IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
231706
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.5.5 - For how many days in total, did the paid labor do land preparation on th (d55b_3)

Data file: lwh_baseline1b

Overview

Valid: 211
Invalid: 1751
Type: Discrete
Decimal: 0
Start: 15689
End: 15691
Width: 3
Range: -88 - 540
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-88 Doesn't Know 0
0%
1 16
7.6%
2 26
12.3%
3 25
11.8%
4 25
11.8%
5 18
8.5%
6 21
10%
7 11
5.2%
8 10
4.7%
9 3
1.4%
10 13
6.2%
11 1
0.5%
12 6
2.8%
14 3
1.4%
15 6
2.8%
16 2
0.9%
20 5
2.4%
22 1
0.5%
24 2
0.9%
25 2
0.9%
27 2
0.9%
30 5
2.4%
34 1
0.5%
39 1
0.5%
45 2
0.9%
60 1
0.5%
66 1
0.5%
90 1
0.5%
540 1
0.5%
Sysmiss 1751
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.