IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NIC_2003-2016_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2003-2006-2010-2016

Nicaragua, 2003 - 2017
Get Microdata
Reference ID
NIC_2003-2016_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
23346
Downloads
74
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nicaragua_2003_2006_2010_2016_test

How much was the total cost to obtain all these requirements and permits to cons (_2003_s0720c_2)

Data file: Nicaragua_2003_2006_2010_2016_test

Overview

Valid: 12
Invalid: 1587
Type: Discrete
Decimal: 0
Start: 4349
End: 4353
Width: 5
Range: -
Format:

Questions and instructions

Literal question
How much was the total cost to obtain all these requirements and permits to construct it (do not include the cost of the building itself)?
Categories
Value Category
-7 NA
-6 NS
200
250
400
500
2000
4500
5000
15000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.