IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
230693
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.4.3 - How much [INPUT] (kg) did you apply on PLOT 1? (d43_a_4)

Data file: lwh_baseline1b

Overview

Valid: 251
Invalid: 1711
Type: Discrete
Decimal: 0
Start: 10866
End: 10872
Width: 7
Range: -888888 - 400
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-888888 Doesn't Know 0
0%
1 6
2.4%
1.5 1
0.4%
2 13
5.2%
3 11
4.4%
4 8
3.2%
5 27
10.8%
6 6
2.4%
6.19999980926514 1
0.4%
7 6
2.4%
7.5 1
0.4%
8 7
2.8%
10 28
11.2%
12 5
2%
12.5 11
4.4%
13 2
0.8%
15 15
6%
18 1
0.4%
20 8
3.2%
25 75
29.9%
35 1
0.4%
40 1
0.4%
50 16
6.4%
400 1
0.4%
Sysmiss 1711
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.