IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
230495
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.4.3 - How much [INPUT] (kg) did you apply on PLOT 3? (d43_c_3)

Data file: lwh_baseline1b

Overview

Valid: 177
Invalid: 1785
Type: Discrete
Decimal: 0
Start: 11479
End: 11485
Width: 7
Range: -888888 - 400
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-888888 Doesn't Know 0
0%
0.200000002980232 1
0.6%
1 7
4%
2 3
1.7%
2.5 1
0.6%
3 11
6.2%
4 3
1.7%
5 11
6.2%
6 5
2.8%
6.5 1
0.6%
7.5 1
0.6%
8 4
2.3%
9 1
0.6%
10 18
10.2%
12 5
2.8%
12.5 1
0.6%
13 1
0.6%
15 10
5.6%
17 1
0.6%
18 2
1.1%
20 12
6.8%
25 18
10.2%
30 13
7.3%
40 5
2.8%
46 1
0.6%
48 1
0.6%
50 31
17.5%
75 1
0.6%
100 4
2.3%
150 1
0.6%
300 2
1.1%
400 1
0.6%
Sysmiss 1785
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.