IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
230749
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.5.5 - For how many days in total, did the paid labor do land preparation on th (d55_2)

Data file: lwh_baseline1b

Overview

Valid: 452
Invalid: 1510
Type: Discrete
Decimal: 0
Start: 11645
End: 11647
Width: 3
Range: -88 - 360
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-88 Doesn't Know 0
0%
1 13
2.9%
2 34
7.5%
3 46
10.2%
4 38
8.4%
5 43
9.5%
6 26
5.8%
7 31
6.9%
8 19
4.2%
9 12
2.7%
10 37
8.2%
11 5
1.1%
12 24
5.3%
13 2
0.4%
14 14
3.1%
15 13
2.9%
16 2
0.4%
17 6
1.3%
18 6
1.3%
20 11
2.4%
21 6
1.3%
22 2
0.4%
23 2
0.4%
24 4
0.9%
25 3
0.7%
26 4
0.9%
27 1
0.2%
28 1
0.2%
29 1
0.2%
30 12
2.7%
35 1
0.2%
36 3
0.7%
38 1
0.2%
40 4
0.9%
41 1
0.2%
42 1
0.2%
45 1
0.2%
48 2
0.4%
50 3
0.7%
56 2
0.4%
57 1
0.2%
58 1
0.2%
60 3
0.7%
61 1
0.2%
65 1
0.2%
66 1
0.2%
80 2
0.4%
90 1
0.2%
100 1
0.2%
120 1
0.2%
357 1
0.2%
360 1
0.2%
Sysmiss 1510
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.