IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
230784
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.4.5 - How much will you have to repay in the future if the [INPUT] on PLOT 1 w (d45b_1_3)

Data file: lwh_baseline1b

Overview

Valid: 146
Invalid: 1816
Type: Discrete
Decimal: 0
Start: 15008
End: 15015
Width: 8
Range: -8888888 - 75000
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-8888888 Doesn't Know 0
0%
-9 1
0.7%
0 118
80.8%
11 1
0.7%
360 1
0.7%
600 1
0.7%
840 1
0.7%
900 1
0.7%
1000 1
0.7%
1200 1
0.7%
1500 1
0.7%
1680 1
0.7%
2150 1
0.7%
3000 1
0.7%
3600 1
0.7%
5250 1
0.7%
5500 1
0.7%
7000 2
1.4%
7500 1
0.7%
10000 1
0.7%
11000 2
1.4%
12000 1
0.7%
14000 1
0.7%
15000 1
0.7%
21000 1
0.7%
28000 1
0.7%
42000 1
0.7%
75000 1
0.7%
Sysmiss 1816
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.