IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
231296
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.8.4 - How much [CROP] (kg) did you store in this post-harvest infra-structure? (d84_3)

Data file: lwh_baseline1b

Overview

Valid: 200
Invalid: 1762
Type: Discrete
Decimal: 0
Start: 12349
End: 12355
Width: 7
Range: -888888 - 300
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-888888 Doesn't Know 0
0%
0 1
0.5%
1 2
1%
1.5 1
0.5%
2 14
7%
3 10
5%
4 6
3%
5 18
9%
6 1
0.5%
7 1
0.5%
7.5 2
1%
8 2
1%
9 1
0.5%
10 25
12.5%
11 1
0.5%
12 3
1.5%
13 1
0.5%
15 8
4%
17 1
0.5%
18 2
1%
20 31
15.5%
21 1
0.5%
22 1
0.5%
23 1
0.5%
24 1
0.5%
25 7
3.5%
26 1
0.5%
30 20
10%
35 2
1%
37.5 1
0.5%
40 7
3.5%
49.5 1
0.5%
50 8
4%
60 1
0.5%
65 4
2%
70 1
0.5%
80 4
2%
95 1
0.5%
100 4
2%
180 1
0.5%
200 1
0.5%
300 1
0.5%
Sysmiss 1762
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.