IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
259306
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.5.32 - How much in total did you pay hired labor to harvest this [PLOT]? (d532b_3)

Data file: lwh_baseline1b

Overview

Valid: 86
Invalid: 1876
Type: Discrete
Decimal: 0
Start: 16002
End: 16009
Width: 8
Range: -8888888 - 126000
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-8888888 Doesn't Know 0
0%
700 4
4.7%
800 1
1.2%
1000 1
1.2%
1200 6
7%
1400 11
12.8%
1500 1
1.2%
1600 1
1.2%
1800 2
2.3%
2000 2
2.3%
2100 6
7%
2400 2
2.3%
2800 5
5.8%
3200 1
1.2%
3500 6
7%
4200 3
3.5%
4300 1
1.2%
5000 1
1.2%
5600 4
4.7%
6000 2
2.3%
6600 1
1.2%
7000 5
5.8%
8400 2
2.3%
9500 1
1.2%
9600 1
1.2%
11200 1
1.2%
11900 1
1.2%
12000 1
1.2%
16000 1
1.2%
16800 1
1.2%
19200 1
1.2%
20000 1
1.2%
24000 1
1.2%
24500 1
1.2%
25000 1
1.2%
28000 1
1.2%
31500 1
1.2%
33600 1
1.2%
84000 1
1.2%
86400 1
1.2%
126000 1
1.2%
Sysmiss 1876
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.