IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
258119
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

D.8.4 - How much [CROP] (kg) did you store in this post-harvest infra-structure? (d84b_3)

Data file: lwh_baseline1b

Overview

Valid: 181
Invalid: 1781
Type: Discrete
Decimal: 0
Start: 16372
End: 16378
Width: 7
Range: -888888 - 400
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-888888 Doesn't Know 0
0%
0 1
0.6%
1 1
0.6%
1.5 2
1.1%
2 4
2.2%
3 1
0.6%
4 2
1.1%
5 5
2.8%
6 1
0.6%
7 1
0.6%
10 10
5.5%
12 1
0.6%
15 12
6.6%
16.5 1
0.6%
17 1
0.6%
18 2
1.1%
20 18
9.9%
25 2
1.1%
30 10
5.5%
33 1
0.6%
35 1
0.6%
40 9
5%
42 1
0.6%
43 1
0.6%
45 3
1.7%
48 1
0.6%
50 20
11%
55 1
0.6%
56 1
0.6%
60 6
3.3%
62 1
0.6%
65 1
0.6%
70 9
5%
75 1
0.6%
80 7
3.9%
85 1
0.6%
90 1
0.6%
91 1
0.6%
95 3
1.7%
98 1
0.6%
100 9
5%
105 1
0.6%
110 3
1.7%
140 1
0.6%
149 1
0.6%
150 2
1.1%
152 1
0.6%
160 1
0.6%
162 1
0.6%
170 2
1.1%
195 1
0.6%
200 2
1.1%
220 1
0.6%
250 3
1.7%
255 1
0.6%
260 1
0.6%
270 1
0.6%
275 1
0.6%
300 1
0.6%
400 1
0.6%
Sysmiss 1781
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.