IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
230653
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.5.5 - For how many days in total, did the paid labor do land preparation on th (d55_1)

Data file: lwh_baseline1b

Overview

Valid: 501
Invalid: 1461
Type: Discrete
Decimal: 0
Start: 11642
End: 11644
Width: 3
Range: -88 - 360
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-88 Doesn't Know 0
0%
1 13
2.6%
2 41
8.2%
3 55
11%
4 48
9.6%
5 45
9%
6 35
7%
7 25
5%
8 14
2.8%
9 12
2.4%
10 44
8.8%
11 4
0.8%
12 16
3.2%
13 3
0.6%
14 13
2.6%
15 20
4%
16 4
0.8%
17 1
0.2%
18 3
0.6%
19 1
0.2%
20 14
2.8%
21 9
1.8%
22 6
1.2%
23 1
0.2%
24 9
1.8%
25 3
0.6%
27 1
0.2%
28 3
0.6%
29 2
0.4%
30 14
2.8%
31 2
0.4%
32 1
0.2%
36 2
0.4%
40 4
0.8%
42 3
0.6%
44 1
0.2%
45 1
0.2%
50 6
1.2%
51 1
0.2%
56 1
0.2%
60 5
1%
62 1
0.2%
67 1
0.2%
68 1
0.2%
69 1
0.2%
72 2
0.4%
81 1
0.2%
94 1
0.2%
105 1
0.2%
120 1
0.2%
128 1
0.2%
208 1
0.2%
250 1
0.2%
285 1
0.2%
360 1
0.2%
Sysmiss 1461
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.