IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
259433
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.5.5 - For how many days in total, did the paid labor do land preparation on th (d55b_1)

Data file: lwh_baseline1b

Overview

Valid: 423
Invalid: 1539
Type: Discrete
Decimal: 0
Start: 15683
End: 15685
Width: 3
Range: -88 - 360
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-88 Doesn't Know 0
0%
1 20
4.7%
2 48
11.3%
3 45
10.6%
4 42
9.9%
5 35
8.3%
6 32
7.6%
7 24
5.7%
8 18
4.3%
9 7
1.7%
10 32
7.6%
11 2
0.5%
12 12
2.8%
13 2
0.5%
14 11
2.6%
15 17
4%
16 4
0.9%
17 1
0.2%
18 7
1.7%
20 15
3.5%
21 5
1.2%
22 5
1.2%
24 4
0.9%
25 2
0.5%
27 1
0.2%
29 1
0.2%
30 10
2.4%
32 2
0.5%
35 1
0.2%
36 3
0.7%
40 1
0.2%
42 2
0.5%
50 2
0.5%
53 1
0.2%
54 1
0.2%
56 1
0.2%
60 2
0.5%
70 2
0.5%
72 1
0.2%
140 1
0.2%
360 1
0.2%
Sysmiss 1539
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.