IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
230224
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.8.3 - What type of post-harvest infra-structure? (d83b_5)

Data file: lwh_baseline1b

Overview

Valid: 26
Invalid: 1936
Type: Discrete
Decimal: 0
Start: 16355
End: 16355
Width: 1
Range: 1 - 7
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 Ikigega 0
0%
2 Umutiba 0
0%
3 Ihema 1
3.8%
4 Ubuhunikiro rusange 0
0%
5 Umufuka 24
92.3%
6 Dring structure Ubwanikiro 1
3.8%
7 Gusharika 0
0%
Sysmiss 1936
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.