IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NIC_2003-2016_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2003-2006-2010-2016

Nicaragua, 2003 - 2017
Get Microdata
Reference ID
NIC_2003-2016_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
23299
Downloads
74
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nicaragua_2003_2006_2010_2016_test

How long did it take in total (in days) to get all the necessary requirements an (_2003_s0720b)

Data file: Nicaragua_2003_2006_2010_2016_test

Overview

Valid: 98
Invalid: 1501
Type: Discrete
Decimal: 0
Start: 4333
End: 4335
Width: 3
Range: -
Format:

Questions and instructions

Literal question
How long did it take in total (in days) to get all the necessary requirements and permits to construct the building (include the time to obtain the construction permit the approval of the plans, etc)?
Categories
Value Category
-7 NA
-6 NS
-5 Construyó sin obtener permiso
1
2
3
4
5
6
7
8
10
14
15
16
30
45
60
90
180
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.