Home
Microdata Catalog
Citations
Login
Login
Home
/
Central Data Catalog
/
IDN_2018_TEIBVF_V01_M
Village Law: Technical Evaluation of Infrastructure Built with Village Funds 2018
Indonesia
,
2018
Get Microdata
Reference ID
IDN_2018_TEIBVF_v01_M
Producer(s)
World Bank
Metadata
DDI/XML
JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
8634
Downloads
204
Study Description
Data Dictionary
Downloads
Get Microdata
Data files
BPS_FT_(0-7)_A_public
BPS_FT_(0-7)_B_public
BPS_FT_(0-7)_C_public
BPS_FT_(0-7)_D_public
BPS_FT_(0-7)_E_public
Data file: BPS_FT_(0-7)_C_public
VILLAGE LAW 2018 TECHNICAL EVALUATION
Infrastructure Type C – WATER SUPPLY
Cases:
14
Variables:
122
Variables
kodedesa
BPS unique village code
infra_type
Type of infrastructure
infra_VID
Village level identifying infrastructure number
infra_ID
Unique infrastructure number
yr_constr
Year of infrastructure construction
type_constr
Type of infrastructure construction
constr_modality
Modality of infrastructure construction
num_hh
Number of households benefitting from infrastructure construction
num_benef
Number of beneficiaries benefitting from infrastructure construction
remote
Remote/not remote status of infrastructure construction location, by village
date_inspect
Date of infrastructure construction inspection
Smell
Water source (smell and color), evaluation result
Chem
Water source (chemical analysis), evaluation result
Shed
Water source (watershed protection), evaluation result
System
Water system design, evaluation result
Bore
Borehole and pump system, evaluation result
Structure
Resevoir (structural integrety), evaluation result
Easy
Resevoir (ease of cleaning), evaluation result
Pipes
Transmission and distribution pipe (proper installation), evaluation result
Location
Public Taps (number and location), evaluation result
Fixtures
Public Taps (fixtures), evaluation result
Platforms
Public Taps (platforms), evaluation result
Pressure
Water pressure and quality, evaluation result
Other
Other structures, evaluation result
OpMain
Operation and maintenance, evaluation result
Constr
Construction quality, assessment
DesignCom
Design completeness, assessment
Funct
Functionality, assessment
Design
Adequacy of design consultation with users
File
File completeness (meeting notes, land donation records, design drawings, etc.
EngNotes
Kabupaten engineer and TF inspection notes to file
InspForm
Final sub-project inspection report, in file and fully completed
Drawing
As-built drawing
QualFac
Quality of technical facilitation
FreqVisit
Frequency of TF site visits (number of visits)
ConstrPer
Construction period (in months)
Env
Environmental Practices (site inspection confirms appropriate...), assessment
Land
Land Acquisition (site inspection confirms appropriate...), assessment
Social
Social Safegaurds (site inspection confirms appropriate...), assessment
LengthTrans
Transmission pipe (length), in m
DiameterTrans
Transmission pipe (diameter), in cm
PlasticTrans
Transmission pipe (contains plastic)
SteelTrans
Transmission pipe (contains steel)
LengthDistr
Distribution pipe (length), in m
DiameterDistr
Distribution pipe (diameter), in cm
PlasticDistr
Distribution pipe (contains plastic)
SteelDistr
Distribution pipe (contains steel)
Budget
Pipe Supply and Installation Costs (budget), in IDR
Actual
Pipe Supply and Installation Costs (actual), in IDR
StandardPlastic
Plastic Pipe Cost (standard unit, from Kabupaten records), in IDR / meter
StandardSteel
Steel Pipe Cost (standard unit, from Kabupaten records), in IDR / meter
PerfRepairs
Major repairs or rehabilitation performed
ReqRepairs
Major repairs or rehabilitation required
EnvDam
Cause of Damage, environmental
DesDam
Cause of Damage, poor design
ConstrDam
Cause of Damage, poor construction
MatDam
Cause of Damage, materials
OMDam
Cause of Damage, poor operations & maintanence
CostRepair
Repair Costs (actual)
CostEst
Repair Costs (estimated)
Repair
Repair performed by
Date
Repair date
Maintain_1
Routine Maintenance (resevoir cleaning)
Maintain_2
Routine Maintenance (pipe repair)
Maintain_3
Routine Maintenance (valve exercising)
Maintain_4
Routine Maintenance (mechanical repair)
Maintain_5
Routine Maintenance (filter bed replacement)
Maintain_6
Routine Maintenance (painting)
Maintain_7
Routine Maintenance (drainage)
Maintain_8
Routine Maintenance (parts are easily available)
Plan
Operation and Maintanence Plan (has a multi-year plan)
Link
Operation and Maintanence Plan (linked to line ministries)
Division
Operation and Maintanence Plan (has clear division of responsibilities and costs
CostsRoutine
Operation and Maintanence Plan (contains estimated costs, routine)
CostsCapital
Operation and Maintanence Plan (contains estimated costs, capital repairs)
Place
Operation and Maintanence Committee (in place and functioning)
Fee
Operation and Maintanence Committee (user fee in place)
Services
Operation and Maintanence Committee (user fee for specified services)
Contributions
Operation and Maintanence Committee (contributions from other sources)
Current
Operation and Maintanence Committee (current funds within operation and maintane
Afford
Operation and Maintanence Committee (affordibility of user fees)
Inputs
Operation and Maintanence Committee (government inputs to schools and medical cl
CommInput
Operation and Maintanence Committee (labor and material input from community)
GovInput
Operation and Maintanence Committee (labor and material input from government)
Training
Operation and Maintanence Training (O&M training received)
Ongoing
Operation and Maintanence Training (ongoing capacity development)
BudgetTrain
Operation and Maintanence Training (annual training budget)
Flood
Climate Resiliency (safe from flooding)
Eros
Climate Resiliency (erosion protection measures are sufficient)
Landslide
Climate Resiliency (low landslide risk; no steep slopes)
Fire
Climate Resiliency (low forest fire risk; clear area between building and forest
IssueDesign_1
Issue Design (lack of construction details/elevations on dwg)
IssueDesign_2
Issue Design (inaccurate drawings of pipe network)
IssueDesign_3
Issue Design (improper steel reinforcement design)
IssueDesign_4
Issue Design (constructed dimensions differ from plan)
IssueLayout_1
Issue Layout (poor site selection for infrastructure)
IssueLayout_2
Issue Layout (erosion protection around catchment facilities)
IssueLayout_3
Issue Layout (fence around catchment facilities)
IssueLayout_4
Issue Layout (watershed protection)
IssueSteel_1
Issue Steel Reinforcement (short development length in steel reinforcing)
IssueSteel_2
Issue Steel Reinforcement (improperly bent reinforcing cage stirrup bars)
IssueSteel_3
Issue Steel Reinforcement (lack of tie bar wiring)
IssueConcrete_1
Issue Concrete (absence of concrete mix design)
IssueConcrete_2
Issue Concrete (honeycombing in concrete)
IssueConcrete_3
Issue Concrete (exposed/shallow reinforcing steel)
IssueConcrete_4
Issue Concrete (improper materials or poorly mixed concrete)
IssueResevoir_1
Issue Resevoir (no cleanout/overflow)
IssueResevoir_2
Issue Resevoir (improper lid/no lock)
IssueResevoir_3
Issue Resevoir (valve box issues)
IssueResevoir_4
Issue Resevoir (ease of maintenance (steel rungs, etc.))
IssuePipe_1
Issue Pipe Network (pipes are not buried)
IssuePipe_2
Issue Pipe Network (poor pipe connections)
IssuePipe_3
Issue Pipe Network (lack of/inappropriate pipe support)
IssueMisc_1
Issue Miscellaneous (mechanical fixtures broken/leaking)
IssueMisc_2
Issue Miscellaneous (tapstand floor not sloped)
IssueMisc_3
Issue Miscellaneous (poor drainage around public areas)
IssueMisc_4
Issue Miscellaneous (concrete floor poorly constructed)
IssueMisc_5
Issue Miscellaneous (roof needed over water source)
Priority
Did the process of infrastructure prioritization within the village follow Villa
Procure
Did the procurement process (either swakelola or contractor) follow all laws and
Participate
How many persons have been participating in these meetings and how effective are
Women
Women's participation in prioritization, procurement and community meetings
Total: 122
Back to Catalog