IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
230776
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Identification
  • Version
  • Scope
  • Coverage
  • Producers and sponsors
  • Sampling
  • Survey instrument
  • Data collection
  • Depositor information
  • Data Access
  • Disclaimer and copyrights
  • Contacts
  • Metadata production
  • Identification

    Survey ID number

    RWA_2012-2016_LWHIE-BL-F2_v01_M

    Title

    Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016

    Subtitle

    Baseline, First Follow-up and Second Follow-up Surveys

    Country
    Name Country code
    Rwanda RWA
    Study type

    Agricultural Survey [ag/oth]

    Abstract

    Agriculture is a major engine of the Rwandan economy and remains a priority sector in the Government of Rwanda's goals of reducing poverty and achieving food security through commercialized agriculture. Sustainable improvements to agricultural productivity is the only way to achieve this target, calling for investments in participatory land management, water harvesting and intensified irrigation of the hillsides. The Land Husbandry, Water Harvesting and Hillside Irrigation (LWH) project has been working to meet these goals.

    Evaluating the overall impact of LWH is important to allow Ministry of Agriculture and Animal Resources (MINAGRIs) to effectively plan for its future activities. LWH covers a relatively small area of 30,250 ha, eventually affecting approximately 20 watersheds. From the perspective of MINAGRI, LWH can be seen as a pilot program for comprehensive agricultural overhaul. LWH includes major infrastructure investments such as hillside terracing, irrigation dams, and post-harvest storage. The project aims to operationalize MINAGRIs strategy to encourage mono cropping of cash crops, as opposed to the traditional system of inter-cropping for household consumption.

    LWH has been rolled out in three phases: implementation in the four Phase 1A sites began in 2010, in the three Phase 1B sites in 2012, and in the Phase 1C sites in late 2013.

    There have been five surveys for this project including baselines and four follow-ups. There were two sample groups: 1B and 1C. For the 1B sample group, the baseline was conducted in 2012, and follow-up surveys in 2013, 2014, and 2016. For the 1C sample, the baseline was implemented in 2014, and a follow-up in 2016.

    The data files documented here are from the baseline, the first follow-up, and the second follow-up surveys.

    The datasets from the third and the fourth follow-up surveys are also published in the Microdata Library with the following study IDs:

    1. The third follow-up: RWA_2014_LWHIE-F3_v01_M
    2. The fourth follow-up: RWA_2016_LWHIE-F4_v01_M
    Kind of Data

    Sample survey data [ssd]

    Unit of Analysis

    Household

    Version

    Version Description

    v01
    The data files are from the baseline, the first follow-up, and the second follow-up surveys.

    The datasets from the third and the fourth follow-up surveys are also published in the Microdata Library with the following study IDs:

    1. The third follow-up: RWA_2014_LWHIE-F3_v01_M
    2. The fourth follow-up: RWA_2016_LWHIE-F4_v01_M

    Scope

    Notes

    The scope of the study includes:

    • Access to various forms of extension services
    • Adoption of agricultural technologies and improved farming methods
    • Use of irrigation
    • Crop cultivation decisions
    • Total harvests
    • Expenditure on inputs
    • Total sales
    • Non-farm income
    • Food consumption and security
    • Usage of services from formal financial institutions

    Coverage

    Geographic Coverage

    The study covers six sites the Eastern and North Eastern regions of the country: Nyamuziga, Gicumbi, Muyanza, Cyonyonyo, Rwamagana and Kayonza.

    Producers and sponsors

    Primary investigators
    Name Affiliation
    Florence Kondylis The World Bank
    Maria Jones The World Bank
    Saahil Karpe The World Bank
    Funding Agency/Sponsor
    Name
    Global Agriculture Food Security Program

    Sampling

    Sampling Procedure

    There were two baseline surveys, one for the 1B sample group and another for the 1C sample group.

    1B sample:
    A baseline survey was implemented in three 1B LWH project sites. Rwamagana-34, Rwamagana-35 and Kayonza-4, and three control sites were selected by pairwise-matching. The sample was designed to meet three criteria: geographic representation at the site-level, inclusion of multiple members of farmer groups within sites, and sufficient size to power tests of variations in treatment within the Phase 1B sites.

    To meet these criteria, sampling was done through a two-stage process. In the first stage, researchers randomly sampled "seed" households, stratified by village. The total number of "seed" households varied by treatment status. For treatment sites, the number of "seeds" depended on the estimated number of Self-help Group (SHG), calculated based on the site population and the typical size of SHGs, which is 20 households. For control sites, the number of "seeds" was set at 25, which provided sufficient power for the measurement of overall project impact.

    In the second stage, researchers asked each "seed" farmer to list four "plot neighbors", i.e. people who have contiguous or near-contiguous plots to his own. These four people were added to the survey sample, and the five respondents together constitute a synthetic SHG. Since the SHGs are formed based on proximity of agricultural land, households in synthetic SHGs are likely to be assigned into a single farmer group. Comparison sites were elected using pair-wise matching, from a list of sites considered eligible to receive LWH but that will not receive the project.

    1C sample:
    A baseline survey was implemented in four 1C LWH project sites. The LWH Project works at a site level (the valley and surrounding hills chosen for the intervention). The LWH project implemented different activities at different areas within the site: Command Area, Command Area Catchment, and Water Catchment areas. Because Phase 1C site Gicumbi was only receiving land husbandry interventions, the sample was taken only from the Water Catchment area of the site. At Muyanza site, the full portfolio of LWH interventions to be implemented, as reflected in the sampling across the different areas. Comparison sites were selected using pair-wise matching, from a list of sites considered eligible for the LWH project but not to receive the project. Extensive data was recorded for the sites considered eligible for the project, including data on geography, weather and land use patterns, making the identification of such matching sites possible.

    Survey instrument

    Questionnaires

    The baseline household survey used a multi-module questionnaire, with a specific focus on agricultural production, access to agricultural extension services, rural finance, and food security. In addition, the questionnaire contains modules on housing, labor, education, health, income and household assets.

    Data collection

    Dates of Data Collection
    Start End Cycle
    2012 2012 Baseline for sample group 1B
    2013 2013 Follow-up 1 and 2 for sample group 1B
    2014 2014 Follow-up 3 for sample group 1B
    2016 2016 Follow-up 4 for sample group 1B
    2014 2014 Baseline for sample group 1C
    2016 2016 Follow-up for sample group 1C
    Mode of data collection
    • Computer Assisted Personal Interview [capi]
    Data Collection Notes

    Baseline survey fieldwork for 1B sample group started on May 24, 2012 and continued through August 20. The field team included 20 enumerators, 4 supervisors, and 1 editor. All questionnaires were double-entered by a team of 12 data entry clerks and 1 data entry manager, with the first entry occurring in the field concurrent to data collection. First and second entries were compared and all discrepancies corrected through manual checks of the hard-copy questionnaires. In some cases, the field team was sent back to the field for verification.

    Depositor information

    Depositor
    Name Affiliation
    Sakina Shibuya World Bank

    Data Access

    Citation requirements

    The use of the datasets must be acknowledged using a citation which would include:

    • the identification of the Primary Investigator (including country name);
    • the full title of the survey and its acronym (when available), and the year(s) of implementation;
    • the survey reference number;
    • the source and date of download (for datasets disseminated online).

    Example:

    Florence Kondylis, Maria Jones, Saahil Karpe, World Bank. Rwanda Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys, Ref. RWA_2012-2016_LWHIE-BL-F2_v01_M. Dataset downloaded from [URL] on [date].

    Disclaimer and copyrights

    Disclaimer

    The user of the data acknowledges that the original collector of the data, the authorized distributor of the data, and the relevant funding agency bear no responsibility for use of the data or for interpretations or inferences based upon such uses.

    Contacts

    Contacts
    Name Affiliation Email
    Florence Kondylis The World Bank fkondylis@worldbank.org
    Maria Jones The World Bank mjones5@worldbank.org
    Saahil Karpe The World Bank skarpe@worldbank.org

    Metadata production

    DDI Document ID

    DDI_RWA_2012-2016_LWHIE-BL-F2_v01_M_WB

    Producers
    Name Affiliation Role
    Development Data Group World Bank Preparing of DDI
    Development Impact Evaluation World Bank Preparing of metadata
    Date of Metadata Production

    2017-09-28

    Metadata version

    DDI Document version

    v01 (September 2017)

    Back to Catalog
    IHSN Survey Catalog

    © IHSN Survey Catalog, All Rights Reserved.