IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
232561
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.8.18 - How much did that transport cost? (d818_3)

Data file: lwh_baseline1b

Overview

Valid: 130
Invalid: 1832
Type: Discrete
Decimal: 0
Start: 12800
End: 12807
Width: 8
Range: -8888888 - 50000
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-8888888 Doesn't Know 0
0%
-9 2
1.5%
0 103
79.2%
100 1
0.8%
200 2
1.5%
300 1
0.8%
500 3
2.3%
800 1
0.8%
1000 2
1.5%
1200 1
0.8%
1500 1
0.8%
2000 5
3.8%
3000 2
1.5%
4000 2
1.5%
5000 1
0.8%
21000 1
0.8%
40000 1
0.8%
50000 1
0.8%
Sysmiss 1832
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.