IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NIC_2003-2016_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2003-2006-2010-2016

Nicaragua, 2003 - 2017
Get Microdata
Reference ID
NIC_2003-2016_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
23397
Downloads
74
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nicaragua_2003_2006_2010_2016_test

How much was the total cost to obtain all these requirements and permits to cons (_2003_s0720c_1)

Data file: Nicaragua_2003_2006_2010_2016_test

Overview

Valid: 59
Invalid: 1540
Type: Discrete
Decimal: 0
Start: 4336
End: 4348
Width: 13
Range: -
Format:

Questions and instructions

Literal question
How much was the total cost to obtain all these requirements and permits to construct it (do not include the cost of the building itself)?
Categories
Value Category
-7 NA
-6 NS
50
100
120
150
250
300
350
500
600
800
1000
1200
2000
2500
2850.26611328125
3000
3562.83251953125
5000
5700.5322265625
6100
7000
7125.6650390625
8000
9000
10000
20000
28502.66015625
40000
64130.98828125
71256.6484375
213769.953125
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.