IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
230933
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.5.5 - For how many days in total, did the paid labor do land preparation on th (d55b_2)

Data file: lwh_baseline1b

Overview

Valid: 383
Invalid: 1579
Type: Discrete
Decimal: 0
Start: 15686
End: 15688
Width: 3
Range: -88 - 360
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-88 Doesn't Know 0
0%
1 20
5.2%
2 44
11.5%
3 43
11.2%
4 46
12%
5 35
9.1%
6 30
7.8%
7 17
4.4%
8 19
5%
9 11
2.9%
10 24
6.3%
11 3
0.8%
12 11
2.9%
14 12
3.1%
15 10
2.6%
16 5
1.3%
17 2
0.5%
18 3
0.8%
20 9
2.3%
21 2
0.5%
22 1
0.3%
23 1
0.3%
24 6
1.6%
27 3
0.8%
28 4
1%
29 1
0.3%
30 6
1.6%
31 1
0.3%
36 3
0.8%
38 1
0.3%
40 1
0.3%
56 1
0.3%
57 1
0.3%
58 1
0.3%
59 1
0.3%
60 2
0.5%
80 1
0.3%
89 1
0.3%
360 1
0.3%
Sysmiss 1579
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.