IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
261793
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.4.3 - How much [INPUT] (kg) did you apply on PLOT 1? (d43b_1_3)

Data file: lwh_baseline1b

Overview

Valid: 134
Invalid: 1828
Type: Discrete
Decimal: 0
Start: 14916
End: 14922
Width: 7
Range: -888888 - 150
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-888888 Doesn't Know 0
0%
0.200000002980232 1
0.7%
1 8
6%
3 10
7.5%
4 12
9%
5 10
7.5%
6 5
3.7%
7 1
0.7%
8 5
3.7%
10 15
11.2%
12 4
3%
12.5 1
0.7%
14 1
0.7%
15 8
6%
17 1
0.7%
20 14
10.4%
25 14
10.4%
30 2
1.5%
40 3
2.2%
45 1
0.7%
50 13
9.7%
75 1
0.7%
100 2
1.5%
125 1
0.7%
150 1
0.7%
Sysmiss 1828
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.