IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
259316
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.5.32 - How much in total did you pay hired labor to harvest this [PLOT]? (d532b_1)

Data file: lwh_baseline1b

Overview

Valid: 161
Invalid: 1801
Type: Discrete
Decimal: 0
Start: 15986
End: 15993
Width: 8
Range: -8888888 - 84000
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-8888888 Doesn't Know 0
0%
600 4
2.5%
700 19
11.8%
800 1
0.6%
1000 2
1.2%
1200 9
5.6%
1400 17
10.6%
1800 4
2.5%
2000 3
1.9%
2100 7
4.3%
2400 5
3.1%
2800 16
9.9%
3000 2
1.2%
3200 2
1.2%
3500 7
4.3%
3600 2
1.2%
3700 1
0.6%
4000 7
4.3%
4200 9
5.6%
4500 1
0.6%
4800 1
0.6%
4900 4
2.5%
5000 1
0.6%
5600 3
1.9%
6300 1
0.6%
7000 4
2.5%
7700 1
0.6%
8000 3
1.9%
8400 6
3.7%
9800 2
1.2%
10000 3
1.9%
10500 1
0.6%
12000 1
0.6%
12600 2
1.2%
14000 4
2.5%
14700 1
0.6%
19600 1
0.6%
20300 1
0.6%
30000 1
0.6%
40000 1
0.6%
84000 1
0.6%
Sysmiss 1801
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.