IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ZMB_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Zambia, 2019 - 2020
Get Microdata
Reference ID
ZMB_2019_ES_v01_M
Producer(s)
The World Bank (WB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8021
Downloads
190
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • zambia_2019_full_data.dta

Main Reason To Operate Below Establishment's Full Capacity (ZAMf1)

Data file: zambia_2019_full_data.dta

Overview

Valid: 150
Invalid: 451
Minimum: -9
Maximum: 8
Type: Discrete
Decimal: 0
Start: 1881
End: 1882
Width: 2
Range: -9 - 8
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 22
Literal question
Which of the following constitute the main reason for this establishment to operate below its full capacity?
Categories
Value Category Cases
-9 Don't know (spontaneous) 9
6%
1 Lack of demand for its products 25
16.7%
2 Unavailability of inputs 10
6.7%
3 Obsolete machinery equipment 10
6.7%
4 Lack of financing mechanisms for working capital 24
16%
5 Lack of financing mechanisms for investment 11
7.3%
6 Excessive abundance of cheap imports 15
10%
7 Failure in electricity supply 45
30%
8 Lack of skilled labor force 1
0.7%
9 Limited availability of transport and storage 0
0%
Sysmiss 451
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.