Home
Microdata Catalog
Citations
Login
Login
Home
/
Central Data Catalog
/
IDN_2018_TEIBVF_V01_M
Village Law: Technical Evaluation of Infrastructure Built with Village Funds 2018
Indonesia
,
2018
Get Microdata
Reference ID
IDN_2018_TEIBVF_v01_M
Producer(s)
World Bank
Metadata
DDI/XML
JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
8633
Downloads
204
Study Description
Data Dictionary
Downloads
Get Microdata
Data files
BPS_FT_(0-7)_A_public
BPS_FT_(0-7)_B_public
BPS_FT_(0-7)_C_public
BPS_FT_(0-7)_D_public
BPS_FT_(0-7)_E_public
Data file: BPS_FT_(0-7)_D_public
VILLAGE LAW 2018 TECHNICAL EVALUATION
Infrastructure Type D – ROAD, DRAINAGE and RETAINING WALL
Cases:
94
Variables:
245
Variables
kodedesa
BPS unique village code
infra_type
Type of infrastructure
infra_VID
Village level identifying infrastructure number
infra_ID
Unique infrastructure number
yr_constr
Year of infrastructure construction
type_constr
Type of infrastructure construction
constr_modality
Modality of infrastructure construction
num_hh
Number of households benefitting from infrastructure construction
num_benef
Number of beneficiaries benefitting from infrastructure construction
remote
Remote/not remote status of infrastructure construction location, by village
date_inspect
Date of infrastructure construction inspection
A_Seg_1
Cross Section (crown/camber), % of road segment 0-100 m
A_Seg_2
Inadequate roadside ditches, % of road segment 0-100 m
A_Seg_3
Missing drainage structures, # from road segment 0-100 m
A_Seg_4
Improper construction materials, % of road segment 0-100 m
A_Seg_5
Slippery when wet, % of road segment 0-100 m
A_Seg_6
Very muddy during rainy season, % of road segment 0-100 m
A_Seg_7
Unstable slope above (too steep), % of road segment 0-100 m
A_Seg_8
Unstable slope below (too steep), % of road segment 0-100 m
A_Seg_9
Narrow width, % of road segment 0-100 m
A_Seg_10
Surface below standard, % of road segment 0-100 m
A_Seg_11
Low shoulder, % of road segment 0-100 m
A_Seg_12
Safety concerns, # from road segment 0-100 m
B_Seg_1
Cross Section (crown/camber), % of road segment 100-200 m
B_Seg_2
Inadequate roadside ditches, % of road segment 100-200 m
B_Seg_3
Missing drainage structures, # from of road segment 100-200 m
B_Seg_4
Improper construction materials, % of road segment 100-200 m
B_Seg_5
Slippery when wet, % of road segment 100-200 m
B_Seg_6
Very muddy during rainy season, % of road segment 100-200 m
B_Seg_7
Unstable slope above (too steep), % of road segment 100-200 m
B_Seg_8
Unstable slope below (too steep), % of road segment 100-200 m
B_Seg_9
Narrow width, % of road segment 100-200 m
B_Seg_10
Surface below standard, % of road segment 100-200 m
B_Seg_11
Low shoulder, % of road segment 100-200 m
B_Seg_12
Safety concerns, # from road segment 100-200 m
C_Seg_1
Cross Section (crown/camber), % of road segment 200-300 m
C_Seg_2
Inadequate roadside ditches, % of road segment 200-300 m
C_Seg_3
Missing drainage structures, # from road segment 200-300 m
C_Seg_4
Improper construction materials, % of road segment 200-300 m
C_Seg_5
Slippery when wet, % of road segment 200-300 m
C_Seg_6
Very muddy during rainy season, % of road segment 200-300 m
C_Seg_7
Unstable slope above (too steep), % of road segment 200-300 m
C_Seg_8
Unstable slope below (too steep), % of road segment 200-300 m
C_Seg_9
Narrow width, % of road segment 200-300 m
C_Seg_10
Surface below standard, % of road segment 200-300 m
C_Seg_11
Low shoulder, % of road segment 200-300 m
C_Seg_12
Safety concerns, # from road segment 200-300 m
D_Seg_1
Cross Section (crown/camber), % of road segment 300-400 m
D_Seg_2
Inadequate roadside ditches, % of road segment 300-400 m
D_Seg_3
Missing drainage structures, # from road segment 300-400 m
D_Seg_4
Improper construction materials, % of road segment 300-400 m
D_Seg_5
Slippery when wet, % of road segment 300-400 m
D_Seg_6
Very muddy during rainy season, % of road segment 300-400 m
D_Seg_7
Unstable slope above (too steep), % of road segment 300-400 m
D_Seg_8
Unstable slope below (too steep), % of road segment 300-400 m
D_Seg_9
Narrow width, % of road segment 300-400 m
D_Seg_10
Surface below standard, % of road segment 300-400 m
D_Seg_11
Low shoulder, % of road segment 300-400 m
D_Seg_12
Safety concerns, # from road segment 300-400 m
E_Seg_1
Cross Section (crown/camber), % of road segment 400-500 m
E_Seg_2
Inadequate roadside ditches, % of road segment 400-500 m
E_Seg_3
Missing drainage structure, # from road segment 400-500 m
E_Seg_4
Improper construction materials, % of road segment 400-500 m
E_Seg_5
Slippery when wet, % of road segment 400-500 m
E_Seg_6
Very muddy during rainy season, % of road segment 400-500 m
E_Seg_7
Unstable slope above (too steep), % of road segment 400-500 m
E_Seg_8
Unstable slope below (too steep), % of road segment 400-500 m
E_Seg_9
Narrow width, % of road segment 400-500 m
E_Seg_10
Surface below standard, % of road segment 400-500 m
E_Seg_11
Low shoulder, % of road segment 400-500 m
E_Seg_12
Safety concerns, # from road segment 400-500 m
F_Seg_1
Cross Section (crown/camber), % of road segment 500-600 m
F_Seg_2
Inadequate roadside ditches, % of road segment 500-600 m
F_Seg_3
Missing drainage structures, # from road segment 500-600 m
F_Seg_4
Improper construction materials, % of road segment 500-600 m
F_Seg_5
Slippery when wet, % of road segment 500-600 m
F_Seg_6
Very muddy during rainy season, % of road segment 500-600 m
F_Seg_7
Unstable slope above (too steep), % of road segment 500-600 m
F_Seg_8
Unstable slope below (too steep), % of road segment 500-600 m
F_Seg_9
Narrow width, % of road segment 500-600 m
F_Seg_10
Surface below standard, % of road segment 500-600 m
F_Seg_11
Low shoulder, % of road segment 500-600 m
F_Seg_12
Safety concerns, # from road segment 500-600 m
G_Seg_1
Cross Section (crown/camber), % of road segment 600-700 m
G_Seg_2
Inadequate roadside ditches, % of road segment 600-700 m
G_Seg_3
Missing drainage structures, # from road segment 600-700 m
G_Seg_4
Improper construction materials, % of road segment 600-700 m
G_Seg_5
Slippery when wet, % of road segment 600-700 m
G_Seg_6
Very muddy during rainy season, % of road segment 600-700 m
G_Seg_7
Unstable slope above (too steep), % of road segment 600-700 m
G_Seg_8
Unstable slope below (too steep), % of road segment 600-700 m
G_Seg_9
Narrow width, % of road segment 600-700 m
G_Seg_10
Surface below standard, % of road segment 600-700 m
G_Seg_11
Low shoulder, % of road segment 600-700 m
G_Seg_12
Safety concerns, # from road segment 600-700 m
H_Seg_1
Cross Section (crown/camber), % of road segment 700-800 m
H_Seg_2
Inadequate roadside ditches, % of road segment 700-800 m
H_Seg_3
Missing drainage structures, # from road segment 700-800 m
H_Seg_4
Improper construction materials, % of road segment 700-800 m
H_Seg_5
Slippery when wet, % of road segment 700-800 m
H_Seg_6
Very muddy during rainy season, % of road segment 700-800 m
H_Seg_7
Unstable slope above (too steep), % of road segment 700-800 m
H_Seg_8
Unstable slope below (too steep), % of road segment 700-800 m
H_Seg_9
Narrow width, % of road segment 700-800 m
H_Seg_10
Surface below standard, % of road segment 700-800 m
H_Seg_11
Low shoulder, % of road segment 700-800 m
H_Seg_12
Safety concerns, # from road segment 700-800 m
I_Seg_1
Cross Section (crown/camber), % of road segment 800-900 m
I_Seg_2
Inadequate roadside ditches, % of road segment 800-900 m
I_Seg_3
Missing drainage structures, # from road segment 800-900 m
I_Seg_4
Improper construction materials, % of road segment 800-900 m
I_Seg_5
Slippery when wet, % of road segment 800-900 m
I_Seg_6
Very muddy during rainy season, % of road segment 800-900 m
I_Seg_7
Unstable slope above (too steep), % of road segment 800-900 m
I_Seg_8
Unstable slope below (too steep), % of road segment 800-900 m
I_Seg_9
Narrow width, % of road segment 800-900 m
I_Seg_10
Surface below standard, % of road segment 800-900 m
I_Seg_11
Low shoulder, % of road segment 800-900 m
I_Seg_12
Safety concerns, # from road segment 800-900 m
J_Seg_1
Cross Section (crown/camber), % of road segment 900-1,000 m
J_Seg_2
Inadequate roadside ditches, % of road segment 900-1,000 m
J_Seg_3
Missing drainage structures, # from road segment 900-1,000 m
J_Seg_4
Improper construction materials, % of road segment 900-1,000 m
J_Seg_5
Slippery when wet, % of road segment 900-1,000 m
J_Seg_6
Very muddy during rainy season, % of road segment 900-1,000 m
J_Seg_7
Unstable slope above (too steep), % of road segment 900-1,000 m
J_Seg_8
Unstable slope below (too steep), % of road segment 900-1,000 m
J_Seg_9
Narrow width, % of road segment 900-1,000 m
J_Seg_10
Surface below standard, % of road segment 900-1,000 m
J_Seg_11
Low shoulder, % of road segment 900-1,000 m
J_Seg_12
Safety concerns, # from road segment 900-1,000 m
Structure
Retaining Wall (structural integrity), evaluation result
Holes
Retaining Wall (weep holes), evaluation result
Eros
Retaining Wall (erosion protection), evaluation result
ConstrTechWall
Retaining Wall (construction techniques), evaluation result
Dimensions
Retaining Wall (dimensions), evaluation result
LayoutCulvert
Culvert (layout), evaluation result
ConstrTechCulvert
Culvert (construction techniques), evaluation result
LayoutBridge
Small Bridge (layout), evaluation result
ConstrTechBridge
Small Bridge (construction techniques), evaluation result
OpMain
Operation and maintenance, evaluation result
Constr
Construction quality, assessment
DesignCom
Design completeness, assessment
Funct
Functionality, assessment
Design
Adequacy of design consultation with users
File
File completeness (meeting notes, land donation records, design drawings, etc.
EngNotes
Kabupaten engineer and TF inspection notes to file
InspForm
Final sub-project inspection report, in file and fully completed
Drawing
As-built drawing
QualFac
Quality of technical facilitation
FreqVisit
Frequency of TF site visits (number of visits)
ConstrPer
Construction period (in months)
Env
Environmental Practices (site inspection confirms appropriate...), assessment
Land
Land Acquisition (site inspection confirms appropriate...), assessment
Social
Social Safegaurds (site inspection confirms appropriate...), assessment
Length
Road (length), in m
Width
Road (width), in m
Earth
Road Material (contains earth)
Gravel
Road Material (contains gravel)
Concrete
Road Material (contains concrete)
Asphalt
Road Material (contains asphalt)
LengthCulvert
Drainage Culvert (length), spot improvements in m
WidthCulvert
Drainage Culvert (width), spot improvements in m
DiameterCulvert
Drainage Culvert (diameter), spot improvements in m
LengthChannel
Drainage Channel (length), spot improvements in m
WidthChannel
Drainage Channel (width), spot improvements in m
LengthWall
Retaining Wall (length), spot improvements in m
HeightWall
Retaining Wall (height), spot improvements in m
BudgetRoad
Road Installation Cost (budget), in IDR
ActualRoad
Road Installation Cost (actual), in IDR / square meter
StandardRoad
Road Installation Cost (standard unit, from Kabupaten records), in IDR / square
BudgetDrain
Drainage Installation Cost (budget), in IDR
ActualDrain
Drainage Installation Cost (actual), in IDR / meter
StandardDrain
Drainage Installation Cost (standard unit, from Kabupaten records), in IDR / met
BudgetWall
Wall Installation Cost (budget), in IDR
ActualWall
Wall Installation Cost (actual), in IDR / meter
StandardWall
Wall Installation Cost (standard unit, from Kabupaten records), in IDR / meter
PerfRepairs
Major repairs or rehabilitation performed
ReqRepairs
Major repairs or rehabilitation required
EnvDam
Cause of Damage, environmental
DesDam
Cause of Damage, poor design
ConstrDam
Cause of Damage, poor construction
MatDam
Cause of Damage, materials
OMDam
Cause of Damage, poor operations & maintanence
CostRepair
Repair Costs (actual)
CostEst
Repair Costs (estimated)
Repair
Repair performed by
Date
Repair date
Maintain_1
Routine Maintenance (pot hole / surface repair)
Maintain_2
Routine Maintenance (erosion control of shoulders)
Maintain_3
Routine Maintenance (erosion control of slopes)
Maintain_4
Routine Maintenance (drainage)
Maintain_5
Routine Maintenance (signs)
Maintain_6
Routine Maintenance (minor repair to culverts / walls)
Maintain_7
Routine Maintenance (regrading and re-gravelling)
Maintain_8
Routine Maintenance (repair scour checks)
Maintain_9
Maintain_9
Plan
Operation and Maintanence Plan (has a multi-year plan)
Link
Operation and Maintanence Plan (linked to line ministries)
Division
Operation and Maintanence Plan (has clear division of responsibilities and costs
CostsRoutine
Operation and Maintanence Plan (contains estimated costs, routine)
CostsCapital
Operation and Maintanence Plan (contains estimated costs, capital repairs)
Place
Operation and Maintanence Committee (in place and functioning)
Fee
Operation and Maintanence Committee (user fee in place)
Services
Operation and Maintanence Committee (user fee for specified services)
Contributions
Operation and Maintanence Committee (contributions from other sources)
Current
Operation and Maintanence Committee (current funds within operation and maintane
Afford
Operation and Maintanence Committee (affordibility of user fees)
Inputs
Operation and Maintanence Committee (government inputs to schools and medical cl
CommInput
Operation and Maintanence Committee (labor and material input from community)
GovInput
Operation and Maintanence Committee (labor and material input from government)
Training
Operation and Maintanence Training (O&M training received)
Ongoing
Operation and Maintanence Training (ongoing capacity development)
BudgetTrain
Operation and Maintanence Training (annual training budget)
Flood
Climate Resiliency (safe from flooding)
ErosFT4
Climate Resiliency (erosion protection measures are sufficient)
Landslide
Climate Resiliency (low landslide risk; no steep slopes)
Fire
Climate Resiliency (low forest fire risk; clear area between building and forest
IssueDesign_1
Issue Design (lack of construction details on drawings)
IssueDesign_2
Issue Design (lack of accurate measurements on drwg)
IssueDesign_3
Issue Design (improper cross section)
IssueDesign_4
Issue Design (drainage considerations)
IssueConstr_1
Issue Construction (improper materials)
IssueConstr_2
Issue Construction (lack of compaction)
IssuePipe_1
Issue Pipe, Culver and Channel (dimensions/layout)
IssuePipe_2
Issue Pipe, Culver and Channel (improperly buried)
IssuePipe_3
Issue Pipe, Culver and Channel (erosion protection)
IssueSteel_1
Issue Steel Reinforcement (short development length in steel reinforcing)
IssueSteel_2
Issue Steel Reinforcement (improperly bent reinforcing cage stirrup bars)
IssueSteel_3
Issue Steel Reinforcement (lack of tie bar wiring)
IssueConcrete_1
Issue Concrete (absence of concrete mix design)
IssueConcrete_2
Issue Concrete (honeycombing in concrete)
IssueConcrete_3
Issue Concrete (exposed/shallow reinforcing steel)
IssueConcrete_4
Issue Concrete (improper materials or poorly mixed concrete)
IssueWall_1
Issue Wall (foundation/structural integrity)
IssueWall_2
Issue Wall (batter)
IssueWall_3
Issue Wall (wep holes)
IssueWall_4
Issue Wall (poor drainage at foot of wall)
IssueWall_5
Issue Wall (finishing)
IssueSlope_1
Issue Slopes (fill slope - 1 vert.:4 horiz. max)
IssueSlope_2
Issue Slopes (cut slope - 1 vert.:2 horiz. max)
Priority
Did the process of infrastructure prioritization within the village follow Villa
Procure
Did the procurement process (either swakelola or contractor) follow all laws and
Participate
How many persons have been participating in these meetings and how effective are
Women
Women's participation in prioritization, procurement and community meetings
Total: 245
Back to Catalog