Sch12_bk1_3
  • NSS49_Sch12_bk3
  • NSS49_Sch12_bk4
  • NSS49_Sch12_bk5_6
  • NSS49_Sch12_bk7_8
  • NSS49_Sch12_bk8a
  • NSS49_Sch12_bk8b
  • NSS49_Sch12_bk8c
  • NSS49_Sch12_bk9
  • NSS49_Sch12_bk10
  • NSS49_Sch12_bk11

Data file: NSS49_Sch12_bk8c

Block 8 : Particulars of building construction for residential purpose : Some general particulars of the building construction made during the last 5 years by the sample household for residential purposes will be collected and recorded in this block. Provision has been made in this block to record the particulars of 5 building constructions.
This file contains items 10 and 11 of block 8

Cases: 7484
Variables: 28

Variables

hhid
Household ID
state
State
round
Round-Schedule
statereg
State-Region(ZSR)
subround
Sub-Round
flot
Flot
FSU_No
Village/Block Sr. No.(FSU)
sub_bl_No
Hamlet Group/Sub-block No.
secstgstr
Second-stage stratum No.
hhno
Sample Household No.
level
Level No.
srl_No
Srl No. of construction
S12B8_v10a
Rs.Cost of construction during last year(a)Material
S12B8_v10b
Rs.Cost of construction during last year(b)Labour
S12B8_v10c
Rs.Cost of construction during last year(c)Others
S12B8_v10d
Rs.Cost of construction during last year(d)total
S12B8_v11a
Rs.Construction cost of buildings completed last year:(a)Material
S12B8_v11b
Rs.Construction cost of buildings completed last year:(b)Labour
S12B8_v11c
Rs.Construction cost of buildings completed last year:(c)Others
S12B8_v11d
Rs.Construction cost of buildings completed last year:(d)Total
sample
Sample
sector
Sector
stratum
Stratum No.
substratum
Sub-stratum
subsample
Sub-sample
MLT_subsample
Multiplier-Subsample
MLT_combined
Multiplier-Combined
MPCE
Monthly Per capita Expenditure
Total: 28
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.