IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
257030
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

H.2.1. What is the main construction material of the walls of your house? (h21)

Data file: lwh_baseline1b

Overview

Valid: 1962
Invalid: 0
Type: Discrete
Decimal: 0
Start: 17893
End: 17894
Width: 2
Range: 1 - 12
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 Adobe / Unburnt bricks 996
50.8%
2 Cement bricks 18
0.9%
3 Fired bricks 63
3.2%
4 Planks 2
0.1%
5 Cemented mud and wattle 196
10%
6 Uncemented mud and wattle 425
21.7%
7 Wattle and reeds 246
12.5%
8 Thatch 0
0%
9 Cement 10
0.5%
10 Stones 3
0.2%
11 Plastic 0
0%
12 Other (specify) 3
0.2%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.