IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
259263
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.5.3 - For how many days in total, did the unpaid labor do land preparation for (d53b_1)

Data file: lwh_baseline1b

Overview

Valid: 73
Invalid: 1889
Type: Discrete
Decimal: 0
Start: 15674
End: 15675
Width: 2
Range: -8 - 30
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-8 Doesn't Know 0
0%
1 12
16.4%
2 19
26%
3 10
13.7%
4 10
13.7%
5 6
8.2%
7 5
6.8%
10 4
5.5%
11 1
1.4%
12 1
1.4%
20 1
1.4%
24 1
1.4%
25 1
1.4%
30 2
2.7%
Sysmiss 1889
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.