IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MLI_2016_ES_V01_M / variable [F4]
central

Enterprise Survey 2016

Mali, 2016
Get Microdata
Reference ID
MLI_2016_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
7672
Downloads
498
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • mali_2016_full_data

When You Applied For A Water Connection, Was An Informal Gift/Payment Requested? (c14)

Data file: mali_2016_full_data

Overview

Valid: 27
Invalid: 158
Type: Discrete
Decimal: 0
Start: 191
End: 192
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Categories
Value Category
-9 Don't know (spontaneous)
-8 Refusal (spontaneous)
1 Yes
2 No
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for water connection. Self-explanatory
2) Sensitive question, no clarification can be offered.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.